Why tradespeople and renovation SMEs hesitate over CAD
In renovation, the plan is used at every stage: drawing of the existing building, preliminary design to show the building owner (client), planning application when one is needed, take-offs for the quotation, then plans that the trades must be able to read. Many small firms get by with sketches, a spreadsheet and PDFs received from the architect, because full CAD software demands a learning curve and a budget that are not always justified for a few plans a month.
The result is familiar: a plan redrawn at every change, areas recalculated by hand, quantities retyped into the quotation. Each re-keying is an opportunity for error.
- A readable plan for each level, with title block, to print or send as a PDF.
- Sections and elevations to explain the project to the client and the trades.
- Areas calculated from the model rather than measured by hand.
- Quantities that pass from the plan to the quotation without being retyped.
What Plans Pro brings to a renovation drawing
Plans Pro is used in the browser and its scope is deliberately focused on buildings: walls, slabs, doors, windows, plans, sections, elevations, areas and take-offs.
A 3D model of the building
You draw walls, slabs, doors and windows in 3D, then produce the plans of each level, the sections and the elevations with a Swiss title block, from A0 to A4.
Areas according to SIA 416
The SIA 416 area schedule is calculated from the model and exported to Excel, to feed a tender or an area check.
Take-offs on PDF plans
On a PDF plan, you set the scale then measure lengths, areas, volumes and walls, including gables, vaults, sloping ceilings and reveals, linked to ACIP items.
From plan to quotation
Quantities go in one click into a quotation in the Art Construction ERP. You can also compare two versions of a plan and open IFC models received from another office.
A BIM viewer and AI analysis of plans (paid accounts, page limit per month) complete the whole.
Three steps, from the first wall to the plan sent out
Start with a small renovation job that you know well and judge the tool on that real case: no learning time is promised.
Step 1: draw the building
Build up the walls, add slabs, doors and windows, level by level. For a first trial, a simple model is enough: one floor, a few openings.
Step 2: produce the plans and areas
Produce the plan of each level, the sections and the elevations, then the SIA 416 area schedule. Recheck the dimensions before sending anything: the plan is checked by its author.
Step 3: export and price
Hand the PDF to the client and the DXF to a colleague who takes the drawing over, pull the areas into Excel, then send the quantities into an ERP quotation. You decide the prices, discounts and margin.
General-purpose CAD or targeted plan software: what each brings
AutoCAD is a benchmark for technical drawing, and very comprehensive. Plans Pro is not an equivalent: it aims at a more focused use for buildings. The table compares two categories of approach, not two products; the functions of CAD software depend on the version and the plan, and should be checked with the vendor.
| Need of a renovation SME | General-purpose CAD (for example AutoCAD) | Art Construction Plans Pro |
|---|---|---|
| Scope of technical drawing | Very wide: many fields | Focused on buildings |
| Installation | Depends on the product and plan | In the browser, projects stored in Switzerland |
| Plans, sections and elevations | Depends on the product and setup | By level, Swiss title block A0 to A4 |
| SIA 416 areas | Depends on the product and modules | Schedule calculated from the model, Excel export |
| Quantities to the quotation | Check with the vendor | Sent in one click into an ERP quotation |
| DWG files | Common format in the category | PDF and DXF export; no DWG import announced |
AutoCAD is a trademark of its owner. Non-exhaustive comparison of categories of tools: check the current functions and prices with each vendor.
Limited version, 14-day trial, starting price and limits
Plans Pro offers a free limited version, with no time limit: it lets you draw and get familiar with the tool, but exports and imports are reserved for subscribers. The subscription can be tried for 14 days, with no card required: at the end, nothing is charged. Prices in CHF, excl. VAT.
- Solo, CHF 59 per month: 1 user.
- Office, CHF 149 per month: up to 3 users.
- Team, CHF 399 per month: up to 10 users.
Frequently asked questions
Do I need to know how to use CAD software to get started?
Not necessarily. Plans Pro targets buildings and opens in the browser, but you do need to be able to read a plan: levels, dimensions, scales. No learning time is promised. The surest way is to try the limited version or the 14-day trial on a small renovation project that you already know.
Does Plans Pro replace AutoCAD in my office?
No, and that is not its aim. AutoCAD is a benchmark for technical drawing, and very comprehensive; Plans Pro aims at a more focused use: model, plans, sections, elevations, SIA 416 areas and quantities for the quotation. If your commissions require the exchange of DWG files, check this point before subscribing.
What does the limited version allow, and what do I have to pay for?
The free limited version has no time limit and lets you draw. Exports and imports are reserved for subscribers, as is AI analysis of plans, limited in pages per month. The subscription starts at CHF 59 per month, excl. VAT, with a 14-day trial with no card required.
Can my areas and quantities go into my quotation?
The SIA 416 area schedule exports to Excel, and take-offs made on PDF plans are linked to ACIP items. The quantities can then be sent in one click into an ERP quotation. They still need checking: you decide the prices, the margin and what appears in the tender.
Going further
Software pages, tools to try and guides linked to this subject.