Drawing 1:20 and 1:5 Working Detail Sections Without Linear Thermal Bridges (SFOE / SIA Catalogue)

Swiss method for drawing 1:20 and 1:5 detail sections without linear thermal bridges, compliant with SIA standards and SFOE catalogues.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: An unresolved insulation break at 1:5 leads to remediation costs ranging from 15'000 CHF to 45'000 CHF per facade, as the client can demand remediation under art. 368 CO.
  2. Legal / Joint Body / SUVA: A thermal design defect resulting in structural mould incurs civil liability under the Code of Obligations (CO), and potentially criminal liability under art. 229 CP in the event of negligent endangerment of life or limb.
  3. Administrative / Acceptance: Finding a Psi-value non-compliant with energy verification requirements blocks final acceptance of the works, withholding payment of the balance under standard SIA 118.

Working technical drawings at 1:20 and 1:5 scales are the decisive tool for architects and draftsmen to achieve absolute continuity of the thermal envelope. In Switzerland, verifying the limitation of linear thermal losses requires strict geometric coordination between structural work, joinery, and waterproofing, in accordance with recognised codes of practice and the principles of building physics.

Omitting an accurate junction section exposes the building to interstitial condensation and premature degradation of building components. In the event of an inconsistency between working drawings and on-site delivery specifications, art. 365 CO also requires the contractor to give immediate notice to the client in order to maintain the building's compliance with cantonal energy requirements.

Drafting method at 1:20 and 1:5 scales for eliminating thermal bridges

Moving from the general 1:50 working plan to 1:20 and then 1:5 details satisfies a strict geometric requirement: establishing the absolute continuity of the insulation envelope and the airtight layer. At a 1:20 scale, the draftsman positions the reinforced concrete or timber structural grid relative to external thermal insulation composite systems (ETICS) or ventilated facades. At a 1:5 scale, each interface component appears with its actual thickness: mortar bed, butyl sealing strips, pre-compressed joint sealing tapes, setting blocks, and load-bearing thermal break elements certified compliant with the typologies in the Swiss Federal Office of Energy (SFOE) Thermal Bridge Catalogue.

Accurate dimensioning and isothermal line tracing

To neutralise the linear thermal transmittance coefficient, drawing at 1:5 requires explicitly tracing the continuity line of the insulation. No metallic anchor penetrations or slab edges must disrupt this envelope without a load-bearing insulating element or a suitable thermal break. Dimensioning must systematically indicate the finished thickness of each layer, installation tolerances, and the minimum overlap of vapour barrier membranes prescribed by standard SIA 180.

Critical interfaces between different trades require rigorous detailing:

  • The junction between the facade base and basement slab: aligning peripheral insulation with the cellular glass or high-compressive-strength rigid foam plinth.
  • The junction between the balcony slab and internal floor: inserting a load-bearing thermal insulation element structurally isolating the external slab to eliminate thermal leaks at the slab edge.
  • The window reveal and sill: returning insulation by at least 30 to 50 mm against the subframe to prevent internal surface condensation.

Comparative matrix of construction junctions at working scales

Construction junction Required scale Mandatory components on drawings Thermal decoupling principle Execution inspection criterion
Balcony slab edge 1:5 Load-bearing thermal break, reinforcement ties, waterproofing Complete structural separation between internal and external concrete Continuity of insulation on underside and exposed edge
French door threshold 1:5 Insulated sill adapter profile, flashing, compressed seal Interposition of a high-density insulation block under the profile Absence of direct aluminium-to-internal concrete contact
Flat roof parapet 1:20 and 1:5 Three-sided insulation envelope, timber upstand, vapour barrier Complete encasement of the concrete upstand in thermal insulation Airtight sealing between the vapour barrier and the membrane
Wall and raft foundation junction 1:20 Cellular glass under plinth, bituminous waterproofing, drainage Maintaining continuity between under-slab insulation and external insulation Lapping of damp-proof courses against rising damp
Integrated shutter box 1:5 High-performance backboard insulation, airtight closure profile Applied thermal insulation between the concrete lintel and the housing Continuous airtight sealing around operating mechanism penetrations

Common drafting errors and financial consequences

Omitting 1:5 drawings in favour of a simple unmeasured 1:50 schematic frequently results in insulation being breached by raw steel brackets or untreated solid concrete upstands. On the construction site, these graphic deficiencies create geometric thermal bridges that cause drops in internal surface temperatures, triggering condensation and mould. Remediating defective external insulation or retrofitting weatherstripping across a set of glazed openings incurs remedial costs in the range of CHF 20'000 to 60'000 depending on the size of the building, triggering defect remediation under art. 368 CO as well as liability obligations under art. 364 CO.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and scenarios below are illustrative examples constructed for vocational training.

Standard scenario: Resolving thresholds and balcony slabs on a residential development

In the canton of Vaud, constructing a multi-family residential building of twelve flats engages a team of six draftsmen and civil engineers for the execution phase. While developing the structural work and ventilated facade drawings, the technical office identifies a critical thermal bridge risk at projecting loggias and ground-floor French doors.

The chosen approach replaces generic details with a set of specific sections drafted at 1:5 scale:

  • Precise modelling of certified thermal breaks incorporating stainless steel to penetrate the insulated layer without condensation.
  • Millimetre-accurate dimensioning of the cellular glass thickness beneath the opening thresholds to ensure support without thermal crushing.
  • Graphic representation of each liquid waterproofing layer connected to the dust barrier and peripheral insulation.

This drawing accuracy enabled the structural contractor to anticipate box-outs without later alterations, remaining within the initial budget and ruling out any risk of remediation under art. 368 CO.

Surfaces, standards and permits: free tools

SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.

View engineering tools

Frequently asked questions

What drawing scale should be used to dimension a parapet thermal break?

Working drawings require a 1:5 scale to dimension continuous insulation and the load-bearing component. Under standard SIA 118, this level of precision prevents costly remediation in the order of 4 200 CHF.

How does the Code of Obligations govern insulation defects on drawings?

Art. 365 CO requires the contractor to report any design defect. Art. 368 CO grants the client cost-free remediation of an untreated thermal bridge on working drawings.

What financial impact arises from omitting under-screed insulation at 1:20?

Thermal discontinuity at the facade base leads to condensation damage. The average remediation cost on bare slab is typically around 6 500 CHF for complete repairs of defective junctions.

What is the deadline for notifying a thermal bridge defect after handover of a building?

Under art. 367 CO, the client has 60 days to report defects in immovable structures. Art. 371 CO sets the limitation period for claims regarding these defects at five years.

How does the SFOE thermal bridge catalogue serve as a contractual reference?

It supplies recognized psi-values to verify envelope compliance. An unverified, defective junction exposes building owners to extra heating costs of around 850 CHF per year.

What criminal liability does the draftsman face in the event of a structural insulation defect?

Art. 229 CP penalises anyone who breaches the recognised rules of construction and endangers human life, particularly through anchorage weaknesses in thermally decoupled balconies.

Coordination of section details and thermal continuity

Mastering 1:20 and 1:5 detail sections guarantees energy performance and contractual compliance for the building in accordance with recognised technical rules in Switzerland. To explore each project interface in greater detail, consult our dedicated technical guides: