Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

Mandatory Working Time Recording (OLT 1 & CLA): Site Clocking Requirements

Working time recording rules on Swiss construction sites under OLT 1 and CLAs: daily hours, breaks, and HR monitoring requirements.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Heavy wage back-payments for unrecorded overtime under art. 321c CO or a 25% premium under art. 13 LTr, generating unforeseen extra costs of around 10% to 25% of the relevant payroll.
  2. Legal / Joint Body / SUVA: Non-compliance with the requirements of art. 73 OLT 1 and art. 6 LTr identified during cantonal or joint labour committee inspections, resulting in administrative orders and joint audit fees.
  3. Administrative / Handover: Rejection of worker timesheets and freezing of hours statements during contractual audits, preventing compliant payroll processing under art. 322 CO.

This guide details the statutory obligation to record working time on Swiss construction sites, aimed at employers, site managers and construction HR managers. Pursuant to art. 73 OLT 1, employers must maintain a register showing the worker's identity, the daily and weekly hours worked, including overtime, as well as the schedule of breaks lasting at least thirty minutes, keeping all records on file for at least five years.

Firms must operate within the maximum weekly working hours set by art. 9 LTr at 45 or 50 hours and organise the rest breaks prescribed by art. 15 LTr. Rigorous management prevents unforeseen breaches of the statutory limits under art. 12 LTr and safeguards agreed remuneration pursuant to art. 319 CO.

Operational method for recording hours on Swiss construction sites

Collecting timesheet data requires strict daily discipline for all operational site personnel. To ensure compliance with the requirements of art. 73 OLT 1, the employer must record the worker's identity, actual hours worked each day and week, compensatory or overtime work, and the timing of breaks lasting half an hour or longer. Retaining these registers and supporting documents for at least five years is an imperative legal requirement.

On site, foremen and site supervisors manage data collection using mobile digital devices or daily site timesheets. Under art. 6 LTr, the employer must take all necessary steps to protect workers' health and tailor operating conditions, while staff must support the company in doing so. Breaks defined in art. 15 LTr—at least fifteen minutes beyond five and a half hours, half an hour after seven hours, and one hour after nine hours of daily activity—must be recorded in a verifiable manner as soon as they reach thirty minutes.

Exemption terms and simplified recording

Regulations provide for specific arrangements based on employee autonomy and salary levels. Art. 73b OLT 1 allows simplified recording, limited solely to total daily working time, through an agreement with employee representatives or an individual written agreement in companies with fewer than 50 employees. In contrast, fully waiving time recording under art. 73a OLT 1 requires a collective labour agreement, a gross annual salary exceeding 120 000 francs, significant autonomy in scheduling working hours, and an individual written agreement that includes health protection measures.

Comparison of time-tracking and clocking-in solutions

Monitoring systemData collectedOperational advantagesRegulatory requirementsPoints of vigilance
Signed paper timesheetStart, end, breaks, daily volumeDirect rollout without IT equipmentArchived for five years under art. 73 OLT 1Risk of omissions and cumbersome manual entry
Mobile site appTimestamps for start, end and breaksImmediate centralisation for HR teamsCompliance with proportionality under art. 6 LPDTraining required for site production crews
Fixed site shed punch clockArrivals and departures at the locker room areaStrict flow control on large construction sitesData protection compliance under art. 8 LPDNot suited to mobile specialist trade call-outs
Negotiated simplified recordingTotal number of hours worked per dayReduced administrative workload for executivesWritten agreement compliant with art. 73b OLT 1Not applicable to structural work crews
Collective clocking by site foremanHeadcount present and hours by taskClear overview of team productivityIdentity verification under art. 73 OLT 1Dependent on the foreman's diligence

Common time management mistakes and financial impacts

Failing to record the exact schedule of breaks is the most frequent violation found during site audits. When breaks of thirty minutes or longer do not appear on reports, labour inspectorates reclassify these periods as actual working time. This adjustment triggers an automatic reclassification into statutory overtime under art. 12 LTr, along with the 25% premium stipulated in art. 13 LTr if no time-off in lieu has been formally agreed upon.

A second pitfall lies in poor tracking of weekly limits. Art. 9 LTr caps the working week at 45 hours for technicians and 50 hours for construction workers. If an unrecorded breach of the statutory annual overtime cap under art. 12 LTr occurs (140 or 170 hours), the company risks social contributions back-payments and joint audit fees typically ranging from 15 000 CHF to 40 000 CHF for an in-depth audit.

Illustrative practical cases (typical scenarios on Swiss construction sites)

Figures shown in the following scenarios are illustrative examples intended to guide companies in setting up their internal procedures.

Standard scenario 1: Structural work and joint committee regularisation in Vaud

A masonry contractor in the Canton of Vaud was carrying out the structural work for a residential development with a team of 14 skilled workers. Time tracking relied on weekly lump-sum timesheets without specifying lunch break hours. The joint labour committee demanded a full reconstruction of hours worked over the previous twelve months of operation.

To restore compliance with art. 73 OLT 1, management equipped foremen with a mobile application logging start, finish, and the exact timing of the forty-five-minute lunch break. This traceability secured overtime calculations under art. 321c CO and cleared an estimated wage liability of around 28 000 CHF.

Standard scenario 2: Plumbing & Sanitary Installations contractor in Geneva

A Geneva finishing work firm employs 8 installers working on office building refurbishments. Operatives started directly on site without logging travel times between different client locations.

The company entered into a written simplified recording agreement under art. 73b OLT 1 for its autonomous field technicians, while maintaining accurate records of actual daily hours. This clarification eliminated disputes over agreed wages under art. 322 CO and brought stability to its payroll.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Which time details must appear on site clocking sheets?

Under art. 73 OLT 1, employers must log actual daily and weekly hours worked, including overtime, as well as the exact timing of breaks lasting thirty minutes or longer.

Can a site manager opt out of recording working hours on construction sites?

Art. 73a OLT 1 allows opting out under a collective agreement exclusively for autonomous managers earning a gross salary exceeding 120 000 francs, with their formal written consent.

How should overtime ordered during urgent concrete pours be documented?

Under art. 12 LTr and art. 321c CO, the employer records these exceptional excess hours to pay the wage increased by one quarter or schedule time off in lieu of equal duration.

How long must construction site time records be retained?

Art. 73 OLT 1 requires all working time records to be kept for at least five years to meet the requirements of labour inspectorate and joint committee audits.

Can an SME in structural work adopt simplified working time recording?

Yes, under art. 73b OLT 1, a written agreement allows businesses with fewer than fifty staff to record only the total duration of work performed each day.

Does the time-recording obligation apply to subcontractors working on site?

Yes, pursuant to art. 20 LSE and art. 8c ODét, the main contractor must contractually verify compliance with working hours provisions set by generally binding collective agreements.

Compliant site time tracking ensures smooth joint committee audits and protects payroll calculations. To explore your administrative requirements further, read our guides:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.