Skip to content
Candidates
Jobs
Employers
Companies
Pricing
Change language: French
Practical guide

Withholding Tax in French-Speaking Switzerland (VD, GE, VS, FR, NE, JU, BE): Understanding Tariffs A, B, C and H

Swiss Romandie withholding tax guide for construction (VD, GE, VS, FR, NE, JU, BE): tariffs A, B, C, H, compliant wages and tax deductions.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: An incorrect tariff applied to the payslip results in retroactive tax arrears of several thousand CHF to be settled, conflicting with the agreed wage under art. 322 CO.
  2. Legal / Joint Body / SUVA: Failure to comply with tax statements exposes the employer during cantonal control body audits under art. 6 LTN, which verifies withholding tax and compliance with declared generally binding collective agreements.
  3. Administrative / Acceptance: A tax declaration error blocks the issuance of the company's certificate of social and tax compliance, delaying administrative approval of tender files with the site management.

In the construction sector in French-speaking Switzerland, the accurate deduction of tax at source is a key issue for the payroll of resident and cross-border employees. Tariffs A, B, C and H determine the monthly percentage deducted based on marital status, the number of dependent children and the spouse's income.

This guide sets out the tax liability rules applicable in the cantons of Vaud, Geneva, Valais, Fribourg, Neuchâtel, Jura and Bern. It provides both applicants and construction employers with the benchmarks needed to prevent tax errors and secure every payroll statement.

Allocation criteria for tax tariffs A, B, C and H in French-speaking Switzerland

Withholding tax deductions are based on the worker's personal and family circumstances on the first day of the relevant month. Under art. 322 CO, the employer pays the agreed wage, deducting mandatory withholdings. Art. 8a ODét also specifies that the net minimum wage is determined after deducting amounts paid for social security and withholding taxes. To establish the exact tax rate, cantonal tax authorities apply four core tariffs codified according to household composition:

  • Tariff A: Single, divorced, legally or factually separated employees, as well as widowed individuals, with no children or dependents living in the household.
  • Tariff B: Married couples living in the same household where only one spouse is gainfully employed or self-employed.
  • Tariff C: Married couples living in the same household where both spouses are gainfully employed, whether in Switzerland or abroad.
  • Tariff H: Single, widowed, divorced or separated employees who single-handedly support minor children or adult children in education within their household (single-parent families).

Comparison table of tax tariffs by family status

Each tariff is modulated by a number corresponding to the number of dependent children (for example A0, B2 or C1). Verification obligations fall on the employer pursuant to art. 6 LTN with regard to withholding tax.

Tariff Employee marital status Spouse's activity Dependent children Construction site checkpoint
Tariff A0 Single, divorced, separated Not applicable 0 Standard rate applied by default upon hiring without proof of civil status.
Tariff B (B1 to B4) Married in common household No gainful income 1 to 4 children Requires an annual certificate proving that the spouse has no gainful employment.
Tariff C (C0 to C3) Married in common household Active gainful employment 0 to 3 children Rate adjusted to account for the theoretical combined income of both household earners.
Tariff H (H1 to H3) Single parent (widowed, divorced) Not applicable (sole parent) 1 to 3 children Requires proof of primary custody and receipt of family allowances.
Tariff G Resident with replacement income Variable depending on file Variable Applied to daily allowances paid out directly without going through the employer.

Cantonal specificities and common tax assessment errors

In French-speaking Switzerland, two regimes coexist for cross-border commuters. The cantons of Vaud, Valais, Fribourg, Neuchâtel, Jura and Bern apply the 1983 Franco-Swiss agreement: income tax is collected by France, with financial compensation returned to the cantons, with exceptions for weekly boarders. In Geneva, the 1973 tax agreement mandates direct withholding tax deductions from Swiss gross pay, regardless of the cross-border place of residence.

The most frequent mistake in finishing work is keeping a married worker under tariff B after their spouse resumes part-time work. This oversight leads to retroactive cantonal tax adjustments, often ranging from 3'000 CHF to 5'500 CHF for the calendar year. Similarly, failing to promptly submit a divorce decree leaves an incorrect rate in place, exposing the company to burdensome accounting corrections during the annual closing of wage certificates.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and situations presented below are illustrative examples designed to clarify withholding tax mechanisms.

Scenario 1: Formwork shutterer in the canton of Vaud

In a structural work company employing twenty workers, a mason holding a cross-border commuter permit resides in neighbouring France. Married with two children, his wife has no professional activity. The firm applies the Vaud cantonal tax agreement: the employee is not taxed at source on his gross monthly wage of 5'800 CHF, subject to providing an annual tax residency certificate. Without this document, the default B2 tariff should be applied temporarily.

Scenario 2: Crane operator assigned to a construction site in Geneva

A general contractor working on a multi-family housing project hires a married crane operator with one child, whose wife works in France. With the construction site located in the canton of Geneva, tariff C1 must be applied to his gross pay of 6'400 CHF. Mistakenly applying tariff B1 would have led to an under-deduction of around 450 CHF per month, subsequently recovered during the corrective tax return.

Wages and social charges: free tools

Real cost of a tradesperson, employer contributions by canton, meal and travel allowances, notice periods under the collective agreement.

View payroll and HR tools

Frequently asked questions

Which tariff applies to a single mason without children in Valais?

Tariff A applies by default to single individuals. On an illustrative gross wage of 5 800 CHF, direct tax deduction is carried out according to Valais cantonal tax law.

How do you correct an incorrect tariff applied by the construction company?

The worker must report any change in civil status to their employer. Under art. 322 CO, paying the agreed wage requires a correction with the cantonal tax authority.

Does a G-permit cross-border worker in Geneva depend on the Geneva tariff?

Yes, Geneva levies withholding tax on construction earnings. Under art. 11 LEI, authorised gainful employment requires tax deduction under the prevailing cantonal tariff.

Can a painter under tariff C request an adjustment?

Yes, tariff C for dual-income couples allows for a subsequent ordinary assessment request with cantonal tax authorities if actual deductions alter the wage withholding under cantonal law.

Who checks withholding tax compliance on the construction site?

Under art. 6 LTN, the cantonal inspection body verifies compliance with notification and conformity duties regarding social insurances, work permits and withholding tax.

How do you declare a dependent child to benefit from tariff H?

The worker submits the birth certificate to their construction employer. This enables the adjustment of the single-parent tariff applied to their monthly salary set under art. 319 CO.

Proper mastery of tariffs A, B, C and H ensures accurate payroll on construction sites in French-speaking Switzerland. To explore your administrative procedures in depth, consult our specialist guides:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.