Art Construction Free Studios

Free Online Construction Studios and Software for Swiss Construction Sites

Professional tools for Swiss construction companies: no registration, no installation, and without any file leaving your computer.

  • Free
  • No registration or installation
  • Your files remain in your browser
Filter by business workflow

No registration

Free studios

Try them right now in your browser. Each studio links to its full equivalent.

PDF Take-Off & Measurement Studio

Measure areas and lengths on a PDF drawing.

Open the studio Premium version: Soumissions · Plans Pro

SIA 451 Call for Tenders Reader & Editor Studio

Open, complete and verify an SIA 451 specification.

Open the studio Premium version: Soumissions

3D BIM-IFC Viewer & Inspector Studio

View a 3D IFC model and export quantities.

Open the studio Premium version: Plans Pro · Portail

Geo-Scanner Studio: Swiss parcel and constraints

Plot parcel, elevation and constraints for an address in Switzerland.

Open the studio Premium version: Portail · ERP

2D Construction Site Layout Plan Studio

Draw the site layout plan to scale.

Open the studio Premium version: Portail

Construction Gantt Schedule & OTConst/SUVA Milestones Editor

Construction site schedule in working days, with critical path.

Open the studio Premium version: Portail

Construction NPA and CLA Employer Hourly Cost Simulator

From base salary to daywork rate, line by line.

Open the studio Premium version: ERP

Element Cross-Section Studio (U-value, thermal lag, Glaser)

U-value, phase shift and condensation of a wall assembly.

Open the studio Premium version: ERP · Soumissions

About this tool

Why free studios directly in the browser

On the construction site or in the technical office, you often need to check a measurement, open an engineer's file, or inspect an item in a quote without delay. Installing heavy software requires IT privileges, regular updates, and sometimes costly licences for an occasional need.

Art Construction's online tools run instantly in your web browser. Access is open, with no prior registration and no account creation. You drag and drop your document into the window to start working without delay.

This operational model relies on local processing. Your computer calculates volumes, reads lines of code, or displays models without sending your working files through a remote server. You thus retain control of your time during evaluation phases or when responding quickly to a call for tenders.

This approach suits SME owners, site managers, and quantity surveyors seeking targeted tools for specific tasks in site preparation or execution monitoring.

The studios, from take-off to building physics

The range of open-access tools covers key stages of technical preparation and monitoring for your projects in French-speaking Switzerland:

  • Take-off and measurement on PDF plans: calibrate your scale from a known dimension, then measure kerb lengths, slab areas, or earthwork volumes directly on your PDF documents.
  • SIA 451 call for tenders reader and editor: open an architect's specification, fill in your unit prices, and instantly identify unpriced items before submitting your offer.
  • 3D IFC viewer and inspector: navigate the digital model, perform inspection cuts, take dimensions, and read quantities associated with building elements.
  • Geo-Scanner: enter a plot to view its coordinates, elevation, ground slope profile, and zoning constraints by querying the swisstopo public API.
  • 2D site logistics plan: position cranes with their working radii, place site accommodation, skips, and view oversailing or potential collision zones.
  • Construction Gantt scheduling: organise the interventions of various trades with indicative milestones for safety on the construction site.
  • Employer hourly rate simulator: analyse financial parameters from gross wages to setting your cost-plus hourly rates.
  • Wall cross-section: examine the thermal performance of a wall or roof assembly with U-value calculation, phase shift, and condensation analysis via the Glaser diagram.

What stays with you: confidentiality and the FADP

Managing sensitive data is a priority for construction companies. Architect drawings, price lists, and tenders contain commercial and technical information specific to your contracts.

In the free version, the application runs entirely within your browser's memory. No files, plans, or financial data are sent to an external server. The text of your quotes and the measurements on your plans remain on your machine throughout the calculation session.

This absence of remote processing prevents your data from being hosted by third parties, complying with the requirements of the Federal Act on Data Protection (nLPD) regarding the protection of personal and business data. There is only one technical exception: the Geo-Scanner module, which queries swisstopo public services to display the official topography and geographic data of the requested parcel.

The free version has no session memory. As soon as you close or refresh your browser tab, all data is erased and reset to zero. You must export your work to your computer before leaving the page.

From the free trial to the full software

The free tools allow you to address an urgent construction site need or verify an isolated calculation. However, they have usage limitations for the ongoing management of a general contractor or trade contractor: they serve as decision-making aids and replace neither professional engineering advice nor official documents from clients.

Furthermore, the free version does not include any rates or price data from the ACIP database. You must enter your own figures manually for each calculation.

To overcome these limitations, Art Construction provides a transition to comprehensive modules:

  • Centralised cloud backup for each construction site, with revision tracking.
  • Ability to reload a project to continue pricing or incorporate construction site addenda.
  • Automated cost estimation incorporating the ACIP price database.
  • Team mode for collaborative work between the technical office and site management.
  • Unwatermarked exports customised with your company's branding.

These advanced features are available through the software applications Soumissions, Plans Pro, the Portail, and the ERP from Art Construction, an independent developer not affiliated with SIA, CRB, or CFST.

How to choose your first studio

To start effectively, identify the task blocking your schedule today. The costly mistake on the ground is often the same: quantity surveyors are frequently seen transferring areas measured on a desk corner into a spreadsheet, then into a tender, creating quantity discrepancies unnoticed before final invoicing. The habit that prevents this error involves opening the PDF plan in the take-off studio, tracing areas precisely on the document, and exporting the summary directly before comparing it with the quote.

If you receive a call for tenders in the standard exchange format, use the SIA 451 file reader to detect missing unit prices. If you are preparing the start of earthworks, launch Geo-Scanner to check the natural slope or the site logistics studio to review crane positioning.

Test the tool suited to your immediate need, with no commitment. Simply remember to download your summaries at the end of each work session to keep your calculations.

Frequently asked questions

Does using the free studios require creating an account?

No. The tools are accessible directly in your web browser without registration, email address, or user profile creation. You load your working document and immediately start measuring, reading, or checking your construction site elements.

Are my plans and tenders sent to a remote server?

No. Calculations and rendering run entirely on your own computer within the browser. No documents are transferred to our servers. The only exception is Geo-Scanner, which sends the necessary queries to swisstopo public services to retrieve land data.

What happens if I accidentally close my browser tab?

The free version has no memory. If you close or reload the page, all entered data and measurements are reset to zero. You must export your results to your hard drive before ending your session.

Is the ACIP price database included in the free versions?

No. The free studios do not contain any price database or pre-established price scale. You must work solely with your own figures and input unit costs yourself when estimating your construction works.

Is Art Construction affiliated with building industry bodies such as SIA or CRB?

No. Art Construction is an independent company, separate from SIA, CRB, and CFST. The studios support standard industry formats such as SIA 451 files, but they are not official tools issued by these organisations.

Do the results replace engineering studies?

No. The calculations provided by the online studios, such as thermal evaluation or volumes, serve as decision aids for your contractor estimates. They do not replace technical engineering assessments, formal surveys, or official contract documents.

What are the advantages of paid versions such as Plans Pro or Soumissions?

The paid software allows you to save your projects to a construction site, keep a version history, use the ACIP price database, collaborate as a team, and generate unwatermarked document exports bearing your company branding.

Art Construction is independent of SIA, CRB and CFST. The results are decision support tools: they do not replace legal or fiduciary advice, nor verification by a professional.

No data is sent: your files remain in your browser's memory and disappear when the tab is closed.