Building interior in a 3D view: background image for the Processus page on site safety

Processus · Safety and temporary workers

Site safety: Suva life-saving rules, the STOP signal and inducting temporary workers on mobile

A temporary worker’s first day comes down to a few actions: being welcomed in their language, signing, knowing they can say STOP.

A temporary worker arrives on a Monday morning at a site they do not know, often speaking a language that is not the foreman’s. That first day weighs heavily: do they know Suva’s life-saving rules, do they know they can stop work, and who to alert? This page describes how Art Construction Processus helps to organise site safety around day 1: a recorded briefing, a signed induction in the person’s language, the STOP signal. The software helps; safety decisions and responsibility remain with the company.

Art Construction ProcessusSafety, induction and follow-up on site
14-day trial
  • STOP signal: foreman, site manager and business owner alerted
  • Morning safety briefing for the whole team
  • Signed induction in six languages, with pictograms
  • “Temporary” status, roles and QR codes
Start the 14-day trial See the demonstration

From CHF 99 per month, excl. VAT. Nothing is charged at the end of the trial.

A temporary worker’s first day: the moment not to miss

Construction companies use temporary staff to absorb peaks in workload. The person arrives with their experience, but without knowing the site, the team, the local instructions or the foreman. In Switzerland, teams are often multilingual: French is not always enough, nor is German.

Suva’s life-saving rules and the right to say STOP in case of danger are well-known reference points in the industry. It is still necessary that the temporary worker knows them, understands them in their own language and knows whom to turn to. The right and duty to interrupt dangerous work are of no use if they stay in a binder.

What a temporary worker must know from day 1

What Processus brings on day 1 and the days that follow

Processus brings together the functions useful for welcoming a person, opening the day and reacting when a risk appears, as they exist in the software in service.

Signed induction in the person’s language

Each person chooses their language from French, German, Italian, Spanish, Portuguese and Albanian. The induction is signed, and pictograms accompany the text.

Morning briefing for the whole team

Before starting work, everyone follows the same safety briefing: temporary and permanent staff begin the day with the same instructions.

STOP signal

When a person sees a danger, they report it from the field as a STOP, a problem, an idea or an emergency. The alert reaches the foreman, the site manager and the business owner.

“Temporary” status and roles

A person can carry the “temporary” status, and roles set who sees what. QR codes give access to the sheets from the phone.

Three steps to get a temporary worker’s day 1 right

Day 1 is prepared the day before. Once the arrangement is in place, it comes down to a few actions, and the foreman keeps time for the essential: explaining the job.

Step 1: prepare the arrival

Create the person with the “temporary” status and choose their induction language from the six available. Check their role: it sets what they see in the software.

Step 2: welcome and have them sign

In the morning, the person follows the safety briefing with the team and signs their induction in their language, supported by pictograms. The signature documents the induction; it does not replace the explanation given on site.

Step 3: give the right to say STOP

Show how to report a STOP, a problem or an emergency from the field. The foreman, the site manager and the business owner are alerted; the decision to resume work rests with the company.

Posted notice, spreadsheet or procedures software: welcoming a temporary worker

Many companies already welcome their temporary workers with a notice, a few words spoken and an attendance sheet. The table compares three categories of approach for day 1, without brands.

What each approach allows on the day of arrival
Need on day 1Paper and noticesSpreadsheetProcedures software (Processus)
Induction in the person’s languageDepends on the sheets available and the foreman’s timeDepends on the columns and the translations preparedSigned induction in French, German, Italian, Spanish, Portuguese or Albanian, with pictograms
Record of the morning briefingAttendance sheet to signList to fill inMorning safety briefing and signed induction
STOP signal from the fieldCall or message with no shared recordLine to add after the eventReporting from the field; foreman, site manager and business owner alerted
Identifying temporary workersSeparate listColumn to keep up to date“Temporary” status
Taking the data backPhotocopies and scansReusable fileData exportable at any time

Non-exhaustive comparison of categories of approach. It says nothing about the contract with the staffing agency or the legal obligations tied to temporary staff, which are for the company.

14-day trial: starting price and limits of the software

The 14-day trial does not ask for a card, and nothing is charged at its end. The subscription starts at CHF 99 per month, excl. VAT, for a company of 1 to 5 people; the next tiers are CHF 179 and CHF 299. The price is calculated on the business owner, the site managers and the office; workers, foremen and guests are always included.

You pay by card, PayPal or bank transfer, with no automatic renewal: you decide at each renewal date. Before opening the trial, you can browse the public demonstration.

Frequently asked questions

In which languages is the temporary worker induction available?

In six languages: French, German, Italian, Spanish, Portuguese and Albanian. The language is chosen per person, and pictograms accompany the induction. For another language, the software offers no translated induction: arrange for a colleague to translate or another means, and keep a record of what you did.

What happens when a temporary worker triggers a STOP?

The report goes out from the field, and the foreman, the site manager and the business owner are alerted. The software warns the people concerned; what follows is for the company: stop, correct, resume. Say clearly from day 1 that STOP is part of everyone’s role and that the company expects it.

Does the software track temporary workers’ legal situation?

No. It helps to welcome, to brief and to report. Temporary agency contracts, permits, insurance and the division of tasks with the staffing agency remain with the company, the agency and, if needed, a lawyer or an adviser from your trade association.

Does the signed induction replace the instruction given by the foreman or the MSST specialist?

No. The signature documents that the induction took place; it replaces neither the foreman’s presence, nor the explanation of the job, nor the instructions of an MSST specialist. The software helps to apply the company’s instructions; Suva and your specialist remain the references for their content.

Going further

Software pages, tools that need no registration, guides on STOP, temporary workers and multilingual teams, and a neighbouring page on MSST.

Sources and limits. Functions described according to Processus in service on 26 November 2026. Indicative: Suva’s rules, the obligations tied to temporary staff and safety measures should be reviewed with your MSST specialist and your insurer. Prices in CHF, excl. VAT; the pricing page is authoritative.