Practical guide

Joint and Several Liability in Construction (LDét): How to Avoid Paying Subcontractor Debts

Master joint and several liability under the LDét on Swiss construction sites: contractor due diligence and how to prevent costly financial claims.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Civil court ruling ordering payment of net minimum wage arrears for subcontracted personnel, which can exceed several tens of thousands of CHF under art. 5 LDét and art. 8a ODét.
  2. Legal / Joint body / SUVA: Administrative sanctions imposed on the contracting employer for failure to prove the due diligence required by art. 5 LDét and art. 9 LDét.
  3. Administrative / Acceptance: Frozen final accounts, contractual disputes during the inspection of the work under norm SIA 118, and enforcement actions by joint committees.

On Swiss construction sites, a contracting employer delegating work risks having to pay their subcontractor's unpaid wages out of pocket. Under art. 5 LDét, this joint and several liability covers compliance with the minimum working conditions and net minimum wages set out in art. 8a ODét, once debt enforcement against the direct or lower-tier subcontractor has failed. This guide details the practical requirements placed on employers to prevent unexpected financial back-payments.

To secure a valid exemption if a partner defaults, art. 5 LDét and art. 8c ODét require establishing strict compliance with due diligence through verifiable organisational measures. The contractor must request the supporting documents specified in art. 8b ODét, such as certificates from joint bodies or formal declarations, to secure the entire contractual chain across French-speaking Switzerland.

Joint and several liability mechanism and due diligence (LDét)

In building construction, civil engineering, and finishing work covered by the activities in art. 5 ODét, the contracting employer is liable for the wage debts of their subcontractors. Under art. 5 LDét, this obligation applies whenever the direct subcontractor or a lower-tier subcontractor has been the subject of unsuccessful prior debt enforcement or cannot be pursued in Switzerland. The basis of this liability is the net minimum wage defined in art. 8a ODét, corresponding to the amounts remaining after deduction of social security contributions, withholding tax, and contributions required by collective agreements declared generally binding under the LECCT.

To eliminate this financial risk, art. 5 LDét allows the contractor to prove that they satisfied their duty of due diligence. Art. 8c ODét specifies that this requires establishing strict contractual and organisational measures right from the conclusion of the contract for work. Under art. 8b ODét, the contracting employer may require various supporting documents, including a posting declaration, a written commitment guaranteeing the payment of minimum wages, certificates issued by joint committees, or proof of registration in an official trade register.

Checklist of mandatory controls to secure subcontracting

Audit area Required supporting document (ODét / LDét) Timing of check Risk in case of missing documentation
Net minimum wages Joint committee certificate or written commitment under art. 8b ODét Before work starts on the construction site Joint liability for wage arrears (art. 5 LDét)
Posted workers Proof of advance notification submitted under art. 6 LDét At least 8 days before starting work Administrative fine of up to 5000 francs (art. 9 LDét)
Foreign workforce Work permit under art. 11 LEI From the very first day on site Criminal prosecution for unauthorised employment (art. 117 LEI)
Working time records Time sheets compliant with art. 73 OLT 1 Weekly or monthly during the construction site Inability to rebut claims for additional hours
Administrative audits Complete file submitted to enforcement bodies (art. 6 LTN) At any time during unannounced site visits Fine for obstructing an inspection (art. 18 LTN)

Common management pitfalls and financial impacts on site

A classic mistake is signing a contract for work without a clause prohibiting unauthorised multi-tier subcontracting. When a subcontractor delegates part of their scope to an undeclared third party without providing the declarations required by art. 8b ODét, the main contractor loses traceability across the execution chain. If that third party fails to pay their workers, art. 5 LDét shifts the wage liability directly back to the original contractor as soon as the executing party's insolvency is established.

Another frequent oversight is relying on simple declarations of intent instead of checking actual payroll records. During an audit conducted by a joint committee or the cantonal inspection body acting under art. 6 LTN, an incomplete certificate does not suffice to prove the due diligence required by art. 5 LDét. The contractor then faces not only joint liability for unpaid wages, but also administrative sanctions of up to 5000 francs under art. 9 LDét. In a scenario involving four workers over three months, the financial clawback for net wages and audit fees can easily create an unforeseen liability of 35 000 CHF to 50 000 CHF.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The amounts and operational figures below are illustrative examples intended to model regulatory risk management.

Scenario A: Installation of facade cladding in the Canton of Vaud

A general contractor oversees the refurbishment of an office complex in Lausanne. They hire a subcontractor to install cladding, deploying six installers. To satisfy the duty of due diligence set out in art. 5 LDét and art. 8c ODét, the contracting employer requires the following prior to site commencement: a compliance certificate issued by the Vaud joint committee, copies of employment contracts confirming standard local wages (art. 322 CO), and written confirmation that any further subcontracting requires prior written consent. Through this documentation process, the main contractor proves due diligence and is cleared of any liability during an unannounced joint committee inspection on site.

Scenario B: Masonry work in the Canton of Geneva

On a multi-family housing development, an SME delegates structural finishing work to an external firm providing four masons. The partner ceases payments before completion and disappears without paying the net wages owed. Under art. 5 LDét, the contracting employer becomes jointly liable once debt enforcement proves fruitless. However, the contractor submits the weekly attendance logs required by art. 73 OLT 1, valid posting certificates, and the formal declaration under art. 8b ODét signed upon ordering. This thorough traceability proves compliance with due diligence and prevents the transfer of wage arrears claimed by the workers.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Which wage claims fall under joint and several liability?

Under art. 5 LDét, the contractor is liable for the net minimum wage defined in art. 8a ODét, including statutory paid holiday under art. 329a CO, once prior debt enforcement against the subcontractor has failed.

In accordance with art. 8b ODét and art. 8c ODét, obtain a joint committee certificate and signed declarations of compliance with standard terms before work starts, and verify the advance notification under art. 6 LDét.

What administrative fine can a negligent contractor incur?

In the event of a breach of due diligence under art. 5 para. 3 LDét, the authority can impose an administrative fine of up to 5000 francs under art. 9 LDét.

Can the client be held jointly and severally liable?

No, art. 5 LDét applies only to the contracting employer delegating finishing work in construction, excluding the ultimate building owner from this statutory joint liability regime.

Does a subcontractor's bankruptcy trigger direct payment?

Yes, if the subcontractor cannot be subject to debt enforcement under art. 5 para. 2 LDét, a contractor who cannot prove due diligence must pay the net wage arrears minus social security contributions.

How do you distinguish subcontracting from illegal labour leasing?

Supplying personnel without independent supervision falls under art. 12 LSE, punishable by fines of up to 100 000 francs under art. 39 LSE, which differs from an independent contract for work.

To shield your business against partner defaults, contractual verification and regular joint committee monitoring remain essential. Learn more about these operational requirements in our dedicated guides: