Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

Application File for Swiss Construction Executives (Site Manager, Draftsperson, Architect): SIA References

Swiss guide for applying as a site manager, draftsperson or architect. Showcase your project references under SIA 118 and art. 330a CO.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Errors in budget estimation or in applying quantity surveying under CRB catalogues, resulting in lost fees or construction margins on the order of 10% to 15% of the total construction cost.
  2. Legal / Joint Body / SUVA: Irregular transmission of references from former employers without prior consent, infringing the principles of lawfulness and good faith governed by art. 6 LPD during hiring checks.
  3. Administrative / Acceptance: Misunderstanding joint inspection protocols under SIA 118, leading to formal rejection of the works or the inability to remedy technical defects within agreed deadlines.

Recruiting a technical construction executive in Switzerland (site manager, architect or draftsperson) requires an impeccable application file grounded in Swiss professional practices. Engineering consultancies and general contractors evaluate an applicant's ability to lead site management under SIA 118 and to structure quantity surveying with CRB catalogues.

This methodological guide explains how to present past projects, how to present your work certificate legally under art. 330a CO, and how telephone reference checks work in French-speaking Switzerland. You will learn how to structure each project to demonstrate your operational rigor to site management teams and specialised recruiters.

Structuring your application file according to Swiss standards

For a site manager, architect or draftsperson role in Switzerland, candidate screening hinges on proof of immediate technical autonomy. Recruiters assess your mastery of planning processes, bill of quantities preparation using construction catalogues, and site management under the SIA 118 standard. Your application file must reflect contract management standards aligned with the expectations of Swiss clients.

Your curriculum vitae must include concise project summary sheets, sample design drawings or master schedules, as well as complete copies of your work certificates. Under art. 330a CO, employees may request at any time a certificate detailing the nature and duration of the employment relationship, as well as the quality of their work and their conduct. Employers examine these official documents carefully to assess your performance consistency and professional conduct.

Methodological table: key components of a technical executive file

How skills are presented varies significantly between design-oriented roles and operational construction roles. The table below outlines the concrete expectations of engineering consultancies, architectural practices, and general contractors in French-speaking Switzerland:

Target role Required supporting documents Expected technical standards Impact indicators to quantify Frequent disqualification criteria
Site manager Work certificates, sample site minutes, schedules SIA 118 standard, CRB catalogues Financial volume managed in CHF, schedule compliance Absence of compliant quantity surveying or financial monitoring
Project architect Portfolio of technical details, building permits Municipal regulations, floor area standards Usable floor areas, construction costs in CHF Design portfolio lacking regulatory feasibility
Architectural draftsperson Working drawings, junction details SIA standards, open digital building models Number of trade packages coordinated, construction tolerances Incompatible drafting deliverables
Site manager Works contracts, final accounts SIA 118 standard, management of addenda Final budget variance in CHF, dispute resolution Lack of familiarity with formal acceptance procedures
Project lead civil engineer Structural calculations, formwork and reinforcement drawings Swiss structural standards, occupational safety Steel tonnages, concrete volumes in cubic metres Lack of experience with Swiss soil conditions or seismic standards

Showcasing project references and legal compliance

Telephone reference checks are a decisive stage in Swiss executive recruitment. Prospective employers contact your former line managers to verify your precision in cost tracking and your conduct of construction site meetings. This process must comply with the Federal Act on Data Protection. Under art. 6 LPD, personal data processing must be lawful, carried out in good faith and proportionate, and data must be collected for specific and recognizable purposes. You must obtain express consent from each reference before providing their contact details.

On site, crew working hours are governed by strict legal provisions. Art. 9 LTr sets the maximum weekly working time at 45 hours for technical staff and industrial enterprise employees, and at 50 hours for other workers. A site manager must demonstrate the ability to plan schedules without triggering structural overruns contrary to the provisions of art. 12 LTr on overtime.

Recurring application mistakes and financial impacts

The first mistake is using foreign terminology that is not recognized in Switzerland. Citing inapplicable contractual frameworks instantly damages an applicant's credibility. Poor wording in site minutes or a misunderstanding of SIA 118 can create cost overruns during trade contract settlements, frequently causing margin losses of 40 000 CHF to 120 000 CHF on a mid-sized construction site.

The second shortcoming is failing to quantify the projects managed. A Swiss technical executive must specify the value of managed works in CHF, the complexity of earthworks, or the number of design consultants coordinated. Finally, omitting work certificates in the format required by art. 330a CO raises concerns among human resources directors, delaying the hiring process by several weeks.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The financial amounts and operational figures below are illustrative examples intended to guide the structuring of a standard application file.

Standard scenario 1: Senior site manager in the Canton of Vaud

On a multi-family residential project of three buildings representing a construction cost of approximately 18 500 000 CHF, the applicant highlighted local site management under SIA 118 with an on-site workforce of 45 workers. The candidate demonstrated rigorous tracking of contractual quantities and compliance with occupational health and safety rules. Detailed presentation of daywork vouchers and the change order tracking sheet substantiated full control over final accounts.

Standard scenario 2: Project lead architect in the Canton of Geneva

For a commercial building storey addition with 4 200 square metres of usable floor area, the applicant emphasised interdisciplinary spatial coordination and filing the building permit application in compliance with local regulations. By illustrating the management of a fee budget of approximately 950 000 CHF and leading coordination meetings with specialist engineers, the candidate proved their ability to safeguard firm profitability while ensuring high architectural quality.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

How should you structure projects in your application file?

Present your projects with an illustrative budget of 12'000'000 CHF, specifying the SIA 118 standard for works agreed under art. 319 CO without ambiguity.

Can an employer check your references?

Under art. 6 LPD, an employer must obtain your prior consent before contacting your references regarding an executive position with an illustrative benchmark salary of 130'000 CHF.

How do you justify your salary expectations during the interview?

Rely on art. 322 CO governing agreed remuneration to negotiate confidently an annual technical executive salary, set for instance at an illustrative 125'000 CHF.

Which law governs your work certificate?

Art. 330a CO entitles you to request a certificate covering your technical performance and conduct, supporting managerial responsibilities benchmarked at an illustrative 110'000 CHF.

How is overtime handled for architectural draftspersons?

Pursuant to art. 321c CO, compensate overtime with time off or require a salary premium of at least one quarter, calculated on an illustrative hourly rate of 60 CHF.

How long is the probation period?

Art. 335b CO provides for one month of work by default, extendable up to three months in writing, for a technical post with an illustrative monthly salary of 9'000 CHF.

To strengthen your positioning and succeed in your recruitment process in Switzerland, explore our specialised resources:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.