Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

Drafting a Swiss Work Certificate (CO): Balancing Truth, Goodwill, and Coded Phrasing

Drafting a compliant Swiss work certificate: balance truth and benevolence under art. 330a CO while avoiding unlawful coded language.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Legal defence costs and settlement payments in the range of 5 000 CHF to 15 000 CHF during legal action to rectify ambiguous text under the Code of Obligations (CO).
  2. Legal / Joint Body / SUVA: Civil action brought by the employee demanding the rectification or deletion of double-meaning phrases that breach the principle of goodwill arising from art. 330a CO.
  3. Administrative / Acceptance: Blocking the HR offboarding process for a technical manager or team leader, freezing the transmission of documents required by unemployment funds.

In building firms across French-speaking Switzerland, drafting work certificates routinely confronts human resources management with two strict legal requirements: the duty of truth toward future employers and the duty of goodwill to safeguard the worker's economic prospects. Rooted in art. 330a CO, this official document must faithfully reflect the technical skills demonstrated on construction sites without ever relying on ambiguous, allusive, or deliberately coded wording.

This guide details the evaluation criteria for the performance and professional conduct of an employee in structural work or finishing work. It sets out the legal limits for mentioning isolated incidents, the rules governing simple confirmations of employment, and phrasing that complies with Swiss law to secure every staff departure.

Legal balance between truthfulness and goodwill under art. 330a CO

Issuing a work certificate for a construction worker requires balancing two legal principles established by the Code of Obligations (CO). Under art. 330a CO, employees are entitled to receive at any time a document specifying the nature and duration of the employment relationship, as well as the quality of their performance and their conduct. The principle of truthfulness requires the employer to present an accurate picture aligned with facts observed during the performance of duties on the construction site. This requirement protects future employers against groundless or misleading assessments.

At the same time, the principle of goodwill dictates that the chosen wording must not unfairly prejudice the employee's economic and professional future. A negative assessment may appear in the final document only if the observed shortcomings are significant, recurrent, and characteristic of the employment relationship as a whole. An isolated incident or an occasional conflict arising during a project does not justify a derogatory entry. Employers must respect the rules of good faith and the proportionality principle established by the Federal Act on Data Protection (art. 6 LPD).

Decoding hidden formulas and compliant alternatives

Using coded phrasing or double meanings is strictly prohibited under Swiss employment law. Civil courts and competent labour tribunals systematically order the rectification of any text containing disguised allusions. The following table illustrates contentious phrases frequently encountered in the construction industry alongside objective alternative wording compliant with legal standards.

Observed coded or allusive phraseImplicit negative meaningNeutral phrasing compliant with the lawPractical impact on HR management
Demonstrated great sociability with colleagues.Constant chatting, slowing down work output.Integrated properly into the masonry team.Removes all ambiguity regarding actual productivity.
Made efforts to comply with instructions.Unsatisfactory technical results despite good intentions.Carried out routine tasks according to the instructions provided.Provides a factual statement of skill level.
Endeavoured to arrive punctually on construction sites.Repeated lateness at morning shift start.Respected the working hours set by the company.Maintains legal certainty without innuendo.
Showed a marked interest in occupational health and safety.Litigious, disputes site management's operational setup.Applied safety guidelines and wore personal protective equipment.Demonstrates objective compliance with safety rules.
Leaves the company free of any professional commitment.Contentious departure or suspected accounting irregularities.The employment relationship ends on the agreed date.Closes the file without causing prejudice to the employee.

Financial consequences of rectification disputes

Persisting with allusive wording exposes the general contractor or tradesperson to a rectification claim before the conciliation authority or the competent court. When the employee proves that the certificate contains equivocal statements, the employer risks having to bear legal representation costs and court fees, which typically range from 4 000 CHF to 9 000 CHF per disputed file. Furthermore, delayed rectification holds up the final closure of administrative and joint-commission records.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following situations are constructed, purely illustrative examples designed to guide personnel departments in construction firms.

Scenario 1: Dispute involving a CFC bricklayer in the Canton of Vaud

On a residential structural work construction site with a crew of 14 workers, a bricklayer holding a federal certificate of capacity (CFC) receives ordinary notice of dismissal due to internal restructuring under the rules of the Code of Obligations (CO). The technical management provides an initial certificate stating: "showed interest in placing reinforcing steel". Relying on art. 330a CO, the worker demands that this wording, deemed derogatory by their joint trade union, be rewritten. After reviewing the internal evaluation record, the HR manager updates the sentence to: "carried out reinforcement and formwork tasks in accordance with the civil engineer's execution plans". This prompt rectification eliminates the risk of legal action while ensuring a truthful description of the work performed.

Scenario 2: Request for a simple employment confirmation in the Canton of Geneva

A site manager employed by a finishing work contractor faces an ongoing disagreement with executive management over installation output on an office project involving 35 workers. At the end of the contract, the parties cannot agree on evaluating the manager's conduct. In direct application of art. 330a CO, the employee makes an express request that the document cover only the precise nature of the duties and the duration of employment. The firm promptly delivers a factual confirmation of employment detailing the positions held, the construction sites supervised, and the start and end dates. This approach provides the employer with legal safety against any claim of ill-will while strictly honouring the employee's written choice.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Can a construction worker demand the immediate removal of disputed coded language?

Yes. Under art. 330a CO, the employee may seek court-ordered rectification of the text to remove any ambiguous phrase that prejudices future employment prospects.

When should a simple confirmation of employment be preferred over a full certificate?

Under art. 330a CO, the employer restricts the document to the nature and duration of work only upon the employee's express request, often useful during serious disputes over performance.

Can an immediate dismissal without just cause be mentioned in the final assessment?

No. If the dismissal breaches art. 337c CO, the employer cannot penalise the worker in the certificate; the phrasing must remain objective, benevolent, and true to the tasks actually executed.

Must a prolonged illness that occurred during work on site appear on the document?

Mentioning an absence protected under art. 336c CO is excluded, unless the total duration of the incapacity renders the overall assessment unrepresentative of the work actually performed.

What financial risk does the business run in the event of faulty or misleading drafting?

A misleading certificate triggers the employer's civil liability toward a third party hiring the applicant, potentially leading to damage claims in the region of 15 000 CHF by way of example.

Does a structural work apprentice receive an ordinary certificate under the Code of Obligations?

Yes, supplemented by the attestations under art. 14 LFPr and art. 38 LFPr confirming the successful completion of vocational qualifications and official issuance of the cantonal federal certificate of capacity.

Rigorous drafting ensures statutory compliance and avoids joint-body disputes. Continue your operational management with our specialized analyses:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.