Why a misread alteration drawing is costly on site
The authority wants to know what changes compared with the existing building. The bricklayer wants to know what is being demolished and what is being built. The joiner wants to know which openings are new. If the drawing does not clearly distinguish these three states, the question comes back by phone, and the wrong answer ends up on site.
The SIA 400 standard serves as the reference for the presentation of drawings in Switzerland. In alterations, the most widespread convention distinguishes the existing retained (grey or black), what is demolished (yellow) and what is built (red). The legend, the level of detail and the requirements nevertheless vary between cantons, municipalities and commissions: they should be checked with the authority and with the author of the project.
- The existing state retained.
- The elements to be demolished.
- The elements to be built.
- A legend written on every drawing.
- A scale suited to the use and a revision index.
What Plans Pro produces for a set of alteration drawings
Plans Pro does not colour a drawing for you: it produces the basic documents, which you complete according to the convention of your office or of the authority.
One plan per level
The plan of each level comes out with a Swiss title block, from the walls, slabs, doors and windows that you have drawn in 3D.
Sections and elevations
Sections and elevations complete the plans: heights, levels and openings are readable on them, for the planning application as for tenders.
Formats and exports
Drawings are prepared from A0 to A4, with export to PDF for circulation and to DXF for a colleague, reserved for subscribers.
Version comparison
When the project evolves, comparing two versions of a plan helps to spot what has changed between two revisions.
To these are added the SIA 416 area schedule, calculated from the model, and the opening of IFC models (versions 2x3, 4 and 4.3) received from another office.
Three steps to a readable set of drawings
The set is built in the order in which it will be read: the existing, the project, then circulation.
Step 1: set down the existing state
Draw the building as it is: walls, slabs, doors and windows, level by level. Note the date and source of the measurements, because the whole file rests on this starting state.
Step 2: design and distinguish the states
Draw the project, then distinguish existing, demolition and new according to the chosen convention, with a legend on each drawing: this representation work remains yours. For the scale, see the scales guide.
Step 3: export, compare and circulate
Export to PDF for the authority, the building owner and the trades, and to DXF for a colleague. At each change, update the revision index and compare the two versions before sending.
Drawings redone by hand or a prepared set of drawings: what changes
The table compares two ways of preparing a set of drawings: sketches, annotated PDFs and a spreadsheet on one side, targeted plan software on the other. For a small site, the first may be enough; it becomes heavy when the revisions follow one another.
| Need of the set of drawings | Sketches, annotated PDFs and spreadsheet | Art Construction Plans Pro |
|---|---|---|
| Plan of each level | Redrawn or retouched by hand | Plans by level, Swiss title block, A0 to A4 |
| Sections and elevations | Often drawn separately | Sections and elevations produced with the plans |
| Existing, demolition, new | Convention applied by hand | Convention applied by you; no automatic yellow/red mode |
| Tracking revisions | Files renamed by hand | Comparison of two versions of a plan |
| Areas | Measured or calculated in a spreadsheet | SIA 416 schedule calculated from the model, Excel export |
| Exchange of models | Depends on the formats received | Opening of IFC 2x3, 4 and 4.3 models |
Non-exhaustive comparison of approaches. Representation requirements depend on the authority, the canton and the commission: check them before issuing a drawing.
14-day trial, plans and limits for your drawings
The trial lasts 14 days, with no card required: at the end, nothing is charged. A free limited version remains available with no time limit, but exports, and therefore the PDF and DXF of a set of drawings, are reserved for subscribers. For a person drawing alone, the Solo plan costs CHF 59 per month; a small office will choose the Office plan, at CHF 149 per month for up to 3 users; the Team plan, at CHF 399, goes up to 10 users. Prices excl. VAT. Before each issue, check these points:
- The legend and the revision index are up to date.
- The scales match the use of each drawing.
- The authority’s requirements have been reread.
- The project’s author has approved the set.
Frequently asked questions
Does Plans Pro apply the yellow and red code automatically?
No. The yellow/red code is a representation convention, a working method that the drawing’s legend explains. Plans Pro produces the plans of each level, the sections and the elevations; the distinction between existing, demolition and new remains your responsibility. Check the convention expected by the authority or the building owner before issuing the set.
Which drawings are needed for a planning application?
Requirements vary by canton and municipality: in general, plans of each level, sections and elevations, with a readable title block and suitable scales. The building authority gives the exact list. Plans Pro produces these types of drawings; it does not decide what the authority requires.
Can I take over a surveyor’s plan or a DWG file?
Plans Pro does not announce the import of DWG files or of surveyors’ DXF plans. You can, however, open IFC models (2x3, 4 and 4.3), in .ifc or .ifczip format, and export your plans to PDF and DXF. If your commission requires starting from a DWG file, check this point before subscribing.
How do I track changes to a plan between two issues?
Keep a revision index on each plan and keep the versions sent. Plans Pro lets you compare two versions of a plan to spot what has changed. The rigour of indices, dates and legends is a matter of your office’s method, not a software function.