Practical guide

Thermal Envelope Sections in Renovation: Reaching U <= 0.20 W/(m2K) under MoPEC and Building Programme Subsidies

1:20 building envelope sections for renovation. Reach U <= 0.20 W/(m2K) under MoPEC and secure Building Programme subsidies.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Rejection of the cantonal Building Programme subsidy application due to non-compliant insulation detailing, leading to a direct loss in the range of 15 000 CHF to 40 000 CHF under art. 365 CO.
  2. Legal / Joint Body / SUVA: Endangering others during the installation of an external insulation assembly improperly anchored to the facade, giving rise to criminal liability under art. 229 CP in the event of bodily injury.
  3. Administrative / Acceptance: Blocking of the acceptance of the work under standard SIA 118 and refusal of the municipal energy retrofitting certificate, requiring costly remedial work under art. 368 CO.

Drafting technical thermal envelope sections at 1:20 and 1:5 scales is the central asset to guarantee a U-value lower than or equal to 0,20 W/(m2K) during major facade refurbishments in Switzerland. Aimed at architects, architectural draughtspeople and civil engineers, this drafting procedure formalises insulation continuity against existing masonry while preventing interstitial condensation forbidden by building physics.

Rigorous integration of the standards set out in the Model Cantonal Energy Directives (MoPEC) determines whether financial assistance from the Building Programme is granted. A meticulous working section eliminates linear thermal bridges at slab junctions and window reveals, safeguarding overall performance prior to inspection by the site management and approval by the municipal authority.

Drafting method for working sections to reach U <= 0.20 W/(m2K)

Drawing a thermal envelope section for renovation requires a rigorous drafting method at 1:20 for the general build-up and at 1:5 for connection details. Compliance with the requirements of the Model Cantonal Energy Directives (MoPEC) and the granting of Building Programme subsidies require graphically proving the seamless continuity of the insulation layer. The thickness of the added insulation must offset the poor thermal resistance of existing brick, rubble stone or uninsulated concrete masonry.

On working drawings, the draughtsperson must represent the moisture-control layer continuously. The interior vapour check or vapour barrier must be drawn with meticulous airtightness against floor slabs and shear walls, in accordance with the recognised rules of building physics. On the exterior side, the section must detail the breathable wind barrier and ventilated air cavity in the case of a ventilated rainscreen facade, or the reinforcement mesh embedded in adhesive mortar for an external thermal insulation composite system (ETICS). The contractor remains bound to inspect the existing substrate under art. 365 CO to notify the site management if unevenness or residual moisture compromises the bond of the assembly.

Comparative specifications of facade assemblies in energy retrofitting

Existing construction typologyAdded insulation assemblyIndicative minimum thicknessTarget U-valueDrafting watchpoints at 1:5
25 cm clay brick masonryMineral wool beneath mineral render160 mm to 180 mm0,18 W/(m2K)Mechanical anchoring using thermally broken anchors
50 cm limestone rubble wallInterior wood-fibre insulation140 mm to 160 mm0,20 W/(m2K)Flawless continuity of the hygrovariable vapour check
1970s 20 cm cast-in-place concreteGraphite EPS with render on insulation140 mm to 160 mm0,17 W/(m2K)Watertight junction beneath base plinth flashing
Uninsulated timber frame facadeMineral wool between studs and PIR boards120 mm + 60 mm0,16 W/(m2K)Overlap of windtight and airtight membrane sheets
Cavity brick masonry with air gapBlown-in insulation and external over-insulation60 mm + 120 mm0,19 W/(m2K)Rigorous sealing around lintels and reveals

Recurring drafting errors and financial impacts on the construction site

Omitting the precise dimensioning of the insulation return along window reveals is a common oversight during the execution phase. When a 1:20 drawing fails to detail a minimum thickness of high-performance insulation at the reveal, a massive linear thermal bridge forms around the perimeter of the subframe. This defect lowers the interior surface temperature below the dew point, triggering premature mould growth. Remedial works on site to cut back the masonry and rebuild the reveals incur corrective costs in the region of 8 000 CHF to 18 000 CHF.

A second major divergence involves detailing the facade base where it meets finished ground level. If the section does not extend rot-proof insulation below ground level with a drainage waterproofing layer, capillary moisture penetrates the thermal assembly. The client can then demand full rectification under art. 368 CO. Furthermore, facade scaffolding must comply with art. 26 OTConst whenever the fall height exceeds 3 m, meaning that bracket anchor points must be anticipated without puncturing the finished thermal insulation, avoiding subsequent legal expert disputes.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following figures are illustrative examples intended to guide technical design across theoretical building envelope retrofitting scenarios.

Typical scenario 1: Renovation of a 1960s residential building in the Canton of Vaud

On an 18-unit reinforced concrete residential building located on the Vaud Riviera, the site management plans an external thermal insulation composite system to achieve a U-value of 0,18 W/(m2K). The construction site crew consists of 6 facade workers. The draughtsperson prepared a 1:5 detail section incorporating 160 mm of bonded and anchored graphite EPS, featuring an insulated cellular glass plinth starter strip extending 40 cm below natural ground level. This drawing secured approval of the cantonal Building Programme subsidy application on first submission. Construction site planning incorporated the requirements of art. 4 OTConst with a written plan detailing occupational safety measures and safe access to work stations at height.

Typical scenario 2: Retrofitting a protected semi-detached home in the Canton of Fribourg

A Fribourg home subject to heritage constraints on its exterior facade must undergo interior thermal insulation to achieve a U-value of 0,20 W/(m2K). The installation crew comprises 3 plasterers and carpenters. The 1:5 technical section details a lining structure comprising 140 mm of bio-based rigid insulation boards and an airtightness membrane bonded around the perimeter with suitable adhesive beads. The junction against intermediate timber floors incorporates neat notching around the joists to prevent interstitial condensation. The graphical precision of the section ensured compliance of the work without causing unexpected cost overruns during final site inspections.

Surfaces, standards and permits: free tools

SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.

View engineering tools

Frequently asked questions

What minimum U-value must be drawn to secure cantonal subsidies?

The Building Programme requires a maximum U-value of 0,20 W/(m2K). Under MoPEC, the insulation thickness shown on the working section secures the payout of an illustrative subsidy of 40 CHF per square metre.

How should hazardous pollutant surveys be coordinated before opening up a facade?

In accordance with art. 32 OTConst, if the presence of asbestos is suspected, the employer plans the necessary measures. Art. 16 OLED requires hazardous pollutants to be identified in the municipal building permit application.

What impact does the revised defect notice deadline have on sections?

Since 2026, art. 367 CO grants the real estate client 60 days to report defects. Precise working drawings dimensioning every layer prevent liability claims for envelope workmanship defects.

Is formal permission required to insulate an external facade?

Under art. 22 LAT, structural alterations require municipal approval. Art. 18a LAT simplifies procedures for rooftop solar installations, but thickening a facade requires planning submission plans that respect building set-back lines.

How should mineral demolition waste from walls be managed?

Art. 17 OLED requires materials to be sorted directly on the construction site. Under art. 20 OLED, demolition concrete must be fully recycled, avoiding disposal costs estimated at 180 CHF per tonne.

What drawing scale should be chosen to demonstrate the elimination of thermal bridging?

The planning application package accepts 1:100, but the site management requires 1:20 for the quote broken down by CFC work sections and 1:5 for airtightness details.

The accuracy of the technical envelope drawing ensures MoPEC energy compliance and approval of subsidies by cantonal authorities. To explore your construction detailing further, consult our complementary guides: