Art Construction ecosystem

Plans Pro – Plans and pricing

Floor plans, sections, elevations and SIA 416 areas, right in your browser.

Drawings ready for the site and the building permit

Draw your walls, slabs, doors and windows in 3D. Plans Pro produces the floor plans for each level, the sections and the elevations, with your Swiss title block, in formats A0 to A4.

SIA 416 areas in one click

Floor area, net floor area, main and secondary usable areas, circulation areas, service areas and building volume: the table is calculated from your model and can be exported to Excel.

Your IFC and DXF files

Open your partners' IFC models, export your drawings to PDF and DXF for your CAD software, and your quantities to Excel.

In your browser, hosted in Switzerland

Nothing to install. Your projects are stored in Switzerland and you can access them on all your devices with your Art Construction account.

Try before you subscribe

The limited trial version is free with no time limit: view and edit a demo project, or create your own project. File exports and imports are reserved for subscribers. When you subscribe, you also get a 14-day full trial.

Need help getting started? Follow the step-by-step Plans Pro guide.

Takeoffs on PDF plans and BIM models

Open a PDF plan, set the scale and measure lengths, areas, volumes and walls, including special shapes (gables, vaults, sloping ceilings, reveals). Each measurement is linked to an ACIP item, the Art Construction price list, and coloured on the plan.

Quantities go into a quote in your ERP in one click. Excel export, comparison of two versions of a plan and takeoffs saved in your account.

BIM viewer: IFC 2x3, 4 and 4.3 files (.ifc and .ifczip), cutting by storey, quantities by element type sent to a quote, and a model shared read-only with your client in the Portal.

AI analysis of plans (paid accounts): the AI proposes the rooms and areas, you check them. The monthly page limit is calculated automatically: 5% of the subscription price.

Manual takeoff always remains unlimited. Maximum size: 50 MB for PDF plans and images, 200 MB for IFC files.

Takeoffs on PDF plans and the BIM viewer are included in all plans.

Pricing

Solo

1 user

Up to 147 AI analysis pages per month

CHF 59

per month

Subscribe Start free trial (14 days)

Office

up to 3 users

Up to 372 AI analysis pages per month

CHF 149

per month

Subscribe Start free trial (14 days)

Team

up to 10 users

Up to 997 AI analysis pages per month

CHF 399

per month

Subscribe Start free trial (14 days)
  • 14-day free trial, no credit card required.
  • At the end of the trial, access stops automatically: nothing is charged and your projects are kept.
  • Yearly payment: 2 months free.
  • Change plan or cancel online at any time, with prorated billing.

Prices excluding VAT. VAT will be added if it becomes applicable.