The 3 Major Site Risks
- Financial / Margin: Risk of wage dispute in the region of 4 000 CHF in the event of an erroneous payroll calculation, in contradiction with the individual employment contract under art. 319 CO.
- Legal / Joint Body / SUVA: Criminal penalty or fine under art. 117 LEI for employment without authorisation during an inspection by the competent body under the Federal Act on Combating Undeclared Work.
- Administrative / Handover: Site access refused by site management and mission interrupted due to lack of declaration compliant with the Federal Act on Foreign Nationals and Integration.
The online notification procedure with the State Secretariat for Migration allows European nationals to pursue gainful employment in Switzerland for up to ninety days per calendar year without an ordinary residence permit. This fast-track mechanism meets the specific needs of general contractors and tradespeople in French-speaking Switzerland who recruit skilled labourers, technicians, or site foremen for temporary reinforcements.
The procedure must imperatively be carried out by the employer before work commences, in accordance with art. 11 LEI. This guide details the calculation of the quota, the minimum wages under extended collective agreements, and the formalities required to work fully legally on Swiss construction sites.
Application criteria and operation of the ninety-day quota
Notification to the State Secretariat for Migration concerns the exercise of salaried gainful employment for a maximum duration of ninety effective calendar days per calendar year. This system applies to workers who are nationals of European Union or European Free Trade Association countries hired by a company established in Switzerland. Under art. 11 LEI, any foreign national intending to carry out gainful employment in Switzerland must hold an authorisation, regardless of the duration of their stay. For salaried employment, the procedure is the sole responsibility of the employer, who submits the declaration before services begin.
The ceiling is calculated based on effective working days declared and validated by the authority. Intermittent employment, such as three days per week or split assignments, consumes only the specific dates stated during notification. As soon as the threshold of ninety calendar days is reached within the same calendar year for the same worker or by the same company for posted personnel, this simplified mechanism can no longer be renewed. The employer must then apply for an ordinary short-term or residence permit under the regime of the Federal Act on Foreign Nationals and Integration.
Legal obligations of the employer and extended collective agreements
Employing a team member under the online notification system requires strict compliance with Swiss labour standards from the very first hour. The individual employment contract obliges the worker to perform their duties and the employer to pay the agreed wage, pursuant to art. 319 CO. Furthermore, the employer must pay the agreed, customary, or standard contract- or collective agreement-stipulated wage, under art. 322 CO. In finishing work and structural work, extended collective agreements establish mandatory wage scales and compulsory professional contributions.
Working hours are governed by the Labour Act. Art. 9 LTr limits the working week to 45 hours for technical or workshop staff and to 50 hours for other categories of workers. Rest breaks are governed by art. 15 LTr, requiring at least fifteen minutes if the working day exceeds five and a half hours, half an hour beyond seven hours, and one hour beyond nine hours. The employer must also maintain working time control records prescribed by art. 73 OLT 1, documents which state in particular the identity of the worker as well as the daily and weekly duration of work performed.
Comparison of procedures according to hiring status
| Evaluation criterion | Notification procedure (90 days) | Short-stay permit L | Cross-border commuter permit G | EU posted worker |
|---|---|---|---|---|
| Maximum authorised duration | Ninety days per calendar year | Up to 364 consecutive days | Five years (renewable) | Ninety days per calendar year |
| Party submitting the application | Swiss employer online | Employer with the canton | Employer or worker | Foreign company (art. 6 LDét) |
| Statutory processing time | Effective upon validation | Several weeks of assessment | Prior cantonal assessment | Eight-day waiting period |
| Social insurance administration | Affiliation to AVS, LAA in Switzerland | Full affiliation in Switzerland | Swiss unemployment insurance and AVS | Home-country social security maintained |
| Wage compliance monitoring | Extended CLA and art. 322 CO | Cantonal scales and CLA | Local industry scales | Net minimum wage (art. 8a ODét) |
Frequent mistakes and financial impacts on construction sites
A common mistake is allowing the worker to start on site before receiving formal confirmation of submission of the application. Any work commenced without valid status exposes the firm to prosecution by the cantonal inspection body acting under the Federal Act on Combating Undeclared Work. Art. 117 LEI punishes the employment of foreign nationals without an authorisation with a custodial sentence of up to one year or a monetary penalty for intentional offences, and with a fine of up to 20 000 francs for negligence.
Another shortfall involves underestimating the contractual gross wage. If the joint body identifies a discrepancy compared with the extended collective agreement, the wage back-payment can amount to around 3 000 CHF to 6 000 CHF per worker for just a few weeks on site, over and above administrative audit fees stipulated by industry regulations.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and situations below are illustrative examples intended to guide administrative management decisions in construction firms.
Scenario 1: Masonry reinforcement on a residential development in Lausanne (Vaud)
A general contractor involved in structural work must bring in two skilled shuttering masons for a critical six-week slab-pouring phase. The workforce is hired from neighbouring France. The employer chooses the ninety-day notification procedure via the federal portal, declaring thirty working days per worker. This approach enables rapid integration while complying with art. 319 CO regarding employment contracts and minimum wages under the National Collective Agreement for the Main Construction Trade.
Scenario 2: Specialist installation of exterior joinery in Carouge (Geneva)
A carpentry workshop hires a specialist site foreman to adjust complex glazed facades over forty-five calendar days. The firm uses the online procedure to validate the salaried employment. It meticulously records working hours in compliance with art. 73 OLT 1. Site management checks the notification confirmation during access control on the construction site, avoiding any work stoppage.
Wages and social charges: free tools
Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.
Frequently asked questions
What waiting period must be observed before an assignment begins?
Under art. 6 LDét, work begins eight days after written notification. An indicative gross salary in the region of 5600 CHF remains subject to official checks.
What penalty applies if an assignment is not notified?
Art. 9 LDét provides for an administrative fine of up to 5000 francs for failure to notify. The employer risks illustrative financial penalties in the region of 4000 CHF depending on the circumstances.
Who checks the accuracy of notifications on a construction site?
Under art. 6 LTN, the cantonal authority verifies compliance with notification and authorisation obligations. It examines illustrative pay slips in the region of 6100 CHF per month.
Is cross-border staff leasing permitted?
Art. 12 LSE prohibits staff leasing into Switzerland of personnel recruited abroad. Art. 39 LSE provides for fines, even at an indicative rate in the region of 75 CHF per hour.
How is the 90-day ceiling calculated?
Under the LEI, the maximum authorised duration of activity is 90 days per calendar year. For remuneration in the region of 18000 CHF, a work permit becomes mandatory beyond this limit.
Is the contracting builder liable for the subcontractor's wages?
Art. 5 LDét states that the contracting builder is civilly liable for the minimum wages of subcontractors. Any dispute involving an illustrative salary in the region of 5800 CHF triggers their duty of due diligence.
To explore your administrative procedures in greater depth, browse our detailed guides:
- Swiss Work Permits (G, B, L), Cross-Border Commuter Status, Withholding Tax and LAMal: 2026 Construction Guide
- Securing a Cross-Border Permit G in Construction: Conditions, Weekly Return and Cantonal Procedures
- L Permit (Short-term) vs B Permit (Residence): Eligibility Rules and Changing Employers in Switzerland
- Withholding Tax in Romandy (VD, GE, VS, FR, NE, JU, BE): Understanding Tariffs A, B, C and H