Practical guide

Permis L (Short-Term) vs Permis B (Residence): Swiss Rules and Changing Employer

Key differences between L and B permits in Swiss construction: granting rules, employer procedures, and job changes under the LEI.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Unexpected termination of an employment contract due to an unvalidated residence permit, leading to an operating loss in the range of 10 000 CHF to 25 000 CHF per unfilled site manager or bricklayer post under art. 319 CO.
  2. Legal / Joint body / SUVA: Employing a foreign worker before the residence permit is issued or without the appropriate authorisation, punished by custodial sentences or monetary penalties under art. 117 LEI during joint-body and cantonal inspections.
  3. Administrative / Handover: Blocked access to construction sites subject to electronic access control, rejected company badges, and administrative delays when filing with the cantonal population office pursuant to the LEI.

In Swiss construction, recruiting a resident worker requires identifying their residency status clearly between a short-term permis L and a permis B residence permit. Under art. 11 LEI, any foreign national pursuing gainful employment must hold prior authorisation requested by the firm, whether for temporary assignments or permanent hiring of site workers or technical managers.

This distinction governs contractual changes: a permis L frequently ties residency to a fixed-term contract, whereas a permis B grants greater occupational mobility across the Swiss market. To safeguard hirings and comply with the wage levels mandated by art. 322 CO and extended collective agreements, contractors and candidates alike must master the rules for permit transfers between French-speaking cantons.

Grant criteria and legal distinction between permis L and permis B

Choosing between a short-term permit (permis L) and a residence permit (permis B) depends on the planned duration of employment and the type of individual employment contract within the meaning of art. 319 CO. Under art. 11 LEI, any gainful activity pursued in Switzerland by a foreign worker requires an authorisation filed by the employer with the competent cantonal service. When the engagement involves a temporary assignment of less than one year, the authorities issue a short-term permit. If the contract is signed for an open-ended duration or at least one year, the employee may qualify for a permis B provided the admission criteria of art. 18 LEI are met.

In building trades subject to national worker priority, art. 21a LEI requires advertising vacancies to the public employment service whenever unemployment is above average. Intentionally failing to complete this step exposes the firm to sanctions under art. 117a LEI. Furthermore, under art. 322 CO, the employer pays the worker the agreed, standard, or collective-agreement wage in force.

Comparative table: Permis L vs Permis B in the construction sector

Administrative criterionPermis L (Short-term)Permis B (Resident)
Validity periodLimited to contract duration (up to 364 days).Five years for the EU/EFTA area or renewable annually.
Contract typeFixed-term or temporary assignment (art. 319 CO).Open-ended or exceeding one year (art. 319 CO).
Changing employerPrior authorisation required before starting any new position.Free occupational mobility for EU/EFTA nationals.
Authorisation applicationProcedure initiated by the employer under art. 11 LEI.File submitted by the employer or simple notification (art. 11 LEI).
Tax residenceSubject to withholding tax at source.Taxed at source tied to the cantonal tax scale.

Rules on changing employer and common HR management pitfalls

Occupational mobility between construction firms depends on initial status. For an EU/EFTA national holding a permis B, changing employers is fully unhindered, provided the change is reported to the municipal or cantonal authority of residence when signing the contract under art. 319 CO.

For a permis L holder, the permit remains linked to the approved assignment. Having a worker work for a new employer without prior cantonal approval violates art. 11 LEI. Under art. 117 LEI, anyone who intentionally employs a foreign national without authorisation faces a custodial sentence of up to one year or a monetary penalty, and a fine of up to 20 000 francs in cases of negligence.

A recurring pitfall is starting work before the cantonal granting decision is issued. This haste triggers work stoppages on the construction site, representing an indicative operating cost of roughly 4 000 CHF to 12 000 CHF per week of suspension.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following scenarios and figures are illustrative examples designed to clarify recruitment procedures on Swiss construction sites.

Scenario 1: Earthmoving construction site in the Canton of Vaud

A Vaud contractor recruits an equipment operator for an eight-month assignment on a civil engineering construction site with 14 employees. The employer enters into a fixed-term contract under art. 319 CO and applies for a permis L with the Vaud population office under art. 11 LEI, while complying with the customary wage set out in art. 322 CO. In the eighth month, the firm turns the contract into an open-ended one, allowing it to obtain a permis B to secure this skilled post permanently.

Scenario 2: Foreperson mobility in the Canton of Geneva

A Geneva structural work contractor hires a foreperson holding an active EU/EFTA permis B who works for a competitor. The individual employment contract is concluded under art. 319 CO. Under free mobility, the worker maintains their residence rights and files a notification of change with the Geneva Cantonal Population and Migration Office, preventing any interruption of work and eliminating any risk of violation under art. 117 LEI.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

How do you convert a permis L to a permis B?

By signing an open-ended contract under art. 319 CO, the employer applies to the competent cantonal service for the issuance of a B permit under art. 11 LEI.

Does a permis B allow you to change employers?

An EU worker holding a permis B may freely change employers. They must notify their municipality of their new position and observe the notice periods set out in art. 335c CO.

What penalties apply to unauthorised hiring?

Art. 117 LEI punishes employing unauthorised foreign nationals with a custodial sentence of up to one year or a monetary penalty, reinforced by art. 6 LTN.

What wage must be declared for a foreign fitter?

Pursuant to art. 322 CO, the employer applies the agreed remuneration. For guidance only, a gross monthly wage of around 5 500 CHF is standard on construction sites.

Does a permis L allow you to rent accommodation?

Yes, a worker holding a permis L can rent accommodation. Rental agencies require proof of the employment contract governed by art. 319 CO as well as financial guarantees.

Does a probationary period apply to a contract renewal?

Art. 335b CO caps the initial probationary period at a maximum of three months. Renewing a contract with the same employer excludes any new probationary period.

Consult our reference guides for your administrative procedures in Switzerland: