Setting Up Your Simap Monitoring Profile: Noise-Free CPV and CFC Codes

Set up your Simap.ch monitoring without noise. Master CPV codes and CFC chapters to target your Swiss construction calls for tenders efficiently.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Risk of squandering between 15 000 CHF and 35 000 CHF per financial year in wasted wages and estimating hours on unsuitable notices. Poor targeting overburdens estimators with files outside their capabilities, degrading operational margin and the economic efficiency targeted under art. 2 LMP.
  2. Legal / Joint Body / SUVA: Risk of formal exclusion from the procurement procedure under art. 44 LMP for failing to meet suitability criteria. Inaccurate filtering frequently conceals mandatory requirements set out in art. 12 LMP concerning working conditions, compliance with collectively agreed wages, and the fight against illicit work.
  3. Administrative / Acceptance: Risk of irrevocable forfeiture upon publication of award decisions or missing the 20-day appeal deadline governed by art. 56 LMP. Clutter from useless notifications buries critical contract awards and jeopardises bid submission deadlines set by contracting authorities.

Early detection of public procurement opportunities on the official Simap.ch platform is a strategic competitive driver for building contractors and estimators in French-speaking Switzerland. Yet too many firms face a daily overflow in their inboxes: dozens of notices completely unrelated to their specific trades clog estimators' workdays and tie up skilled staff needlessly. This informational clutter stems from a poor alignment between the international CPV code classification required at publication and the Swiss technical organisation of quotes by CFC chapters established by the CRB.

Building a razor-sharp monitoring profile requires a rigorous method that links search syntax, cantonal geographic filters, and procurement rules defined by the Federal Act on Public Procurement (LMP). By weeding out irrelevant notices right from the account setup stage, the bidder ensures they capture relevant contracts launched under the open procedure pursuant to art. 18 LMP or the selective procedure pursuant to art. 19 LMP. This saves valuable time for analysing award criteria, refining price calculations, and showcasing technical expertise during tender submission.

Filtering methodology and alignment between CPV codes and CFC chapters

The official Swiss public procurement platform Simap.ch is structurally built around the Common Procurement Vocabulary, known by the acronym CPV. This eight-digit European classification system, adopted by the Confederation and the cantons that are signatories to public procurement agreements, does not match the day-to-day technical organisation of building contractors in French-speaking Switzerland. In Switzerland, the breakdown of work packages, costing, and quotation have historically relied on the Construction Cost Code (CFC) developed by the Swiss Research Centre for Building Rationalisation (CRB). For a technical office or executive team, strategic monitoring therefore requires rigorously mapping each targeted CFC chapter to specific clusters of CPV codes, while disabling generic top-level categories that generate an overwhelming volume of alerts unrelated to your actual operations.

Under the LMP, contracting authorities preparing a call for tenders often choose an overly broad main CPV code for administrative convenience. Using the root code for construction work is the primary cause of cluttered monitoring profiles. If an estimator enables this top level without restrictive filters, they will indiscriminately receive motorway earthworks, engineering structure refurbishments, or specialised finishing work. To eliminate this digital noise, configuring your alert profile on Simap.ch must combine three simultaneous filters: fine-grained CPV trees at levels 4 or 5 (classes and categories), Boolean keyword filters patterned after standard articles catalogue (CAN) terminology, and a geographic selection aligned with your firm's profitable operating radius.

Configuration must also factor in the legal nature of the procedures. The LMP defines competitive bidding procedures: art. 18 LMP governs the open procedure, where the contracting authority issues a public call for tenders and any tenderer can submit a bid. Meanwhile, art. 19 LMP regulates the selective procedure, which consists of a public call for tenders with an initial request to participate; the contracting authority then selects the tenderers permitted to submit a bid based on their suitability, allowing at least three where possible under paragraph 3. An effective monitoring profile isolates both of these public notice types while screening out prior information notices or corrigenda that have no direct bearing on the initial tender submission phase.

Operational CPV to CFC Mapping Matrix

The table below summarises the recommended mappings for the main structural work and finishing work trades in French-speaking Switzerland, highlighting common sources of noise and the appropriate exclusion rule.

Trade and CFC chapter Relevant CPV codes Frequent sources of search noise Recommended filtering rule
CFC 211: Masonry, reinforced concrete, and structural work 45262310-7 (Reinforced-concrete work), 45262520-2 (Masonry work) Heavy civil engineering notices, asphalt surfacing works, railway tracks Exclude CPV 45230000 (Pipelaying and cabling) and the term "bituminous"
CFC 214: Scaffolding and shoring 45262100-8 (Scaffolding work), 45262110-1 (Erection) Facade cleaning services using boom lifts without fixed erection Mandatorily pair the term "scaffolding" with CPV 45262100-8
CFC 221: Windows and lightweight facades 45421110-8 (Installation of doors and windows), 45441000-4 (Glazing work) Supply-only contracts for automotive glass, industrial hardware Exclude supply-only codes and require the phrase "on-site installation"
CFC 271: Plasterwork, drywall, and suspended ceilings 45410000-4 (Plastering work), 45421146-9 (Suspended ceilings) Mixed contracts for industrial painting or building service overhaul Link CPV 45410000-4 with the keywords "drywall" and "render"
CFC 281: Interior Joinery and fixtures 45421000-4 (Joinery work), 45421150-0 (Fit-out work) Catalogue purchases of office furniture, school supplies Exclude CPV group 39100000 (Furniture) to retain installation works
CFC 224: Waterproofing and flat roofs 45261410-1 (Roof insulation work), 45261420-4 (Waterproofing work) Heating pipe insulation and HVAC thermal lag work Exclude plumbing codes and require the terms "roof" or "bitumen"

Common configuration errors and financial impacts on the firm

Reviewing monitoring practices across trade SMEs and Swiss general contractors highlights four recurrent pitfalls when managing Simap.ch alerts:

The first mistake is relying exclusively on text keywords without selecting CPV codes. The platform's search engine then scans the entire notice body, including standard administrative clauses on occupational health and safety or environmental protection. For example, an electrical contractor searching for "cabinet" will get hundreds of tenders for office furniture, while a mason searching for "concrete" receives alerts for road drain maintenance contracts. This misstep costs an estimator around 45 minutes every day in manual sorting, representing an estimated loss of 18 500,00 CHF to 24 000,00 CHF per year in non-productive working hours, including 8,1 % VAT.

The second common mistake is selecting an overly narrow cantonal perimeter. Many companies in Western Switzerland restrict their search to their home canton (such as Vaud or Fribourg), overlooking the fact that major infrastructure construction sites or institutional buildings along cantonal borders often fall under federal procurement via the Federal Office for Buildings and Logistics (OFCL) or the Federal Roads Office (OFROU). These notices fall under the federal geographic category on Simap.ch and will not show up if your filter is tied to a single cantonal code. The firm consequently misses major calls for tenders available under the open procedure pursuant to art. 18 LMP.

The third shortcoming is omitting negative filters (NOT operators). When a contracting authority tenders a school complex as separate lots, it frequently bundles multiple CFC chapters under a single global notice carrying multiple CPV codes. Without precise exclusion rules for trades not handled in-house, your firm receives dozens of unusable tender packages. Performing a detailed review of an unsuitable file before discarding it costs roughly 650,00 CHF to 1 400,00 CHF per occurrence in preliminary technical assessment time.

Finally, the fourth error is failing to verify regularly the participation criteria set out in art. 12 LMP. This provision conditions any award for services performed in Switzerland on strict compliance with worker protection rules, working conditions in force at the place of performance, LTN notification and authorisation duties, and equal pay. Setting up search alerts without first verifying your ability to furnish the required local joint certificates risks building bids doomed to formal exclusion under art. 44 LMP.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and scenarios outlined below are illustrative examples designed to analyse how to optimise a monitoring profile on Simap.ch.

First scenario: a structural work and masonry contractor (CFC 211) employing 24 staff in the canton of Vaud. Previously, its alert profile relied on the generic code 45000000-7 and the keyword "masonry". The estimator received roughly 40 notifications per week, of which only two matched the firm's production capabilities. After reconfiguration, the profile was focused on CPV codes 45262310-7 (reinforced concrete) and 45262520-2 (masonry), combined with cantonal filters for Vaud, Geneva, and Fribourg, while excluding the term "civil engineering". The alert flow dropped to 5 notices per week, every one of them actionable. This streamlining freed up 6 hours of estimating time weekly, yielding measured operational savings of around 21 800,00 CHF over a twelve-month financial year, including 8,1 % VAT.

Second scenario: an Interior Joinery and fit-out firm (CFC 281) with 14 employees located in the canton of Valais. Its historical alert generated substantial noise due to notices for hospital or school furniture procurement. By integrating the exact CPV codes for joinery work (45421000-4) and strictly excluding CPV group 39100000 for furniture supplies, the company immediately neutralised useless alerts. At the same time, it extended its geographic scope to include federal contract awards across French-speaking Switzerland. Two months after this adjustment, the firm picked up an open procedure under art. 18 LMP for the interior refurbishment of a federal administrative building valued at an estimated 485 000,00 CHF incl. VAT, allowing it to submit a compliant tender well within deadlines.

Calls for tenders: free tools

Direct public procurement tenders, AIMP thresholds by canton, converting SIA 451 to Excel, quantity takeoff from an IFC model.

View tendering tools

Frequently asked questions

Why do CPV codes generate so many irrelevant alerts on Simap?

The European CPV system often misclassifies specialised Swiss construction works. An overly broad profile for an Interior Joinery package of around 180 000,00 CHF incl. VAT (including 8,1 % VAT) will catch office furniture. The LMP mandates transparency, but each contracting authority selects its descriptors freely.

How do you filter calls for tenders using Swiss threshold values?

Set up your filters under art. 16 LMP to target open or selective procedures. For a structural work contract estimated for illustrative purposes in the region of 4 500 000,00 CHF incl. VAT (8,1 % VAT included), this configuration filters out irrelevant notices and isolates projects subject to federal rules.

Can you set up a Simap search alert directly by CFC chapter?

Simap does not natively index CRB CFC codes. To track a CFC 241 lot in the region of 260 000,00 CHF incl. VAT (8,1 % VAT included), combine art. 18 LMP under an open procedure with strict title keywords, supplemented by the CPV code corresponding to electrical installations.

What should you do if a tender notice contains a CPV code error?

If the contracting authority entered the wrong category for a ventilation contract in the region of 320 000,00 CHF incl. VAT (8,1 % VAT included), submit an anonymous question. Pursuant to art. 11 LMP governing impartiality, the authority may publish a corrigendum without compromising equal treatment of bidders.

What is the ideal frequency for receiving search alerts?

Opt for a daily email notification. When facing tight submission deadlines for plastering work in the region of 95 000,00 CHF incl. VAT (8,1 % VAT included), prompt monitoring gives you time to examine the file under standard SIA 118 and anticipate access requests without undue rush.

Why cross-reference award criteria right from the search setup?

Advanced configuration lets you isolate the most relevant contracts. Under art. 29 LMP, the contracting authority assesses cost-effectiveness and sustainable development. For roofing work in the region of 410 000,00 CHF incl. VAT (8,1 % VAT included), spotting these criteria early steers your technical proposal directly against the competition.

Thorough, precisely configured monitoring on Simap protects your technical office from information overload and ensures proactive detection of profitable public procurement contracts in French-speaking Switzerland. To master every key stage of your tender submissions and strengthen your response strategy, consult our practical guides: