Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

Non-Compete Clauses for Site Managers and Cost Estimators (CO): When Do They Apply?

Validity of non-compete clauses for Swiss construction managers: CO requirements, customer base, trade secrets and enforceable limits.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Litigation costs and gross margin losses, typically in the range of 40 000 CHF to 80 000 CHF as an illustration, if an excessive clause is struck down under art. 340a CO.
  2. Legal / Joint Body / SUVA: Absolute nullity of the covenant for lack of a written agreement meeting art. 340 CO requirements or in the absence of genuine access to actionable trade secrets.
  3. Administrative / Handover: Blocked hiring of a key technical manager following a civil dispute arising from an individual employment contract under art. 319 CO.

In the Swiss construction sector, non-compete clauses are frequently included in contracts for site managers, cost estimators, and site supervisors. Under art. 340 CO, this written agreement is legally valid only if the employment relationship gives the employee access to customer data or to manufacturing or business secrets, and if the use of such information could cause substantial harm to the employer.

This guide sets out the conditions under art. 340a CO, which requires appropriate restrictions regarding place, time, and scope of business, while empowering judges to reduce an excessive restriction. This analysis helps company directors and technical managers understand the true legal scope of these covenants during hiring or career moves.

Substantive validity criteria applicable to construction managers

In performing an individual employment contract governed by art. 319 CO, by which the employee undertakes to work in the employer's service for a fixed or indefinite period and the employer undertakes to pay a salary based on time or work performed, enforcing a non-compete covenant requires strict conditions. In accordance with art. 340 CO, the employer must prove that the employee actually has access to manufacturing or business secrets, or to clientele, and that using this knowledge could cause substantial harm.

For a cost estimator, holding business secrets is often demonstrated when the employee masters detailed unit-price breakdowns, internal margins, negotiated supplier price agreements, or the SME's cost-accounting structure. Conversely, for a site manager assigned to site management and execution supervision, client knowledge largely depends on personal skills, field relationships, and technical management. Settled Federal Supreme Court case law holds that when the relationship with the client depends on the employee's personal qualities, the clause is ineffective.

Time, geographic, and scope limits of the covenant

Article 340a CO provides that a non-compete restriction must be appropriately limited in terms of place, time, and scope of business. The duration may exceed three years only under special circumstances, and the court may reduce an excessive restriction. In the Swiss construction market, a duration between six and twelve months remains standard practice. A reasonable geographic scope is limited to the company's actual operating area (for example, a single canton or a radius of 20 to 30 kilometres) and cannot cover all of French-speaking Switzerland without compelling justification.

Target role Access to business secrets Nature of client relationship Admissible geographic scope Validity under art. 340 CO
Lead cost estimator / Quantity surveyor High (calculation methods, purchasing schedules, margins) Indirect (limited direct commercial contact) Cantonal or regional operating radius of the firm Enforceable if risk of substantial harm is established
Structural work site manager Low (construction site processes are largely standardised) Direct, but tied to personal managerial skills Strictly limited to the footprint of supervised sites Rarely upheld (frequently struck down by courts)
Branch technical director Very high (strategy, tenders, actual cost base) Mixed (institutional and contractual) Operating canton and directly bordering cantons Enforceable if compensation and boundaries are balanced
Foreman / Chargehand None (pure on-site operational delivery) Operational (no commercial decision-making authority) Unjustifiable Void as a matter of law for lack of protectable interest
HVAC technical office technician Moderate (detailed layout drawings, equipment sizing) Technical (dealings with engineering consultants and PMOs) Geographic area of regular contracting authorities Partially enforceable, subject to judicial reduction

Common drafting errors and financial exposure

Drafting a generic, one-size-fits-all clause across all roles exposes companies to serious setbacks. Defining an overly broad scope (such as all of French-speaking Switzerland for a local earthmoving contractor) results in judicial reduction under art. 340a CO. Court and legal advisory costs can easily reach 15 000 CHF to 30 000 CHF as an illustration, without securing the intended protection when the employee joins a local competitor.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and scenarios presented below are illustrative examples intended to guide contractual decisions.

Scenario 1: Lead estimator at a general contractor (Canton of Vaud)

At a Vaud general contractor with 45 employees building residential developments, the lead estimator resigns to join a direct competitor in the same district. His employment contract includes a non-compete covenant barring similar work for twelve months across the cantons of Vaud and Geneva. Having prepared bids for recent calls for tenders and knowing net margins for each trade, the former employer can prove a risk of substantial harm under art. 340 CO. The restriction is deemed proportionate as it is confined to cost estimation for private and public procurement contracts.

Scenario 2: Structural work site manager (Canton of Fribourg)

A Fribourg masonry firm with 25 employees inserts a two-year non-compete clause in its site manager's contract. When he leaves for a local rival, the management cites the loss of two clients to his new employer. The evidence shows that these clients followed the professional because of his proven technical field skills rather than any confidential company know-how. Under art. 340 CO and art. 340a CO, the court finds the clause unenforceable, as client loyalty was founded on the site manager's personal abilities.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Does a written clause automatically bind a site manager?

No. Under art. 340 CO, the employer must prove access to trade secrets or clients and the risk of substantial harm, which is often challenged if the client awards contracts through tenders.

Can a non-compete clause apply to a cost estimator?

Yes, if their knowledge of internal margins causes direct harm. However, art. 340a CO requires strict limits regarding geographic area, duration, and scope of business to avoid reduction.

What is an appropriate contractual penalty amount to specify?

An illustrative penalty ranging from 30 000 CHF to 60 000 CHF is common. The court may reduce an excessive penalty pursuant to art. 340a CO.

Does the clause remain valid after resignation for good cause?

No. If the employee terminates the contract for reasons attributable to the employer or in the event of dismissal without valid reasons under art. 337c CO, the restriction lapses.

Is a clause covering all of French-speaking Switzerland valid for an SME?

Rarely. The geographic scope must match the company's genuine operating area. Under art. 340a CO, the court will narrow the territory if it exceeds objective business requirements.

Must the employer pay financial compensation for a non-compete in Switzerland?

The Code of Obligations (CO) does not explicitly require this under art. 340 CO. However, providing financial compensation makes it far easier to uphold the restriction before a court.

Drafting contractual covenants for technical managers requires carefully balancing business interests and economic freedom. To strengthen your recruitment processes, explore our practical guides:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.