Everything below is unlocked for the company, with the most comprehensive level of each software.
ERP: company management
Quotes, construction sites, invoices and teams in a single tool. You receive the most comprehensive ERP package, for 5, 20 or 30 users depending on your plan.
- Quotes with integrated ACIP price base, addenda and extras, daywork sheets and hours on mobile
- Invoices with Swiss QR-bill and payment matching; stage invoices, advance payments, retention money and final account
- Team and machinery planning, machinery fleet and tools
- Cost tracking per construction site: overheads, actual profit, comparison between construction sites
- Purchasing: material requests, purchase orders, supplier invoices per construction site, payment file
- Price variation (price escalation) on stages, manually or by official index
- Subcontractors: compliance file with alert or blocking, contracts, received stages, evidence file
- AI reading of supplier invoices (monthly quota included)
- Routine management modules: projects, CRM, timesheets, calendar, contracts, accounting, HR, recruitment, budget
- Integrated studios: diaphragm wall, insulation, geo-scanner, hourly cost simulator, cutting and tiling optimization
View software →
Portail: construction site tracking with your clients
Progress, photos and construction log shared with your clients, who do not need a password.
- A construction site activated in one click; the client receives a personal link by email
- Photos, documents, construction log and milestones that you advance
- Addenda, daywork sheets and handover: the client accepts, refuses or signs online, with date, time and name
- Choice of materials with photo, extra and deadline
- Annotated plans with pins, quality controls with non-conformity tracking
- Construction meeting minutes signed by those present
- Schedule and amounts due for the client, advance payments by Swiss QR-bill
- Unlimited active construction sites, employees and clients
- Data in Switzerland, 90-day recycle bin, complete export at any time
View software →
Soumissions: professional tools
Price your bids with the real ACIP price database. The request market and Simap public calls for tenders remain free.
- Pricing assistant: an ACIP price for each item in a description, in three ranges (low, medium, high) adjusted to the canton and city
- SIA 451 import and reader: .crbx, .01s and .xml files; the architect's text is never modified; items without prices flagged before sending
- Excel export with subtotal formulas, numbered draft quote
- Photo estimation (AI): up to 5 photos and a description provide an indicative estimate that you correct then send in PDF to your client (monthly quota included)
- Paid studios: Take-Off and take-off, SIA 451 reader and editor, wall section, insulation, construction site-crane-scaffolding plan
- Simap public calls for tenders: over a thousand open at any time, creation of a pricing file in one click
View software →
Plans Pro: 2D/3D plans, take-offs and BIM
Draw, measure and prepare the construction site in the browser, with projects stored in Switzerland.
- 2D and 3D plans: walls, slabs, doors and windows, plans by floor, sections and facades with Swiss title block, A0 to A4 formats
- Surfaces according to SIA 416, with Excel export
- PDF and DXF exports, opening of your partners' IFC models
- Take-offs on PDF plans: scale, lengths, surfaces, volumes; each measurement is linked to an ACIP item; quantities go in one click into an ERP quote
- BIM viewer: IFC 2x3, 4 and 4.3 files, floor cut, quantities by element type, model shared in read-only with the client in the Portal
- AI plan analysis: AI suggests rooms and surfaces, you check (monthly pages included)
- Number of items depending on the size of your package
View software →
Processus: your company's working method
Write, apply and track your ways of doing things on each construction site, without the boss having to be everywhere (BOSS method).
- Around 100 construction procedures in six areas to adapt: management, standardize, construction site, sales and clients, team, money and administration
- Checklists on phone with photos, usable without network
- Traffic light dashboard, commitments list, short meeting prepared by the software
- Construction site and safety: handover, preparation, safety talk, self-control, addenda, acceptance, final file
- Team: recruitment, onboarding, skills, apprentices; salaries and medical data visible to the boss only
- Money: collection, deadlines, cost price, cash flow (to be checked with your fiduciary)
- 209 functions listed: 155 available today, others under construction or planned
- No GPS, no worker ranking; complete export of your data
View software →
Académie: "Free Boss" training
Video training to run a construction company, at your own pace.
- 22 video training courses in 6 modules, over 60 hours
- Create and organize your company, sales and client relationship, marketing, finances and prices, team and human resources, leadership
- General business management courses; videos in French, interface in 12 languages
- Access on the account that purchased the Pack (one license per person)
View software →
Complete ACIP price database
Our construction price index, open only to paid subscriptions.
- Over 14,000 price items in 35 chapters, 2026 indexing
- Open in the ERP (Quote module), in Soumissions (pricing assistant, photo estimation, studios) and in Plans Pro (each measurement linked to an item)
- Three ranges, low, medium and high, adjusted to the canton and city
- During a free trial, a demo list with fictitious prices, clearly marked, replaces the real list
- Fair use: reading limits per day and per month protect the database
Art Construction Express modules: paid versions
Free modules remain open to all. In the Pack, you open their paid version, including upcoming ones.
- Saving per construction site with versions, reloading a project, export in company colors and without watermark, ACIP price proposals, sending to quote
- Take-off and reading: Take-Off and take-off on PDF plan, SIA 451 tender reader and editor, 3D BIM-IFC viewer and inspector
- Construction site: plot Geo-Scanner, 2D site installation plan, construction site-crane-scaffolding plan, Gantt schedule (OTConst, SUVA)
- Calculation: wall section (U-value, Glaser), insulation (thermal, moisture, acoustic, fire), hourly cost simulator, cutting optimization and panel layout
- Announced, open upon release: construction site statics, 2D thermal bridges, excavations-slopes-shoring, heat pump-noise-solar
- Each studio opens in the software that includes it: Soumissions, ERP, Portal, Plans Pro
View software →
In the All-Inclusive Pack, all integrated Suite Pro modules are unlocked. Free Express Modules remain open to everyone.