Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

FAR, RESOR, Parifonds and Cantonal Funds (FONPRO Vaud, etc.): Rates and Subject Liability

Master Swiss FAR, RESOR, Parifonds and FONPRO Vaud contributions: parity rates, site staff liability and CLA compliance in Swiss construction.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: A retroactive adjustment of employer and employee contributions in the region of 4 % to 7 % of gross payroll in the event of an affiliation error, heavily impacting operating margins under art. 322 CO.
  2. Legal / Joint / SUVA: A notice of violation issued by the joint committee during an audit under an extended CLA pursuant to the Federal Act on the Declaration of Collective Labour Agreements as Generally Binding, resulting in a formal notice.
  3. Administrative / Acceptance: The refusal or suspension of the certificate of joint compliance, blocking access to public procurement and cantonal or municipal contract awards in French-speaking Switzerland.

Payroll management in Swiss building trades requires strict mastery of collective social contributions. Early-retirement funds, such as the FAR foundation for structural work and the RESOR fund for French-speaking Swiss finishing work, are key institutions securing early retirement for eligible workers. In addition to these schemes, compulsory contributions must be paid to Parifonds and cantonal vocational training funds, such as the FONPRO fund in the Canton of Vaud.

Aimed at employers, construction managers and HR executives, this guide clarifies the affiliation criteria separating operational staff from office personnel, based on wages determined under art. 322 CO and the framework of the Federal Act on the Declaration of Collective Labour Agreements as Generally Binding. A rigorous application of these deductions shields your firm against any collective-agreement adjustments during inspections conducted under art. 6 LTN.

Scope of liability and FAR, RESOR and Parifonds collective schemes

The liability of construction workers to early-retirement schemes and training funds depends on the industry collective labour agreement (CLA) and extension decisions made under art. 1 LECCT and art. 2 LECCT. In the main construction sector (structural work), the National Agreement (CN) requires affiliation to the Foundation for Early Retirement (FAR). This scheme covers operational staff directly active on the construction site, notably bricklayers, formworkers, crane operators and machinery operators. Conversely, purely administrative staff or technical desk-bound managers do not fall under this collective obligation, subject to specific wage-coordination rules.

In French-speaking Swiss finishing work (plastering, painting, joinery, tiling, Plumbing & Sanitary Installations or Sheet-metal Work), the equivalent scheme is the French-speaking Swiss early-retirement fund for finishing trades (RESOR). Concurrently, the Parifonds Construction joint fund finances continuing professional development and enforcement of the CN. The employer is required to deduct the employee's share and remit the employer's contribution based on qualifying wages, in direct application of art. 322 CO governing the payment of agreed wages or wages set by collective agreement. For temporary staff, art. 20 LSE requires staffing agencies to comply with the extended collective-agreement provisions applicable to the client company, ensuring strictly equal treatment on the construction site.

Vaud cantonal specifics: the FONPRO deduction

In the Canton of Vaud, the Interprofessional Vocational Training Fund (FONPRO) comes on top of federal or trade-specific joint obligations. Established under cantonal public law, this levy pools the costs of apprenticeships and continuing training pursuant to the LFPr. Art. 15 LFPr and art. 16 LFPr define the requirements for initial and continuing education, which call for coordinated institutional financial support.

Employers in Vaud must be careful not to confuse the cantonal FONPRO contribution with trade contributions payable to the Fédération vaudoise des entrepreneurs (FVE) or individual CLA training funds. While partial offsets or deductions exist between joint and cantonal funds to prevent double-charging the same gross payroll, payroll accounting requires precise tracking by cost centre to avert adjustments during audits under the Federal Act on Combating Clandestine Employment (art. 6 LTN).

Comparison table of early-retirement schemes and training funds

Scheme / FundTrade and territorial scopeCovered job categoriesPurpose of the contributionWage calculation basis
FARStructural work / Main construction sector (Switzerland)On-site production staff (CFC, labourers, foremen)Bridging pension before the statutory AVS ageGross AVS-qualifying wage
RESORFinishing work (French-speaking Switzerland)Installers, painters, joiners, plasterers, tilersCollective-agreement early retirementGross AVS payroll
ParifondsMain construction sector (Switzerland)Operational staff subject to the National AgreementAdvanced training, health and safety, joint enforcementGross hourly or monthly wage
FONPROAll firms (Canton of Vaud)All employees covered by Swiss social securityPromotion and financing of apprenticeships (LFPr)Gross cantonal payroll
Local CLA fundsArtisanal trades under cantonal agreementsManual workers and field technical personnelEnforcement costs and continuing educationGross remuneration under the CLA

Recurring payroll accounting errors and financial consequences

Confusing the status of a site foreman with that of a site manager or project technician is a frequent pitfall. Improperly exempting an operative who works on site triggers major retrospective adjustments over five years, plus default interest. Conversely, mistakenly deducting the FAR contribution from the salary of a desk-bound administrative employee violates art. 319 CO and art. 322 CO, obliging the firm to perform complex net salary corrections.

Another critical failure involves omitting to register posted or temporary staff with joint funds. Art. 8a ODét and art. 8b ODét demand scrupulous compliance with minimum pay conditions, including deductions for enforcement and training costs. When a joint committee identifies a discrepancy, penalties and audit costs can range from 10 000 CHF to 50 000 CHF for a medium-sized company, without prejudice to civil recovery claims.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following figures and situations are illustrative examples to help you set up your HR and payroll parameters correctly.

Scenario 1: Structural work in the Canton of Fribourg

A masonry firm is building a residential complex in Bulle with a workforce of 18 site operatives and 2 technical office employees. The employer applies the National Agreement and enrolls the 18 field workers in the FAR foundation and Parifonds, calculating deductions on their gross AVS remuneration. The two office workers remain subject only to the standard LPP regime. This disciplined categorisation shields the company from back payments during random joint audits.

Scenario 2: Finishing work renovation in the Canton of Vaud

A Lausanne joinery firm employs 8 skilled craftsmen holding a CFC obtained under art. 38 LFPr and 1 apprentice under an apprenticeship contract pursuant to art. 14 LFPr. The company falls under the French-speaking Swiss finishing work CLA and is domiciled in the Canton of Vaud. The payroll officer deducts RESOR contributions for the 8 adult joiners and applies the cantonal FONPRO levy to the workshop's entire gross payroll, while correctly factoring in apprentice exemptions on certain joint components. The payroll files thus remain fully compliant with federal and cantonal requirements.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Is an agency crane operator subject to FAR early retirement?

Yes. Under the National Agreement and art. 20 LSE, the staffing agency must apply the extended collective deductions of the main construction sector to this role, reporting and remitting them to the FAR fund.

Which wage serves as the calculation basis for RESOR parity deductions?

The deduction applies to the gross AVS-qualifying wage pursuant to art. 322 CO, excluding actual expense reimbursements, for every employee in a firm covered by the French-speaking Swiss finishing work CLA.

Does an apprentice mason contribute to Parifonds Construction?

No. Apprentices under an apprenticeship contract pursuant to art. 14 LFPr are exempt from Parifonds deductions, even though the employer receives collective-agreement allowances for inter-company courses under art. 23 LFPr.

How is the Vaud cantonal FONPRO employer contribution applied to wages?

Employers in Vaud pay this cantonal contribution on their total AVS payroll via their compensation fund, funding vocational training organisations under the cantonal act on vocational education and training.

What risks does an employer run if extended collective contributions are omitted?

The joint committee orders retroactive payment and levies audit costs as well as conventional penalties laid down in the collective labour agreement extended under art. 1 LECCT.

Must the FAR salary deduction appear on the monthly pay slip?

Yes. Under art. 322 CO and the individual employment contract under art. 319 CO, the employer must itemise each social and parity deduction on the pay slip provided to the employee.

Mastering collective-agreement and cantonal levies ensures compliance during joint site inspections. To manage your gross payroll with complete peace of mind, explore our dedicated guides:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.