Table of contents
The 3 Major Site Risks
- Financial / Margin: Volumetric estimation discrepancy potentially reaching 10% to 15% of the overall volume, distorting the preliminary budget by around 60'000 CHF to 180'000 CHF on a typical residential project due to incorrect allocation of voids and projections under SIA 416.
- Legal / Joint body / SUVA: Incorrect geometric classification in the public planning submission file under art. 22 LAT, leaving the project open to building permit blocks by the municipality or formal appeals from neighbours.
- Administrative / Acceptance: Inaccurate municipal taxation for utility connections or disputes over the final account during works inspection under SIA 118 due to confusion between SIA 116 gross cube and net building volume.
Replacing the former SIA 116 standard with the SIA 416 standard substantially alters the method used to determine volumes in Swiss building projects. Intended for architects, architectural draughtspersons and civil engineers, this technical comparison clarifies the physical boundary rules for building volume, covering both fully and partially enclosed spaces.
In Swiss administrative and economic practice, the coexistence of historical communal building regulations and updated spatial planning directives causes frequent confusion. Applying exterior reference lines rigorously ensures accurate cost estimates, coherent planning applications and correct utility connection charges.
Structural divergences between SIA 416 building volume and SIA 116 cubature
The SIA 416 standard defines building volume as the spatial volume bounded by the exterior surfaces of the enclosing building components, such as external walls, roofs and ground-bearing floor slabs in direct contact with the ground. Unlike the former SIA 116 standard, which relied on flat-rate heights measured from the top of the foundation slab or raw slab to the roof ridge, the current method eliminates any notion of theoretical extrapolation. Every enclosed or partially enclosed space strictly reflects the actual geometry of the building envelope.
The former SIA 116 standard excluded certain underground volumes or applied geometric reductions to unfinished attics and interior voids. The SIA 416 standard removes these approximations by establishing a direct correspondence between floor area and actual building volume. For planners and draughtspersons, this rigour means extracting volumes directly from the three-dimensional digital model by following the finished outer edge of ventilated or insulated facades, fully accounting for the entire thickness of the thermal assemblies.
Comparative table of volumetric calculation parameters
| Building component | Rule under former SIA 116 standard | Rule under SIA 416 standard | Consequence for the designer |
|---|---|---|---|
| Storey voids and galleries | Accounted for on a flat-rate basis using theoretical storey heights. | Actual volume measured between the inner faces of the elements enclosing the void. | Accurate three-dimensional modelling of floor openings without extrapolation. |
| Loggias and covered balconies | Partially included using variable reduction coefficients. | Counted in building volume if enclosed on at least three sides. | Clear distinction between net volume and enclosed envelope volume. |
| Pitched roofs and attics | Calculated using geometric prisms often truncated below a minimum headroom. | Full inclusion of the volume up to the exterior roof surface. | Accurate inclusion of peripheral insulation and under-roofing layers. |
| Basements and foundations | Calculation start point often set at the finished raw basement level. | Strictly bounded by the underside of the raft or foundation slab. | Inclusion of screeds laid to fall and perimeter downstands. |
| Projections and technical services | Tolerance rules excluding chimneys, dormers and minor eaves overhangs. | Included as soon as there is usable enclosed space or a sheltered plant room. | Strict control of rooftop plant enclosures on flat roofs. |
Common modelling errors and financial repercussions
Confusion between the two standards frequently arises when applying communal building regulations. Many municipalities in French-speaking Switzerland still maintain fiscal clauses based on the SIA 116 building cube to determine water supply and sewage connection charges, whereas the planning application file required by art. 22 LAT is prepared under the SIA 416 standard. Confusing net building volume with historical gross cubature leads to substantial geometric variances of 8% to 12%.
In terms of costs classified by the Building Cost Code (CFC), underestimating the volume directly distorts the estimated ratios per cubic metre. This distortion affects both the unit cost ratio and the calculation of associated areas. An uncontrolled volumetric discrepancy of 250 m³ on a medium-sized building creates an illustrative budget variance of around 45'000 CHF to 90'000 CHF as early as the preliminary design phase, distorting financial breakdowns and technical sizing.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The following numerical figures are purely illustrative examples intended to guide methodological choices during the project phase.
In the Canton of Vaud, a construction project involves erecting a six-unit residential apartment building with an underground car park. The planning team comprises two architects, an architectural draughtsperson and a civil engineer. During the planning application phase pursuant to art. 22 LAT, the architectural practice calculates the project at 2'850 m³ of building volume under SIA 416, precisely including the underside of the insulated raft foundation and enclosed loggias.
However, the municipal technical department still applies a local regulation that determines administrative fees and sanitation charges under the former SIA 116 standard, yielding 2'610 m³ due to deductions applied to unheated attic spaces. To prevent an administrative dispute resulting in an unwarranted fee surcharge of 14'500 CHF, the draughtsperson produced a dual allocation schedule on the summary sheet of the planning application file:
- Automated extraction of envelope volume according to SIA 416 for thermal sizing and CFC financial estimates.
- Geometric justification aligned with former SIA 116 criteria for municipal connection charge approvals.
This clear distinction ensured legal compliance for the permit while maintaining an accurate financial estimate for the client.
Surfaces, standards and permits: free tools
SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.
Frequently asked questions
How can an SIA 116 volume be converted to an SIA 416 volume without a full survey?
An automatic conversion is ruled out because standard SIA 416 excludes unclosed roof voids. A geometric recalculation on the model is required to avoid an estimated discrepancy of around 45 000 CHF.
What impact does building volume have on municipal utility connection charges?
Communal regulations often base administrative charges on the cubic metre built. Switching to SIA 416 alters the taxable volume, sometimes adjusting the fee by around 3 500 CHF.
Why does the SIA 116 standard still appear in ECA insurance policies?
Certain cantonal building insurance institutions retain this historical calculation to assess replacement value. The loss adjuster applies specific cantonal fee scales based on costs around 850 CHF per cubic metre.
In the event of a dispute over a building's estimated volume, which document prevails?
Under art. 367 CO, the client notifies the architect of defects. The SIA 416 standard takes contractual precedence unless the specific conditions of the construction contract or architect's agreement specify the old method.
How should projecting balconies be handled when calculating building volume for a PPE property?
Under the Swiss Civil Code (CC), condominium ownership distinguishes between private and common parts. SIA 416 classifies open balconies outside enclosed building volume, preventing overvaluation of the property.
Which document governs acceptable tolerances when calculating the cubature of a house?
SIA 416 sets strict spatial boundaries. If an approximate quote is challenged, art. 375 CO protects the client against an unforeseen, excessive cost overrun of around 80 000 CHF.
Methodological transition and compliance of planning application files
Moving away from the former SIA 116 standard in favour of SIA 416 directives safeguards financial project estimates, the calculation of statutory fees and the coordination of statutory permits under the Federal Act on Spatial Planning (LAT). To explore calculation rules for building envelopes and density indices applied to working drawings in French-speaking Switzerland, read our technical analyses:
- Calculating SIA 416 Areas, Building Volumes and Cantonal Plot Ratios (IBUS, IUS, IOS) in Switzerland
- Visual Breakdown of Areas GF, UF, CF, IF and EF According to Swiss Standard SIA 416
- Calculating the IBUS (Gross Floor Area Ratio - AIHC) Step by Step: Basements, Attics, and Balconies
- Determinant Floor Area (SPd) vs Energy Reference Area (SRE SIA 380/1): Stop the Confusion