Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

How to Check that a Construction Staffing Agency Holds Cantonal and SECO Licences (LSE)

Verify SECO and cantonal LSE licences of Swiss staffing agencies in French-speaking Switzerland to safeguard your contracts and site wages.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Loss of wages or unpaid allowances often amounting to several thousand CHF if an unlicenced entity fails, owing to non-compliance with industry wage scales under art. 20 LSE.
  2. Legal / Joint Body / SUVA: Work stoppage during a joint-body or cantonal inspection, as operating without a licence exposes the entity to criminal prosecution under art. 39 LSE, which provides for a fine of up to 100 000 francs for unlicenced staff leasing.
  3. Administrative / Acceptance: Immediate cancellation of mission contracts and expulsion of the operative from the construction site by site management during access controls carried out under the authority of the cantonal labour office.

This guide sets out the licence verification process for construction tradespeople and candidates seeking an assignment in French-speaking Switzerland. Art. 2 LSE requires any recruitment activity carried out regularly for remuneration by an agency to be licenced by the cantonal labour office. For deploying temporary personnel on construction sites, art. 12 LSE requires a separate cantonal licence for employers acting as staff leasing companies.

Before accepting an on-site assignment, every worker must check that the agency is listed on the federal public register maintained by SECO. This check ensures that the mandatory financial collateral has been lodged, that collective wage scales apply, and that the administrative setup of the assignment complies fully with the regulations of the canton concerned.

Verification method using the public register of staff leasing agencies

To ensure that an agency operating in structural work or finishing work is compliant, candidates or company managers should first consult the official SECO directory. This tool lists all entities holding the cantonal licence and the federal licence required whenever staff placement crosses cantonal or national borders. A compliant intermediary holds an official registration number confirming that the financial collateral has been lodged with the relevant authorities.

The search is conducted using the exact company name registered in the commercial register or the cantonal registered office of the branch. In French-speaking Switzerland, the cantonal employment office (such as the OCE in Geneva, the DGEM in the canton of Vaud, or the Service de l'emploi in Valais) checks the professional competence of the directors, their commercial good standing, and their compliance with operating standards. Without a valid entry, conducting this activity remains unlawful, which immediately compromises the mission contract and the artisan's social security cover.

Legal duties and contractual compliance of the staff lessor

The formal existence of a licence does not dispense you from checking the terms of the contracts binding the craftsman to the agency. Under art. 19 LSE, the staff lessor must enter into a written contract with the employee stating, in particular, the type of work, location, duration or notice period, working hours, pay and deductions; any agreements requiring advance fees from the employee are void. This baseline document guarantees transparent payroll statements and prevents arbitrary deductions from meal or travel allowances.

At the same time, as soon as the assignment is carried out for a firm subject to a generally binding CLA, art. 20 LSE requires the staff lessor to apply the agreement's provisions on pay and working hours to the employee. Construction joint commissions conduct unannounced inspections to detect wage undercutting. Working through a licenced structure thus guarantees strict adherence to the wage scales applicable to operating personnel holding a federal certificate of capacity (CFC).

Comparison table of inspection criteria for a construction staffing agency

Criterion examined Licenced and compliant construction agency Unlicenced or questionable entity Direct impact on the operative
Status on the SECO register Active cantonal and federal licence No registration or struck-off status Lack of official financial collateral
Written employment contract Issued with all mandatory details under art. 19 LSE Verbal agreement or document missing key details Total uncertainty over deductions and notice periods
Registration or file processing fees No advance fees charged Registration or file opening fees requested Agreements deemed null and void under the LSE
Application of CLA wage scales Strict compliance with the CLA under art. 20 LSE Flat-rate pay below minimum rates Lost wages and delayed adjustments
Social security and tax declarations Compliant AVS and LAA affiliation and withholding tax Delayed certificates and unclear deductions Risk of breaches investigated by the cantonal authority

Common mistakes and financial prejudice for tradespeople

A common mistake is signing an assignment contract without verifying the full company name of the leasing agency, relying solely on a commercial trade name or an unregistered digital platform. During an on-site inspection conducted under the federal act on undeclared work, the cantonal inspection body examines declarations pursuant to art. 6 LTN. If the intermediary is unlicenced, the worker faces immediate expulsion from the work area and a freeze on daily allowances.

Another observed abuse is accepting deductions not provided for in the official scales for standard personal protective equipment. Amounts wrongfully withheld often reach roughly 400 CHF to 800 CHF on a monthly payslip. Checking beforehand with joint commissions and verifying the licence number protects against such losses.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following figures and situations are illustrative examples designed to guide construction professionals in their verifications.

Scenario 1: Structural work in the canton of Vaud

During the construction of an office complex requiring a team of 6 bricklayers, a temporary employment agency based in Lausanne offers personnel for immediate deployment. The site manager verifies the cantonal licence in the SECO database before the operatives arrive on site. The contract explicitly specifies the masonry qualification A wage rates pursuant to the local CLA. Because the licence is confirmed, onboarding proceeds without any risk of reassessment by the joint commission.

Typical Scenario 2: Finishing work and plastering in the canton of Geneva

A skilled plasterer is offered a 3-month assignment on a residential renovation project. The staffing agency requests 150 CHF in administrative file opening fees. The worker notes that the LSE prohibits charging advance fees and discovers that the firm is not listed on the public register of staff leasing agencies. By declining the offer and turning to an accredited recruitment agency, he secures pay for his hours worked at the official Geneva CLA rate.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Where can you check a construction staffing agency's licence for free?

Consult the online SECO public directory. This federal register lists every staff lessor holding a cantonal or federal licence to operate in Switzerland.

Can an agency charge registration fees to a candidate?

Under art. 19 LSE, agreements requiring advance fees from the employee are null and void. The agency may not charge any fee for handling your application file.

What penalty does an agency face for operating without a licence?

Art. 39 LSE provides for a fine of up to 100 000 francs for anyone who places or leases personnel without holding the required statutory licence.

What minimum hourly wage applies to a temporary assignment?

Under art. 20 LSE, the agency must apply the pay and working hours set by the extended CLA of the host trade, for example around 35 CHF gross.

Can a foreign agency post personnel to a construction site in Romandy?

Art. 12 LSE strictly prohibits leasing personnel recruited abroad into Switzerland. Only agencies lawfully established in Switzerland may operate on national territory.

What should you do if you doubt an agency's compliance?

Contact the cantonal labour inspectorate or the competent joint commission. For an individual wage dispute, seek advice from a qualified legal practitioner.

Verifying an agency's licences ensures your deployment on the construction site remains entirely compliant. To learn more about your contractual and wage rights in French-speaking Switzerland, explore our dedicated resources:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.