Table of contents
The 3 Major Site Risks
- Financial / Margin: Drafting revision costs and blocked professional fees in the range of 4 500 to 12 000 CHF when a CAMAC synthesis refusal requires a complete overhaul of the quote description under art. 364 CO.
- Legal / Joint Body / SUVA: Criminal penalty under art. 229 CP in case of deliberate failure to comply with recognized building practices during earthworks or failure to submit the advance pollutant declaration required by art. 16 OLED.
- Administrative / Approval: Rejection of the application by the Central Permitting Authority, leading to an assessment freeze of 60 to 180 days and the obligation to hold a new public inquiry under art. 22 LAT and art. 25a LAT.
Assembling a CAMAC dossier in the canton of Vaud requires rigorous coordination between plot boundaries, municipal regulations, and the requirements of specialised cantonal services. Intended for architects, architectural draftsmen, and civil engineering firms, this procedure demands comprehensive public inquiry drawings complying with the principles of the LATC and its implementing regulation. Accurate alignment of site cross-sections, roof envelopes, and official reference elevations directly determines whether the project is declared immediately admissible during cantonal digital submission.
Beyond the site plan prepared by a licensed surveyor, cantonal approval requires specific technical questionnaires covering areas such as water management, soil protection, and thermal energy balances. Any oversight on modified ground profiles or the construction waste disposal concept, governed by art. 16 OLED, leaves the project vulnerable to a formal request for additional details, bringing your project schedule to a halt well before the formal building permit is issued by the municipality.
Drafting requirements and drawing list for CAMAC processing
The coordinated assessment run by the Central Permitting Authority for building permits is grounded in the coordination principles set out in art. 25a LAT. Each cantonal technical agency evaluates project compliance according to its own jurisdiction. To ensure that your drawing package is accepted by both the municipality and Vaud cantonal authorities, technical drawings must satisfy standard industry best practices and the stipulations of the LATC.
Mandatory architectural and geometric drawings
The complete file submitted for public inquiry contains a specific set of documents drawn to standardised scales:
- Licensed surveyor's site plan: official cadastral extract at 1:500 or 1:1000 scale certified by a licensed surveyor, clearly detailing plot boundaries, the footprint of the new building, setbacks to property lines, municipal building alignments, and road access points.
- Floor plans for all levels: basements, ground floor, standard upper floors, attics, and roof at 1:100 scale. Each level indicates the precise designated use of every room, rough and finished dimensions, as well as openings required for natural light and ventilation.
- Key cross-sections: a minimum of two orthogonal cross-sections at 1:100 scale cutting through critical parts of the building. These sections must clearly display both the natural ground line and finished ground levels after construction, along with clear ceiling heights and total height to the ridge or eaves.
- Complete elevations: all facades at 1:100 scale accurately depicting door and window openings, specified cladding materials, metalwork elements, and the continuous ground line where the building meets existing and proposed ground levels.
- Pipework and drainage plan: schematic at 1:100 scale distinguishing between wastewater and storm run-off according to the municipal separate sewer principle, showing inspection chambers, oil separators, and outfalls.
Special questionnaires accompanying technical drawings
The technical drawings must be accompanied by sector-specific questionnaires. Under art. 16 OLED, the client must state in the building permit application the type, quality, and quantity of waste, as well as the planned disposal routes, whenever waste volumes are expected to exceed 200 m³ or whenever materials are likely to contain hazardous pollutants such as asbestos, PCBs, or lead. These technical details directly complement the existing conditions and demolition drawings.
Summary table of drafting requirements by cantonal authority
| Drawing document | Standard scale | Lead cantonal department | Critical geometric check | Associated questionnaire |
|---|---|---|---|---|
| Surveyor's site layout plan | 1:500 | Spatial Development Department | Boundary setbacks and access | General questionnaire |
| Terrain cross-sections | 1:100 | General Directorate for the Environment | Natural and finished ground profiles | Planning questionnaire |
| Roof plan | 1:100 | General Directorate for the Environment | Solar clearance profiles under art. 18a LAT | Energy questionnaire |
| Drainage flow diagram | 1:100 | Water Division of the DGE | Stormwater retention and connection to main sewer | Drainage questionnaire |
| Existing conditions survey | 1:100 | Waste and Polluted Sites Division | Demolition surface areas and hazardous pollutants | Waste and asbestos questionnaire |
Common drawing mistakes and financial repercussions
Delays in issuing building permits stem mostly from dimension discrepancies between trades. Contradictions between the absolute elevations on the surveyor's plan and relative levels marked by the draftsman trigger a formal request for corrections from the relevant authority. A discrepancy in drainage pipe alignments or a flawed ground cross-section will necessitate a new public inquiry notice at municipal level.
From a contractual perspective, the architect or draftsman remains liable for their deliverables under art. 364 CO. Additional drafting revisions, cantonal handling fees for amended dossiers, and extended financing costs regularly result in additional costs between 3 800 and 8 500 CHF for a detached home, and can exceed 15 000 CHF for a multi-family residential building.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and scenarios outlined below serve as practical illustrations reflecting how Vaud procedures operate on Swiss construction sites.
Representative scenario: Multi-family residential building in the district of Nyon
In the canton of Vaud, an architectural practice is compiling the building permit dossier for an eight-unit apartment building with an underground car park. The project team comprises an architect, two architectural draftsmen, and a civil engineer. The plot features a pronounced slope running down toward the south-east.
During municipal preliminary review, technical officers identified inaccuracies in the transitions to the natural ground level. The design team chose to commission the licensed surveyor to carry out a comprehensive elevation survey, allowing every architectural cross-section at 1:100 scale to be corrected and realigned. At the same time, the pollutant audit was documented in the waste questionnaire under art. 16 OLED for an excavated volume in excess of 200 m³. This strict compliance check secured the lifting of cantonal conditions without delaying the start of work on the construction site.
Surfaces, standards and permits: free tools
SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.
Frequently asked questions
When is a licensed surveyor's plan mandatory for CAMAC?
An official surveyor's plan is mandatory for any new building under the Law on Spatial Planning and Construction, preventing delays typically valued around 2500 CHF.
What volume threshold triggers the waste questionnaire in Vaud?
Under art. 16 OLED, the waste management form is mandatory from 200 m³ of excavated material. Any omission generates administrative delays and costs around 1800 CHF.
How does CAMAC coordinate assessments among cantonal departments?
Art. 25a LAT charges CAMAC with centralising preliminary notices to ensure coordinated review, heading off assessment hold-ups estimated at around 3200 CHF.
Does a rooftop solar installation require a full CAMAC application?
Art. 18a LAT and art. 32a OAT exempt compliant panels from permit requirements, requiring only prior notification and saving public inquiry fees around 1200 CHF.
What drawing rules apply to plans for the Water questionnaire?
Separate and combined sewer networks must be distinctly identified under cantonal drainage standards, preventing revision costs typically billed around 2100 CHF.
Does a change of use without physical alterations require a permit?
Art. 22 LAT requires any substantial change of use to obtain a formal building permit, heading off a legal refusal along with financial losses around 4000 CHF.
Meticulous compliance of your drawings and forms ensures seamless processing through cantonal review in Vaud. Take your projects further with our practical guides:
- Compiling a Public Inquiry and Building Permit File in Switzerland (CAMAC, APA, FRIAC, eConstruction)
- Building Permits in Geneva (Accelerated APA vs Standard DD): Preparing Drawings for OAC e-Démarches
- Digital Submission on eConstruction in Valais (Commune vs CCC): Required PDF/A Formats and Signatures
- Submitting a Building Permit on FRIAC (Fribourg) and eBau (Bern) Without Requests for Additional Documents
