Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

How to Have a Foreign CAP, Bac Pro, BTS, or Engineering Degree Recognised by SEFRI in Switzerland

SEFRI procedure for foreign construction diplomas in Switzerland: equivalences, wage brackets, and cantonal steps for CAP, Bac Pro, and engineers.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Initial wage underclassification resulting in an illustrative shortfall estimated between 400 and 900 CHF per month under art. 322 CO compared to the salary of a Federal Diploma of Vocational Education and Training (CFC) holder.
  2. Legal / Joint Body / SUVA: Incorrect qualification on declarations of employment submitted to the joint commissions of the National Framework Agreement, exposing the employer to back-pay claims for contributions and collective agreement adjustments.
  3. Administrative / Acceptance: Rejection of the application by the State Secretariat for Education, Research and Innovation (SEFRI) due to incomplete supporting documents, blocking access to regulated positions or supervisory technical responsibilities.

This guide details the procedures for obtaining recognition of foreign vocational construction qualifications from Swiss federal authorities. It is designed for applicants holding a foreign certificat d'aptitude professionnelle (CAP), baccalauréat professionnel, brevet de technicien supérieur (BTS), or engineering degree, as well as for employers looking to benchmark their skills accurately.

The State Secretariat for Education, Research and Innovation reviews applications to issue level certificates or recognitions of equivalence with federal qualifications. This step determines the worker's placement on collective agreement wage grids and clarifies access to technical roles on Swiss construction sites.

SEFRI procedure and equivalence criteria for foreign diplomas

The State Secretariat for Education, Research and Innovation handles recognition requests for both unregulated and regulated professions in construction. In the main structural sector as well as in the finishing work trades, most occupations are not regulated professions in the strict sense of federal law; however, employers rely on the Federal Diploma of Vocational Education and Training (CFC) to establish the minimum collective agreement remuneration set out under art. 322 CO. The application is submitted online to SEFRI via the dedicated platform, accompanied by certified copies of diplomas, diploma supplements, detailed course syllabuses with hours, and certificates of practical experience.

For initial vocational training, the evaluation compares theoretical and practical curricula defined in federal training ordinances. Under art. 16 LFPr, initial vocational training comprises practical workplace training, classroom instruction, and, where appropriate, supplementary courses. SEFRI examines the duration of studies, the balance between school-based theory and in-company practice, as well as total workshop hours. When the file reveals significant differences, the authority issues a level certificate establishing indicative correspondence, without granting the formal title protected by art. 38 LFPr.

Technical Diplomas and Engineering Degrees

For foreign engineering degrees, SEFRI or swissuniversities directs the applicant depending on the nature of the awarding institution. University-level or applied-sciences tracks achieve academic-level equivalence (Bachelor or Master of Science). However, holding an operational role on a Swiss construction site does not automatically grant entry to the Swiss Register of Engineers, Architects, and Technicians (REG), which requires a separate evaluation of technical competencies and professional experience.

Mapping foreign qualifications to the Swiss vocational system

The table below summarises the standard equivalences observed by joint commissions and SEFRI for construction profiles:

Original qualification (France)Swiss reference qualificationSEFRI recognition statusIndicative collective agreement classificationPossible supplementary requirement
Certificat d'Aptitude Professionnelle (CAP)Federal VET Certificate (AFP) or CFC depending on durationLevel certificate or CFC equivalenceSkilled worker Class A or BAdditional practical experience if 2-year programme
Baccalauréat Professionnel (3 years)Federal Diploma of Vocational Education and Training (CFC)CFC equivalence recognitionSkilled worker Class Q or Class ADossier-based procedure with course descriptions
Brevet de Technicien Supérieur (BTS)Advanced Federal Diploma of Higher Education (ES)Tertiary level B certificateSite manager / Construction technicianVerification of Swiss financial management modules
Licence Professionnelle (Construction Trades)Bachelor from a University of Applied Sciences (HES)Tertiary level A academic certificateTechnical manager / Deputy project managerAcademic application via swissuniversities
Diplôme d'Ingénieur (CTI-accredited)Master from a University of Applied Sciences or ETH/EPFL (HES / EPF)Master's level recognitionProject engineer / Site managementOptional application for REG listing

Common recognition mistakes and financial consequences

The most frequent mistake is applying to structural work contractors without prior SEFRI certification, claiming only the foreign title. In that case, the employer defaults to classifying the worker as an unskilled labourer (Class B or C), creating a collective wage gap of approximately 600 to 1 100 CHF gross per month compared to a CFC holder. Another common misconception involves holders of a two-year CAP seeking direct CFC equivalence: SEFRI frequently requires proof of at least two to three additional years of professional experience to compensate for the third or fourth year required under art. 17 LFPr for trades such as bricklayer, carpenter, or electrician.

Furthermore, neglecting to provide certified translations of official transcripts causes delays of several months with federal services, preventing retroactive wage reclassification during joint commission audits.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and situations below are illustrative examples intended to guide the equivalence process.

Scenario 1: Electrician with a Baccalauréat Professionnel in the Canton of Vaud

On a construction site for a six-storey office complex employing an average of twenty finishing work operatives, a foreign electrician is initially hired as an assistant installer. Holding a three-year Bac Pro in electrical engineering, he submits his application to SEFRI with complete transcripts. After examining the syllabuses, SEFRI issues an equivalence recognition to the electrician CFC (installateur-électricien). The craftsman presents this document to his employer, who amends his employment contract pursuant to art. 319 CO and the wage scales of the Vaud cantonal collective agreement, increasing his monthly wage by around 750 CHF.

Scenario 2: Structural work technician holding a BTS Bâtiment in the Canton of Geneva

A general contractor building a major residential project employs a technician with a French BTS Bâtiment as an assistant site manager. Lacking the Swiss site manager ES title (conducteur de travaux ES), the worker requests a level certificate from SEFRI. The document confirms a tertiary level equivalent to Swiss technical programmes. The company confirms his site supervisory classification without requiring a new examination, while providing internal training on local safety standards and quantity-surveying administration.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Which federal authority handles foreign construction diploma equivalences?

SEFRI examines applications under the Federal Vocational Training Act, issuing direct level recognitions or certificates allowing individuals to work in construction under individual employment contracts.

Does a foreign diploma automatically guarantee skilled-worker wages?

Under art. 322 CO, the employer pays the agreed wage or the rate set by collective agreement. A positive decision facilitates direct access to collective wage scales, for example around 5800 CHF.

How can practical experience be proven without an equivalent formal qualification?

Professionals can apply for admission to the qualification procedure under art. 32 OFPr after five years of verified practical experience, without necessarily obtaining a full preliminary recognition from SEFRI.

Can an employer verify the supporting documents submitted by an applicant?

Employers process diplomas in accordance with art. 6 LPD for proportionate and specified professional purposes, ensuring the validity of qualifications required for safety on Swiss construction sites.

What should you do if SEFRI refuses direct equivalence?

Applicants can register for cantonal examinations under art. 33 LFPr or complete inter-company supplementary training modules to validate the local technical skills required in structural work trades.

Does a foreign national need diploma recognition to obtain a work permit?

Under art. 11 LEI, the work permit depends on the application filed by the employer. SEFRI recognition strengthens the applicant's profile but does not replace the administrative permit issued by cantonal migration authorities.

Obtaining recognition for a foreign qualification secures your contractual and salary status within the Swiss construction market. Continue your professional planning with our specialised guides:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.