The 3 Major Site Risks
- Financial / Margin: Centre-to-centre spacing error between the SMS standard (55 cm width) and the Euro format (60 cm width), leading to complete rework of plinths and worktops, resulting in a net loss in the region of 4 500 CHF to 9 000 CHF per unit under art. 368 CO.
- Legal / Joint Body / SUVA: Inaccurate wall fixing of heavy suspended units creating a risk of personal injury on the construction site, punishable under art. 229 CP in the event of deliberate disregard for the recognised rules of construction.
- Administrative / Acceptance: Rejection of the minutes during the joint inspection under standard SIA 118 due to misplaced plumbing penetrations, blocking deliveries and advance payments from the client.
Drafting interior fit-outs according to CFC chapters 258 (kitchens) and CFC 273 (cabinetmaking and general joinery) demands absolute geometric precision between the rough dimensions of the structural work and the finished installation dimensions. This technical guide is aimed directly at architects, architectural draughtspersons, site managers, and joiners dealing with the technical coordination of fluid and electrical networks on Swiss construction sites.
Integrating both the Swiss national SMS standard and standard European modules requires finalising working elevations to the nearest millimetre before building services trades start work. Under art. 365 CO, the contractor must immediately report any discrepancies in dimensions or plumb on the masonry substrate that could jeopardise the work, thereby ensuring full compliance with standard SIA 118 upon handover.
Working drawing dimensioning methodology: Swiss SMS standard versus Euro template
Drafting interior fit-out plans for kitchens and joinery (CFC 258 and CFC 273) is based on a strict dimensional distinction between the Swiss Measurement System (SMS) and the international Euro format. The SMS standard structures its cabinets on a width of 55 cm, a carcass depth of 60 cm, and an elevation grid standardised by precise height units. Conversely, the Euro format imposes a modular width of 60 cm and a standardised depth of 60 cm. This difference alters the centre lines of slab penetrations, plumbing connections, and flush-mounted electrical back boxes.
On the 1:20 working drawing and 1:10 elevation details, the draughtsperson must dimension components relative to the official datum line set at one metre above the raw finished floor. Coordination entails simultaneously showing centre-line dimensions for plumbing pipes (cold water, hot water, drainage) and dedicated electrical outlets (direct connection for hob, oven, dishwasher, and refrigerator). Under art. 365 CO, any contractor or agent who discovers a dimensional discrepancy between the technical documentation and the constraints of the structural work must immediately inform the client, or risk bearing the financial consequences of the mismatch.
Comparative table of drafting requirements between fit-out standards
| Technical and geometric criterion | Swiss SMS standard (CFC 258) | Standard European format (CFC 258) | Bespoke fit-outs (CFC 273) | Impact on the coordination drawing |
|---|---|---|---|---|
| Nominal grid width | 55 cm (multiples of 5,5 cm) | 60 cm (multiples of 10 cm) | Variable based on millimetre site survey | Exact positioning of drainage centre lines |
| Recommended plinth height | 10 cm to 15 cm adjustable | 10 cm to 15 cm adjustable | 5 cm to 20 cm depending on design | Screed recess and technical baseboard routing |
| Overall worktop depth | 60 cm to 65 cm | 60 cm to 65 cm | Variable according to layout pattern | Alignment of end panels and wall chases |
| Installation tolerance on finished wall | ± 2 mm using filler strips | ± 2 mm using filler strips | Adjustment via mitred profiles | Checking partition squareness |
| Integration of technical tall units | Modular heights 1/6 to 6/6 | Standardised built-in niches | Full-height panelling | Relocating supply lines to transoms or plinths |
Analysis of frequent drafting errors and financial impacts
Failing to account for plaster and dry-lining thicknesses is the most common drafting error. Drawing a corner unit or a continuous run built in between two partitions without including a compensation filler strip of at least 20 mm to 50 mm prevents drawers or front doors from opening. Joinery workshop adjustments, recutting composite stone worktops, and modifying carcasses generate illustrative extra costs in the region of 2 200 CHF to 5 800 CHF per affected residential unit.
Omitting plinth and transom ventilation for integrated refrigeration appliances leads to mechanical overheating. On working elevations, the free-air ventilation cross-section must be clearly indicated below the carcass and at the top of the tall cabinet. Similarly, incorrect vertical positioning of the wastewater rough-in under the sink can prevent the installation of a pull-out waste sorting drawer. Reworking embedded pipework then requires core drilling or an additional chase in the masonry, with an estimated cost in the region of 1 200 CHF to 3 100 CHF.
The structural integrity of wall-mounted unit fixings requires precisely identifying the wall construction (lightweight plasterboard partition, clay brick, or concrete). If wall anchoring is not sized for the heavy loads of upper cabinets filled with crockery, the risk of failure poses a direct threat to user safety. Such a serious safety failure falls under art. 229 CP in cases of deliberate breach of the recognised rules of construction creating a danger to life and limb.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and data presented below are illustrative examples constructed for methodological learning purposes.
Typical scenario 1: Refurbishment of a rental property portfolio in the Canton of Vaud
In a twelve-unit residential building in Lausanne, the site management is coordinating the complete replacement of kitchen fit-outs (CFC 258). The original 1980s drawings were designed around the 55 cm Swiss SMS grid. The client approves installing contemporary units in the 60 cm Euro format to streamline procurement costs. The drafting team had to recalculate all centre-line dimensions: the overall 15 cm enlargement across a run of three main modules required shifting the water inlets and the extractor hood duct on the 1:20 plans. Integrating 35 mm asymmetrical end filler strips compensated for out-of-square existing walls, avoiding dry-lining repairs and yielding an estimated overall saving in the region of 8 400 CHF on the joinery package.
Typical scenario 2: Bespoke commercial office fit-out in Geneva
On a commercial office project in Geneva, the scheme includes acoustic wall cladding and bespoke joinery for a reception area and tea points (CFC 273). The draughtsperson produced a 1:5 detail book specifying the concealed routing of power and data cabling behind removable solid wood service plinths. Material compliance with fire safety standards was confirmed prior to layout marking. Elevation plans incorporated 15 mm shadow gaps around ceiling and floor perimeters to accommodate concrete slab deflection tolerances, ensuring an immaculate fit during on-site installation.
Surfaces, standards and permits: free tools
SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.
Frequently asked questions
What dimensional tolerance should be allowed on an SMS kitchen drawing against structural work?
Allow a lateral adjustment gap of at least 20 millimetres. Under standard SIA 118, these allowances prevent workshop modification costs in the region of 450 CHF.
How do you coordinate CFC 258 plumbing rough-ins with technical service openings?
Show drainage centre lines within plus or minus 10 millimetres on the elevation drawing. Art. 365 CO requires immediate notification of site management if masonry hinders flush fitting.
What contractual status do CFC 273 Interior Joinery drawings hold?
Approved working drawings define the works contract under art. 363 CO. Any subsequent geometric alteration without an addendum exposes the client to workshop costs in the region of 1 200 CHF.
What sill height should be shown on drawings to fit a worktop under a window?
The rough-to-finished dimension requires 920 millimetres below the profile. An unflagged height discrepancy triggers liability under art. 365 CO, requiring complete reworking of wooden plinths.
How do you graphically represent ventilation openings for an induction hob extractor?
Show plinth cut-outs and 150-millimetre flat ducting. Under standard SIA 118, approval of the layout plan releases manufacturing without risk of fitment defects.
If a dimensioning error is discovered upon delivery of the fit-outs, what is the remedy?
The client inspects the work and gives notice of defects under art. 367 CO. Free rectification applies to correct units that do not comply with the approved drawing.
Millimetre-precise kitchen and interior joinery plans ensure seamless technical interface coordination and protect overall project profitability.
Explore our technical working drawing guides to refine your drafting details:
- Technical Wall Sections (1:20 / 1:5), CFC Execution Details and Building Physics (SIA 180 / 181 / MoPEC)
- Drafting 1:20 and 1:5 Construction Detail Sections Without Linear Thermal Bridges (SFOE / SIA Catalogue)
- Sections and Parapet Upstand Details for Green or Gravelled Flat Roofs According to SIA 271 (CFC 224)
- 1:5 Installation Details for Triple-Glazed Windows and Barrier-Free Thresholds <= 25 mm (Standard SIA 500)