Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

Meal Allowances, Mileage Reimbursements and Depot-to-Site Travel Time under the CN and CCT SOR

CN and CCT SOR guide: calculating meal allowances, mileage reimbursements and tracking depot-to-site travel time in Swiss construction.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Back payments for unpaid meal allowances and vehicle expenses, potentially amounting to arrears of roughly 3 000 CHF to 5 000 CHF per worker over a calendar year under art. 322 CO.
  2. Legal / Joint / SUVA: Upward adjustment during an audit by the joint committee for non-compliance with collective agreement travel rates, combined with a challenge regarding working time records under art. 73 OLT 1.
  3. Administrative / Acceptance: Blocking of the joint committee compliance certificate required for cantonal public procurement and individual wage disputes delaying the closing of accounts under art. 319 CO.

This guide details employer obligations and the entitlements of workers, site foremen and site managers regarding midday meal allowances, mileage reimbursements and travel time between the depot and construction sites. Strictly applying collective agreement scales guarantees that monthly statements comply with audits conducted by the competent joint vocational committee.

In Swiss construction, travel time between the company depot or head office and the work location constitutes actual working time subject to compensation. The distinction between ordinary commuting from home to the company base and operational travel ordered by the employer determines eligibility for transport allowances and the daily meal allowance.

Meal allowance scheme and collective agreement criteria

Entitlement to the midday meal allowance depends on the geographical distance to the construction site and the practical impossibility for the worker to return home or to the main depot during the lunch break scheduled under art. 15 LTr. Both in structural work governed by the National Collective Agreement (CN) and in finishing work trades under the French-speaking collective labour agreement (CCT SOR), the flat-rate meal allowance offsets the actual extra costs of eating out.

Payment is mandatory whenever a worker is assigned to an external work site without appropriate infrastructure provided free of charge by the employer (an equipped refectory or heated site hut allowing food to be reheated). This flat-rate allowance does not constitute a salary component subject to AVS/AI/APG social contributions provided it complies with the rates approved by tax and joint supervisory authorities. Any failure to pay it constitutes a due wage claim under art. 322 CO, which can be claimed during regular audits carried out by the competent joint vocational committee.

Mileage reimbursement and legal status of travel time

The legal status of travel time depends on the starting point and instructions issued by the employer. When a worker travels directly from home to the permanent company depot or headquarters, this commute falls under their private sphere and is unpaid. Conversely, any transport between the depot and the construction site, or between different construction sites during the day, constitutes actual working time. The daily and weekly durations of this work must be recorded in the time logs required by art. 73 OLT 1.

If the employer provides a company vehicle to transport the crew from the yard, both the driver and the passengers travelling under company orders are on paid working time. If an employee uses their private vehicle at the express request of the site management or company, the mileage allowance must cover depreciation, fuel and insurance, in line with applicable collective agreement scales or current regional practice.

Comparison table of expense allowances and transport schemes

Type of journey or expenseLegal status of timeCompensation termsSocial security status (AVS/LPP)Impact on time tracking
Home to permanent depotUnpaid private commutePersonal costs borne by the employeeExempt from contributionsExcluded from working time records
Depot to construction site (company vehicle)Actual working timeStandard collective agreement hourly wageSubject to contributions under art. 322 COCounted toward LTr weekly working hours
Construction site to construction site during the dayActual working timeStandard collective agreement hourly wageSubject to standard contributionsIncluded in daily timesheets
Midday meal on a remote construction siteUnpaid break time (art. 15 LTr)Flat-rate meal allowance under CN or CCT SOR ratesExempt from social security contributionsMinimum break recorded under art. 73 OLT 1
Mandatory travel in a private vehicleActual working time (driving time)Mileage allowance in CHF per kilometreNon-taxable business expensesDriving hours recorded as working time

Common booking errors and financial implications

A frequent error is arbitrarily reclassifying the first morning journey (depot to construction site) as private commuting merely because the employee rides in a shared company van. If reporting to the depot is required to load equipment or receive daily instructions, the entire journey constitutes working time. Failing to log it creates a risk of wage arrears for overtime under art. 321c CO, plus retroactive social security contributions.

A second common misstep involves unilaterally withholding the meal allowance when a worker eats their own packed lunch on a construction site that lacks proper shelter. Joint case law consistently holds that the allowance remains due as long as the firm fails to provide compliant facilities on site. Retroactive adjustments can reach around 4 500 CHF per employee over a full financial year.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following figures and situations are illustrative examples designed to guide administrative accounting. In the canton of Vaud, a masonry firm employing a crew of 4 workers is building an administrative facility. The morning gathering point is scheduled at the company depot at 06:45 to prep tools and load the vehicles. Departure for the construction site takes place at 07:00, arriving on site at 07:45.

The chosen approach involves logging the 45 minutes of travel time in timesheets under art. 73 OLT 1, since this time counts as actual work. Because there is no company canteen, the workers eat on site and receive the full daily meal allowance in accordance with collective agreement rates. This rigorous tracking prevents any dispute before the joint committee during inspections enforcing generally binding collective agreements under the LECCT.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Is travel between home and the company depot reimbursed under the CN?

No, this commute belongs to the private sphere. However, travel time between the depot and the construction site counts as paid actual working time governed by art. 319 CO.

What is the standard daily meal allowance rate in Swiss structural work?

Collective agreements generally set midday meal expense allowances between 16 and 20 CHF per worked day, paid without deductions according to standard joint committee scales.

Can an employer require the use of a personal vehicle without paying a mileage allowance?

The employer must reimburse expenses incurred in the performance of work. A mileage rate of around 0,70 CHF per kilometre is commonly applied to cover fuel, depreciation and wear and tear.

How are morning driving hours in a company vehicle treated?

The driver transporting the crew is performing mandatory working time. These hours must appear in the timesheets under art. 73 OLT 1 and entitle the worker to the wage set by the collective agreement.

Does a company canteen exempt the employer from paying the meal allowance?

If a full hot meal is provided free of charge on the construction site, the meal allowance is not due, provided this arrangement is expressly stipulated in the applicable collective agreement.

What should you do if there is a dispute over mileage reimbursement calculations?

The employee may contact the competent joint committee or a legal professional to claim payment of the agreed salary guaranteed under art. 322 CO.

Auditing allowances and managing contractual entitlements

Accurately distinguishing between travel time, vehicle allowances and meal allowances ensures payroll compliance with generally binding construction collective agreements. Explore our practical guides to secure your project accounting across the board:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.