Table of contents
The 3 Major Site Risks
- Financial / Margin: Trial work performed without a written agreement on pay under art. 322 CO, leading to wage disputes in the region of 250 to 450 CHF for the hours worked.
- Legal / Joint body / SUVA: Presence of an undeclared worker on the construction site, breaching the health protection duties laid down in art. 6 LTr and the requirements of joint commissions.
- Administrative / Acceptance: Confusing a simple vocational aptitude test under art. 21a LEI with the statutory probationary period governed by art. 335b CO, compromising the validity of the individual employment contract under art. 319 CO.
Job interviews in the construction sector in French-speaking Switzerland are based on very tangible assessment criteria. Facing a business owner or a site manager, the candidate must highlight their technical autonomy, their command of operational tasks and their strict compliance with occupational safety rules.
The practical trial day on a construction site is the decisive test to confirm manual skills and integration within the team. This practical guide sets out the steps to succeed during the technical interview, understand the legal status of trial hours, and turn this on-site trial into a firm job offer.
Technical assessment criteria and professional posture with the employer
Construction job interviews in Switzerland demand practicality and immediate reliability. A business owner or site manager seeks above all to verify the professional's autonomy, their ability to interpret execution drawings, and their operational rigour. During this interview, candidates must clearly outline their background by highlighting their Federal Certificate of Capacity (CFC) under art. 38 LFPr or their professional qualification equivalencies under art. 33 LFPr.
Understanding safety duties is the second key filter. Under art. 6 LTr, the employer is required to take all necessary measures to ensure the protection of workers' health and personal integrity. A candidate who demonstrates a thorough knowledge of SUVA directives and the OTConst secures a decisive advantage. For jobseekers referred by regional employment offices, this technical interview or professional aptitude test falls directly within the recruitment measures laid down in art. 21a LEI.
Operational framework and pay for the practical trial day
The trial day on the ground raises specific legal considerations that should be formalised before stepping onto the work site. The moment the candidate performs productive work integrated into the team's daily operations, the working relationship is governed by the individual employment contract defined in art. 319 CO. Under art. 322 CO, the employer is required to pay the agreed, customary, or generally binding collective labour agreement wage for the branch.
Working hours and break schedules must strictly comply with statutory limits, particularly art. 15 LTr for rest periods and art. 73 OLT 1 for entries in personnel records. If the trial leads to permanent employment, this first month of work will serve as the statutory probationary period under art. 335b CO, during which either party may terminate the contract by giving seven days' notice.
Comparison table: On-site behaviour during assessment
| Area assessed | Inappropriate or risky practice | Expected professional behaviour |
|---|---|---|
| Protective equipment | Arriving without appropriate safety footwear or personal hard hat | Systematic wearing of compliant personal protective equipment |
| Reading formwork plans | Starting work without checking blockout dimensions | Checking grid lines, identifying datum levels and confirming technical details |
| Workstation housekeeping | Leaving tools lying around and cluttering access routes | Keeping the work area clean, tidy and safe at all times |
| Team communication | Hiding a workmanship defect or improvising a quick fix | Immediately alerting the foreman to correct the variance |
| Contractual framework | Working several days without an agreement on pay | Clarifying the payment terms for the trial day under art. 322 CO |
Common mistakes and financial impacts for both parties
The most detrimental mistake for a company is hosting a candidate for a practical test without prior registration or a written agreement on compensation. In the event of an unannounced inspection by the cantonal authority under art. 6 LTN, this lack of traceability exposes the firm to administrative and joint commission disputes. For the candidate, working without a clear agreement can result in a loss of earnings of around 260 to 420 CHF for an unpaid day's labour.
Regarding attitude, a lack of planning for bad weather or refusing to assist the crew with site clear-up immediately tarnishes the applicant's reputation. Site management values team spirit, punctuality and compliance with environmental directives regarding the sorting of construction waste.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and scenarios presented below are illustrative examples intended to guide hiring processes on Swiss construction sites.
In the canton of Vaud, a general contractor is building a three-storey residential development. To fill a vacant position for a qualified formwork carpenter, the site manager calls in a candidate for a half-day technical evaluation. The exercise involves setting out an offset on a reinforced concrete wall and placing the rebar according to the engineer's drawings.
The company first formalises a practical test agreement providing for a flat-rate compensation of around 180 CHF for four hours, ensuring compliance with art. 322 CO and entry on the daily timesheet under art. 73 OLT 1. The candidate arrives fully equipped with personal protective gear, identifies a blockout discrepancy on the drawing before tying the rebar, and requests sign-off from the foreman. This demonstration of geometric accuracy and operational caution confirms their autonomy, leading to the immediate signing of an open-ended employment contract.
Wages and social charges: free tools
Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.
Frequently asked questions
Must a practical trial day be paid?
Under art. 319 CO, all work implies remuneration. The employer pays an agreed amount, for example around 240 CHF per day, to compensate for the time worked.
What is the notice period during the probationary period?
Under art. 335b CO, either party may terminate the contract with seven days' notice during the first month, guaranteeing payment of the agreed wage, around 1250 CHF per week.
How should hours be recorded during a site evaluation?
In accordance with art. 73 OLT 1, the employer logs actual daily working hours and breaks, ensuring an activity statement reflecting an indicative hourly rate around 35 CHF.
Which safety measures apply during the practical test?
Under art. 6 LTr, the employer takes the required protective measures and provides suitable equipment, with an indicative value around 190 CHF, which the worker uses.
What framework governs the final agreed hiring salary?
Under art. 322 CO, the employer pays the wage agreed upon or set by collective agreement, reaching, as an illustrative example, around 5500 CHF for a skilled worker.
Can a work certificate be requested after the trial period?
Under art. 330a CO, the worker may at any time request a certificate stating the nature and duration of their paid employment, around 320 CHF.
To ensure a successful hiring process in the Swiss construction sector, consult our additional guides:
- Swiss CV, Cover Letter, and Interview in the Construction Industry: The Complete Guide to Landing a Job
- Swiss CV Template for CFC Tradespeople and Foremen: Key Differences with a French or European CV
- Employment References and Phone Checks: Why Swiss Recruiters Verify Everything
- Debt Collection Register Extract and Criminal Record: When Can a Swiss Employer Request Them?