The 3 Major Site Risks
- Financial / Margin: Direct loss in the range of 5 to 12 % of gross margin during geometric modifications not correlated with line items in the itemized quote, with the client rejecting additional costs for lack of proof under art. 373 CO.
- Legal / Joint body / SUVA: Absence of contractual traceability for change orders carried out on a time-and-materials basis or at unit prices, exposing the technical office to remuneration disputes under art. 374 CO and art. 375 CO.
- Administrative / Acceptance: Rejection of the final account by the site management and disputes during inspection of the works under the SIA 118 standard, stalling the release of guarantees.
This technical guide is aimed at Swiss architects, draftsmen, civil engineers and project managers faced with chronic discrepancies between working drawings and tenders. Setting up a rigorous gateway between 2D or 3D geometry and the standardized SIA 451 data exchange file makes it possible to link each graphic element to items in the itemized quote structured by Construction Cost Code chapters.
During the execution phase, any modification made to dimensions or volumes immediately triggers an update of the contractual quantity take-offs. Thanks to this continuous synchronization, technical offices immediately justify every addendum to the overall project management with an irrefutable visual comparison, eliminating price disputes before change orders are formally signed.
Interfacing method between technical drawings and SIA 451 items
The link between a vector drawing and the structure of the itemized quote relies on systematically assigning unique identifiers to drawing components. Each geometric entity, whether a reinforced concrete slab, masonry work or a building services network, receives a property tied to the Construction Cost Code and to the corresponding line in the standardized SIA 451 exchange file. This rigorous approach avoids manual re-entry into award forms.
When dimensional changes occur on working drawings, detecting the modified quantities must remain fully transparent for the site management and the client. If the construction contract is concluded on a lump-sum basis under art. 373 CO, no increase may be claimed for the scope initially agreed, except in the event of extraordinary, unforeseen circumstances within the meaning of art. 373 al. 2 CO. Conversely, when graphical modifications constitute a change order decided by the principal, tracing updated dimensions allows the account to be drawn up on the basis of contractual unit prices.
For work performed without a price fixed in advance, remuneration is assessed based on the value of the work and the expenses incurred, in accordance with art. 374 CO. If an approximate quote is exceeded disproportionately through no fault of the client, the client may exercise the rights provided under art. 375 CO. Linking each measured volume to the original bill of quantities protects the contractor against the rejection of its supplementary services.
Comparison of drawing-to-quote linking approaches on Swiss projects
| Assessment criterion | Traditional manual method | Dynamic 2D/3D to SIA 451 link |
|---|---|---|
| Quantity take-off extraction | Measurement on paper prints or PDFs with manual tick-off | Automatic calculation of areas and volumes by the drawing software |
| Classification structure | Empirical reconciliation by quote chapters | Strict allocation per item in the standardized exchange file |
| Justification of an addendum | Workshop notes and explanatory sketches without direct metric proof | Visual before/after comparison report with extracted quantitative delta |
| Verification of earthworks | Isolated theoretical geometric calculations | Check in accordance with art. 75 OTConst where the slope is adapted to soil stability |
| CO contractual framework | High risk of dispute over the lump-sum price under art. 373 CO | Smooth application of unit prices and justification under art. 374 CO |
Frequent mistakes and financial impacts
The most widespread oversight consists in applying a thickened raft foundation or an extended shear wall solely on the formwork drawing, without updating the quantity export intended for local site management. When the final invoice is issued, the unapproved metric discrepancy causes advance payments to be withheld, which can amount to 20 000 to 45 000 CHF on a medium-sized construction site.
A second error involves special earthworks. When an excavation exceeds 1 m 50 in depth, art. 68 OTConst requires that it be sloped or shored. Under art. 75 OTConst, the slope of excavation and earthwork faces is adapted to soil stability, and appropriate measures are taken if it is compromised by heavy rainfall, thawing, loads or vibrations. Modifying the slope geometry without recalculating the impact on excavation volumes shown in the SIA 451 bill of quantities leaves the contractor to shoulder disposal surcharges alone.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and situations below are illustrative examples constructed to analyse the method.
Standard scenario: Modification of foundations for an apartment building (Canton of Vaud)
On a twelve-unit residential project, unforeseen water ingress requires lowering the foundation level by 80 cm across the entire raft foundation footprint, representing 420 m² of ground area. The design team uses working drawings dynamically linked to the work description. As soon as the levels are updated in the graphic model, the excavation and concreting differential is automatically recalculated, amounting to 336 m³ of excavation and 168 m³ of additional concrete.
The contractor produces the priced addendum structured under SIA 451 in less than twenty-four hours. The site management approves the change for an estimated amount of 68 000 CHF, relying on contractual unit prices without any possible dispute over the actual physical quantities.
Surfaces, standards and permits: free tools
SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.
Frequently asked questions
How do you link a 3D geometric delta to an SIA 451 addendum quote?
The visual comparison extracts the volume difference, converted into a CAN measurement. In accordance with the SIA 118 standard, the contractor submits this priced description, for example an estimated surcharge of 4'200 CHF.
Does the SIA 451 format directly support unique 2D/3D object identifiers?
No, the SIA 451 exchange standard transmits CAN service items and amounts. The link is established via the CFC code or the object reference noted in the addendum remarks.
What process should be followed if a change order is imposed during construction?
Under the SIA 118 standard, the contractor notifies the financial impact before execution. The 2D/3D comparison plan documents the additional quantities to justify the supplementary quote submitted to the site management.
Can an additional cost claim be rejected if it lacks graphic proof or quantity take-offs?
Yes, under the SIA 118 standard, every modified service must be verifiable. Without an annotated drawing or quantity take-off linked to CAN items, the client can dispute the addendum amount.
How do you charge for a geometric change not planned in a lump-sum contract?
Under art. 373 CO, the lump sum is binding on both parties. A modification ordered by the client departs from the initial drawings: the annotated model proves the additional work outside the base quote.
Where should joint on-site verifications of addenda measurements be logged?
Joint physical inspections and acceptances fall under construction site tracking on /portail/, whereas integrating addenda pricing relies on ranges available on /indice-acip/.
Contractual and graphical management of change orders
Synchronizing 2D/3D geometry and SIA 451 files guarantees rigorous traceability to meet the requirements of the site management and client. To consolidate your modelling methods, explore Swiss protocols in greater depth through the following guides:
- 3D Modelling, Pragmatic BIM (SIA 2051 / IFC) and Quantity Take-Off to SIA 451 Quotes in Switzerland
- SIA 2051 Technical Leaflet Explained Plainly: Implementing Pragmatic BIM in a Swiss Firm or Design Office
- Structuring 3D Objects and Layers According to eBKP-H (eCCC-Bât) and CFC Codes Right from the Sketch Stage
- Importing and Cleaning a Surveyor DWG / DXF File (Swiss MN95 Coordinates) without Bloating Your Plan