Practical guide

Employer Due Diligence Before Signing: Checking Permits, CFC Authenticity, Crane Licences and References

Swiss protocol for checking work permits, CFC diplomas, crane licences and references to secure your construction hires under LEI, LFPr and LPD.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Classification errors leading to retroactive back-pay under the CLA pay scale, with unexpected costs of several thousand CHF per worker, or immediate shutdown of a crane without prior notice.
  2. Legal / Joint committee / SUVA: Criminal penalty for employment without a valid permit under art. 117 LEI of up to 20 000 francs for negligence, or exclusion from public construction sites following joint committee inspections.
  3. Administrative / Handover: Site access denied on construction sites with strict access control and formal notice from the cantonal labour inspectorate for non-compliance with required professional qualifications.

Before signing an employment contract in the construction sector, employers must perform rigorous checks on residence permits, professional certificates and the applicant's work history. This verification protects site management and human resources teams against the risks of unauthorised labour on French-speaking Swiss construction sites.

This protocol outlines the authenticity requirements for the federal VET diploma (certificat fédéral de capacité) under the LFPr, the validity of learner crane operator or plant operator licences, and compliance when checking references under the LPD and art. 330a CO.

Verification protocol for residence and work permits

Hiring a worker requires holding a valid permit authorising gainful employment beforehand. Under art. 11 LEI, any foreign national intending to work in Switzerland must hold an authorisation, which must be requested by the employer when hiring salaried staff. The employer conducts a visual check of the original permit and retains an evidentiary copy.

  • Permit C (Settlement): Free access to the Swiss labour market, without sectoral restrictions or dependency on the employer.
  • Permit B (Residence): Long-term residence permit subject to the admission requirements of art. 18 LEI, requiring verification of the authorised activity.
  • Permit G (Cross-border commuter): Defined border zone, with an obligation to return weekly or daily to the primary residence abroad.
  • Permit L (Short-term): Duration strictly limited to the temporary assignment contract or agreed construction site period.

Pursuant to art. 117 LEI, employing a worker without an authorisation exposes the employer to a fine of up to 20 000 francs for negligence, in addition to financial penalties or custodial sentences for intentional offences. The cantonal authority also applies art. 6 LTN to check the worker's status regarding social security contributions and work authorisations.

Authenticity of CFC diplomas and SUVA crane operator licences

The certificat fédéral de capacité is the official qualification issued by cantonal authorities upon successful completion of qualification procedures, pursuant to art. 38 LFPr and art. 17 LFPr. To detect forged documents, employers must check official cantonal seals and, in case of doubt, contact the cantonal vocational training office or consult the national diploma register. For admission based on professional experience under art. 32 OFPr, proof of five years of practical trade experience remains mandatory.

For high-risk roles such as tower crane or mobile crane operation, the federal qualification or official SUVA licence is required on construction sites in French-speaking Switzerland. Employers must verify the authenticity of the SUVA crane operator licence by confirming the exact authorised categories (Category A for tower cranes, Category B for mobile cranes). Assigning a worker without recognised accreditation exposes site management to an immediate stop-work order.

Checking references under art. 330a CO and the LPD

Gathering information from former employers is governed by the principles of lawfulness and proportionality set out in art. 6 LPD. Art. 19 LPD requires informing the candidate before contacting their referees. The employer only collects data relevant to suitability for the intended position, in line with the content of the employment reference defined in art. 330a CO (quality of work, conduct and duration of the employment relationship).

Comparative table of pre-employment checks

Document checked Legal basis or reference On-site checkpoint Risk in case of negligence
Residence permit / Permit G Art. 11 and art. 18 LEI Expiry date and clause authorising gainful employment Fine of up to 20 000 francs under art. 117 LEI
Certificat fédéral de capacité Art. 38 LFPr Official cantonal seal and consistency of the CFC trade Retroactive CLA reclassification and back-pay
Crane operator licence SUVA regulations Exact machinery category (A or B) and physical validity Immediate site shutdown and criminal liability
Previous employment references Art. 330a CO Consistency of dates and concordance with the provided CV Role mismatch and termination during the probationary period
Consent for reference checks Art. 6 and art. 19 LPD Candidate's explicit prior agreement before any call Infringement of personality rights and complaint to the FDPIC

Common hiring mistakes and financial consequences

Confusing the submission of a permit application with a definitive work permit is a frequent mistake. Work cannot begin before the permit has been formally granted. Similarly, accepting a mere internship certificate instead of an official CFC leads to disputes during joint committee audits. A retroactive reclassification from unskilled labourer to qualified CLA status represents a financial impact of roughly 6 000 CHF to 12 000 CHF per worker in wage arrears and social security contributions.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and situations presented below are illustrative examples designed to guide hiring procedures.

Scenario 1: Hiring a cross-border crane operator in the canton of Geneva

On a 24-unit residential building site in Geneva, a general contractor hires a cross-border crane operator. During due diligence, the HR manager discovers that the foreign crane licence has not been granted equivalence recognition by SUVA. The hiring is suspended until the required SUVA certificate is obtained, avoiding an immediate shutdown of the lifting equipment during an inspection by the cantonal labour inspectorate.

Scenario 2: Verifying a CFC mason in the canton of Vaud

A structural work SME in Vaud hires a mason claiming a CFC qualification at the corresponding collective agreement wage. A check with the cantonal vocational training office reveals a two-year federal vocational certificate within the meaning of art. 17 LFPr, rather than a three-year CFC. The company adjusts the individual employment contract under art. 319 CO to match the CLA wage band before work begins.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Can a foreign worker start working before their permit is issued?

No. Art. 11 LEI requires prior authorisation. Under art. 117 LEI, employing a worker without a valid permit is punishable by a custodial sentence of up to one year or a fine of up to 20 000 francs for negligence.

How do you verify the authenticity of a certificat fédéral de capacité (CFC)?

Art. 38 LFPr entrusts the issuance of the CFC to cantonal authorities. The employer must contact the cantonal vocational training office or request the official transcript of grades in a sealed envelope to rule out any forgery.

Is a foreign crane operator licence sufficient on a structural work site?

No. The Swiss Crane Ordinance requires a Swiss crane operator licence recognised by SUVA. Foreign qualifications must imperatively be validated by SUVA before operating any machinery.

Can an employer contact former employers without the applicant's consent?

No. Under art. 6 LPD, data processing must be carried out in good faith. Contacting a former employer without explicit consent breaches this principle; furthermore, art. 330a CO limits references to verifiable professional facts.

What penalty does a company risk for failing to register a vacancy with the RAV/ORP?

For occupations subject to the job registration requirement, breaching the notification duty under art. 21a para. 3 LEI is punishable under art. 117a LEI by a fine of up to 40 000 francs (20 000 francs for negligence).

What obligations apply when hiring through a staff leasing agency?

Art. 20 LSE requires applying the minimum wages of extended collective labour agreements. Under art. 22 LSE, a written leasing contract must specify the worker's qualifications and agreed charge-out rates.

Rigorous checks on residence permits, trade qualifications and safety certifications protect your firm against heavy administrative sanctions and ensure full compliance on site. Continue optimising your recruitment process with our dedicated guides: