Art Construction · Processus

Studio MSST CFST 6508 & QR procedure sheets

A clear field procedure sheet (12 steps at most, annotated photos, PPE, STOP points), a 10-point MSST self-assessment and an A4 poster to laminate. Everything happens in your browser: nothing is sent, nothing is saved.

Session in RAM: closing or reloading the page clears the sheet. Export the PDF before leaving.

1 Field procedure sheet

CRB CFC nomenclature codes, usual short descriptions (to be verified in the current edition).

Steps

0 / 12

Drag the ⠿ handle to reorder, or use the arrows. A "STOP" step is displayed in red: work does not proceed until the condition is lifted.

    2 MSST self-assessment in 10 points

    The 10 items follow the structure of the MSST system from CFST directive 6508. The employer is required to take the necessary preventive measures (art. 82 LAA). This diagnosis is an aid to reflection, not a certificate of conformity.

    0 / 100 · 0 / 10 completed

    3 A4 poster preview

    Save, share with the team, offline QR → Process Mode

    The free version creates one record at a time, in random access memory, with a QR code pointing to the Processus page. Processus mode (Art Construction online application) additionally does:

    Discover the Processus mode