Skip to content
0
Sign in Sign up
Training
Categories Setting up and organising your companySales and customer relationsMarketing and visibilityFinance, prices and paymentsTeam and human resourcesLeadership and personal development Training All training coursesCertificate validation
Subscriptions
Trainers
Find a trainerBecome a trainer
Community
Resources
Basket
Change language: French
Training

Sheet-Metal Work, Roofing & Pitched Roofs: CFC Certified Training in Switzerland (6-Lesson Programme)

CFC 224 certified sheet-metal work and roofing training: 6 lessons to master SIA 232 standards, SUVA safety rules and the OTConst on Swiss sites.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Any lack of watertightness or under-tile ventilation damages the roof timber structure. Rectification pursuant to SIA 118 cuts margins by roughly 15 to 30 %, entirely at the contractor's expense.
  2. Legal / Joint Body / SUVA: Falling without safety barriers at eaves purlins constitutes an offence. The employer must implement protective measures under art. 3 OPA and secure roof edges for falls of 2 m or more under art. 41 OTConst. An accident triggers criminal liability for breach of the recognised rules of construction (art. 229 CP).
  3. Administrative / Handover: Refusal of acceptance by site management due to non-compliant roof pitches blocks invoicing. Employing staff without a federal certificate of capacity under art. 38 LFPr exposes the company to disputes and payment delays.

Mastering the building envelope requires rigorous technical expertise, particularly in the specialised fields of sheet-metal work and pitched roofing. The CFC 224 certified training programme is designed directly for apprentices, skilled workers and foremen seeking to formally validate their skills according to the strict requirements of the Swiss construction market. Structured into six intensive lessons, this course covers the full range of practical skills needed, from understanding SEFRI training ordinances to applying Building Envelope Switzerland directives in the field. Participants learn how to execute complex flashing connections, correctly calculate air cavity ventilation and guarantee absolute roof watertightness, while strictly adhering to tolerances dictated by trade practice.

Beyond practical execution alone, this vocational training places an absolute focus on vital safety and legal compliance on construction sites. Working at height exposes professionals daily to life-threatening hazards, requiring strict enforcement of the Ordinance on Construction Work (OTConst). Learners are trained in the systematic installation of collective protective equipment, such as sheet-metal workers' platforms and safety netting, as well as the management of mandatory work stoppages in the event of high winds, snow or black ice. By incorporating verification protocols, defect management under the SIA 118 standard and modern digital tools for site progress monitoring, this course provides employers with highly skilled personnel capable of preventing defects and safeguarding project profitability.

Official framework, federal ordinances and industry governance

Practising the trades grouped under CFC code 224, which encompasses architectural sheet-metal work and pitched roofing, is governed by a rigorous federal regulatory framework. Two ordinances from the State Secretariat for Education, Research and Innovation govern apprenticeships and qualifications: SEFRI Ordinance No 46203 for the sheet-metal worker CFC trade and SEFRI Ordinance No 45402 for the roofer CFC trade. In accordance with art. 15 LFPr, initial vocational training enables trainees to acquire the essential skills to perform building envelope work autonomously. Pursuant to art. 16 LFPr, it is delivered across three complementary learning venues: the host company for daily practical work, the vocational school for theoretical and technical knowledge, and inter-company courses under art. 23 LFPr to master specialised folding, welding and underlay installation techniques. The apprenticeship pathway lasts three or four years pursuant to art. 17 LFPr, concluding with the award of the federal certificate of capacity under art. 38 LFPr upon passing the qualification procedure governed by art. 30 OFPr.

From a contractual and social perspective, firms and their employees are subject to the Building Envelope Switzerland CLA. This universally binding collective labour agreement establishes minimum wage scales, manages overtime in accordance with art. 9 LTr and art. 13 LTr, and sets out the early retirement scheme managed by the RESOR foundation. Regular audits carried out by the joint commission ensure strict compliance with these working conditions. Concurrently, technical design and on-site execution rely on recognised engineering standards, primarily SIA 232 for pitched roofs, SIA 118 for general conditions for construction work, and directives issued by the Building Envelope Switzerland trade association, ensuring long-term structural durability against Swiss climate demands.

Pedagogical syllabus of the course in six lessons

The CFC 224 certified continuing education curriculum is structured around six progressive teaching modules, tailored to meet the practical demands of Swiss construction sites and bridge execution gaps in the field:

L1: Trade Profile, SEFRI Ordinance, CLA/CN Joint Rights (FAR/RESOR) & SIA Normative Framework

This opening lesson establishes the tradesperson's role within the Swiss legal and regulatory framework. Learners examine in detail the prerogatives set out in SEFRI Ordinance No 46203 and SEFRI Ordinance No 45402. The module explores how labour law, the Building Envelope Switzerland CLA and mandatory social contributions for the industry's early retirement scheme interact. Participants learn to identify contractual responsibilities governed by the SIA 118 standard and incorporate the general execution criteria of the SIA 232 standard right from the tender review stage.

L2: Best Practice, Technical Implementation & Operational Procedures on Swiss Construction Sites

Dedicated to building practice, this session covers cutting, forming and soldering standard sheet-metal materials, such as titanium zinc, copper, aluminium and galvanised steel. It covers thermal expansion principles for metals and the hydraulic sizing of gutters and downpipes. For roofing, the training details secondary framing installation, the application of underlay membranes and the laying of clay or concrete tiles, taking into account snow and wind loads specific to high-altitude zones pursuant to the SIA 232 standard.

L3: Critical Hold Points, SIA 414 Tolerances, Testing Protocols & Substrate Acceptance

This module focuses on critical quality-assurance hold points before roof assemblies are permanently sealed. The tradesperson learns methods for checking purlin and rafter alignment against permissible tolerances under the SIA 414 standard. The course covers non-destructive testing protocols for underlays, air and water tightness testing, as well as formalising written substrate acceptance with site management before commencing sheet-metal or roofing work.

L4: SUVA Vital Safety Rules, OTConst Provisions, OELs & Mandatory PPE/CPE

Full worker protection forms the cornerstone of this module. Under art. 82 LAA and art. 3 OPA, employers and their crews must apply all necessary preventive measures. The lesson details the implementation of the health and safety plan under art. 4 OTConst and the duties of the competent person designated under art. 5 OTConst. Technical specifications for guardrails and scaffolding are examined under art. 22 OTConst, art. 23 OTConst and art. 26 OTConst, with particular focus on art. 41 OTConst for roof edge safety for fall heights of 2 m or more. Regulations on wearing safety helmets with chinstraps under art. 6 OTConst and working under adverse weather conditions under art. 37 OTConst complete this module.

L5: Costed Case Study of an Actual Damage Claim, Right to Remediation & Calculation of Value Reduction under SIA 118

Dedicated to construction disputes, this lesson details the financial and legal management of defective workmanship. Learners examine the progression of a claim procedure for construction defects under the SIA 118 standard. The course teaches precise costing of defect-related remedial work, the distinction between complete rectification at the contractor's expense versus granting a compensatory price reduction, and the criminal liability implications of gross negligence under art. 229 CP when endangering life or limb on the construction site.

L6: Practical Application with Art Construction (Mobile Checklists, Voice Reports, SIA 451, Magic Link & 30-Question MCQ Exam)

The final module modernises construction site management using Swiss digital solutions. Participants learn how to configure mobile inspection checklists, generate timestamped voice-recorded site minutes, import bill-of-quantities descriptions using the SIA 451 standardised data exchange format, and deliver technical submittal files to site management via secure, password-free access links. A comprehensive summative assessment concludes the course.

Summary table of the certified training pathway

Lesson learnedTarget competencyEvidence or deliverable
L1Mastery of the contractual, collective agreement and federal regulatory frameworkAdministrative analysis sheet for a construction contract
L2Compliant technical execution of sheet-metal work and tilingSetting-out layout drawing and eaves flashing junction detail
L3Quality control, compliance with tolerances and substrate validationJoint acceptance protocol for the roof underlay
L4Strict application of the Ordinance on Construction WorkValidated site safety plan with collective protection inventory
L5Legal processing and costing of building envelope defectsComparative schedule: complete rectification versus price reduction
L6Digitalisation of quality processes and theoretical validationCompleted digital checklist and multiple-choice examination certificate

Critical technical requirements and occupational safety hold points

Envelope durability and structural timber preservation require strict adherence to the following critical quality hold point: Minimum ventilation cross-section for the air cavity under tiles >= 200 cm2/m; minimum tile pitch and sealed underlay laps. Insufficient ventilation under tiles leads to accelerated interstitial condensation, rotting counter-battens and fungal growth within the thermal insulation. Complying with minimum pitches under the SIA 232 standard alongside taped underlay joints ensures complete watertightness during wind-driven driving rain.

Regarding worker safety, the following safety hold point is mandatory: Fall arrest barriers secured to eaves purlins + safety netting for fall heights of 2,00 m or more; mandatory work stoppage in high winds, snow or black ice. Under art. 41 OTConst, roofing operations require edge protection to prevent falls whenever the drop exceeds 2 m. Barrier railings firmly anchored to the wall plate, combined with compliant safety netting, protect roofers when moving across battens. Winter weather or violent winds present immediate slip or blow-off hazards requiring immediate cessation of roof work to safeguard worker physical integrity.

Assessment terms and certification protocol

Obtaining professional certification relies on a rigorous examination protocol designed to verify the candidate's practical and standards-based mastery:

  • A timed theoretical examination comprising 30 multiple-choice questions, covering the entire syllabus from SEFRI Ordinances No 46203 and No 45402 to the specifications of the SIA 232 standard.
  • A minimum passing score of 80 % correct answers to pass the written test.
  • A practical case study involving a construction dispute and rectification work, complete with full costing of corrective repairs.
  • Mandatory validation of the digital workflow, covering three operational steps: configuring a mobile handover checklist for CFC 224, recording joint site minutes via structured voice dictation, and sharing the full technical approval file with the client using a secure direct-access link.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and situations presented below are illustrative examples intended for training purposes. In a typical scenario involving the construction of a six-unit residential development in the canton of Vaud, a team of four qualified professionals carries out the installation of the clay tile roofing and the titanium-zinc sheet-metal work. During inspections at the roof eaves, the site management detects a connection defect on a zinc drip flashing: the metal apron does not adequately lap over the roof underlay membrane and features an insufficient hem, causing condensation run-off directly against the wall plate and into the edge insulation during repeated thunderstorms.

An immediate joint inspection reveals excessive moisture content in the roof timbers and the onset of superficial deterioration of the wall plate. Based on the provisions of standard SIA 118, the sheet-metal and roofing contractor is formally served with a notice of defects. The solution adopted rules out any temporary mastic sealant fix and mandates the full replacement of the damaged timber, as well as the complete redoing of the zinc drip flashing with the careful removal of the first two courses of tiles, entirely at the sheet-metal worker's expense for an estimated 14 500 CHF in corrective works. The site management oversees the drying out of the load-bearing elements, hygrometric testing, and the installation of a continuous apron fabricated in accordance with trade best practice, certified by a joint acceptance report of the remedial work guaranteeing the long-term durability of the structure.

Free tools by Art Construction

Seventy-eight Swiss calculators and generators to put what you have just read into practice, with no sign-up required.

View the 78 free tools

Frequently asked questions

Can a sheet-metal worker work on a pitched roof without facade scaffolding?

The employer must comply with accident prevention regulations. According to art. 26 OTConst, facade scaffolding is mandatory from a drop height of three metres. Art. 41 OTConst imposes appropriate measures from a fall height of two metres, such as a roofer's bracket scaffold or guardrails. On steep roofs, a cherry picker remains necessary. By way of illustration, the costs of a perimeter edge protection system amount to 3 500 CHF to secure the slopes.

What under-tile ventilation requirements does standard SIA 232 prescribe?

Standard SIA 232 and the Building Envelope Switzerland guidelines require a minimum ventilation cross-section for the air space beneath tiles of at least 200 cm2 per linear metre. Inadequate counter-battening creates damaging condensation under the roof underlay. Poor ventilation can force the craftsman to dismantle the work, with remedial work estimated by way of illustration at 6 000 CHF to restore the eaves air intakes.

How is a claim for an improperly connected drip flashing handled under standard SIA 118?

The site management issues a formal notice of the defect found at the bargeboard or fascia. Under standard SIA 118, the contractor holds an imperative right to remedy the defect. The contractor must replace the sheet-metal waterproofing and cover the removal of waterlogged timber. For an incident causing moisture ingress into a wall plate, the technical repair costs typically hover around 8 500 CHF, borne by the liable contractor.

Who bears criminal liability in the event of an accident on a pitched roof?

Pursuant to art. 229 CP, anyone directing or performing work who wilfully or negligently breaches the recognized rules of construction incurs criminal liability in the event of endangerment to life or limb. In addition, art. 5 OTConst requires the appointment of a safety officer on the construction site. Following a fall caused by the absence of an eaves barrier, expert assessments costing an illustrative 4 200 CHF may be commissioned.

What are the admission requirements for the adult qualification under CFC 224?

Art. 32 OFPr allows access to the qualification procedure without a formal apprenticeship if the candidate can demonstrate at least five years of professional experience in sheet-metal work or roofing. Art. 38 LFPr guarantees the issuance of the Federal Diploma of Vocational Education and Training upon passing the examinations. Inter-company and preparatory courses represent an investment of around 4 800 CHF, often covered by joint parity funds.

What is the impact of the Building Envelope CLA on breaks and working hours?

The Building Envelope Switzerland CLA strictly regulates working hours in conjunction with art. 9 LTr and art. 15 LTr. Rest breaks must total at least thirty minutes if the working day exceeds seven hours. In severe winter weather or extreme heat, art. 37 OTConst mandates appropriate measures. Bad-weather compensation of around 320 CHF per day per worker may apply according to agreements.

Skills validation and construction site compliance

Mastering sheet-metal work and roofing demands uncompromising discipline balancing technical standards, occupational safety, and execution quality. Through this structured training pathway, every professional secures their trade practice in accordance with standard SIA 232 and statutory requirements. Access our interactive assessment modules to test your knowledge, configure your mobile inspections, and ensure the complete compliance of your roofing projects.

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.