Table of contents
The 3 Major Site Risks
- Financial / Margin: An incorrect opening direction leads to manufacturing unusable joinery. Replacing it cuts into the joiner's margin (an illustrative loss of around 20%), triggering liability under the Code of Obligations.
- Legal / Joint Body / SUVA: Omitting sill heights hides a fall hazard. An unnoted low sill prevents planning collective protection in advance, exposing workers to hazards addressed by the Construction Work Ordinance (OTConst).
- Administrative / Acceptance: Non-compliant symbols stall the public inquiry. The municipality demands revisions, delaying the building permit governed by the Federal Act on Spatial Planning (LAT).
Representing doors, windows, sills, and lintels on architectural plans in Switzerland follows the rules of SIA 400. For architects and draftspersons, mastering these conventions guarantees unambiguous communication with successful tenderers. A correctly symbolized plan eliminates misunderstandings when ordering joinery, preventing manufacturing errors tied to opening swings or clear opening dimensions.
This page details Swiss standards for drafting wall openings and specifying window sill heights. Applying these graphic guidelines ensures the building permit application complies with municipal requirements and safeguards execution by delivering dependable data to trade contractors.
Graphic Conventions of SIA 400 for Openings
The SIA 400 standard defines a strict visual language for depicting wall openings on architectural and working drawings in Switzerland. The clarity of these drawings is critical for site management and successful contractors, as it dictates joinery manufacturing and masonry openings.
Representing Doors and Opening Swings
On a floor plan, a door's opening swing is indicated by an arc of a circle or a triangle connecting the pivot point (hinge) to the edge of the open leaf. The SIA 400 standard requires drawing the leaf in its intended maximum open position (usually at 90 degrees). The distinction between a left-hand push and a right-hand push door must be unmistakable. Sliding doors are shown with an offset double line indicating pocket or surface travel, with an arrow indicating the leaf's sliding direction. Elements located above the horizontal cut plane, such as a glazed transom, are drawn in dash-dot or dashed lines depending on the scale.
Windows, Sills, and Lintels
The horizontal section of a window shows the frame, sash, and glazing. The sill height (the portion of wall beneath the window) is a critical dimension. It is noted directly in the opening's dimension string, often as a fraction where the numerator gives the clear width and the denominator the clear opening height, followed by the finished sill height. Lintels, which sit above the standard horizontal cut plane (typically set one metre above the finished floor), must be drawn in dashed lines. This graphic distinction allows the mason to immediately spot the structural supports to pour or set in place.
Comparison Table: Compliant Drawing vs Common Errors
Failing to follow SIA 400 creates costly ambiguities. The table below highlights typical discrepancies observed during tender or execution stages.
| Opening element | Compliant drawing (SIA 400) | Common plan error | Consequence on the construction site |
|---|---|---|---|
| Opening swing (door) | Solid arc of a circle running from hinge to open leaf. | Inverted symbol or missing arc. | Manufacture of unusable joinery, clash in day-to-day use. |
| Sill height | Explicit dimension relative to finished floor level (e.g. sill 90). | Omitted dimension or measured from structural slab without clarification. | Fall hazard, masonry opening set too low requiring demolition. |
| Lintel | Dashed line indicating element above horizontal cut plane. | Drawn as a continuous line or omitted entirely. | Mason misses the lintel, resulting in masonry sagging. |
| Sliding door | Leaf with directional arrow and hatched pocket or slide zone. | Single line without indicating the pocket or travel space. | Insufficient wall recess, making it impossible to install the subframe. |
| Glazed transom | Dash-dot line indicating the upper fixed section. | Drawn as a standard full-height door. | Oversized door leaf ordered, extra replacement costs. |
Consequences of Drafting Errors and Liabilities
A drafting error triggers the planner's liability. If a joiner manufactures a batch of doors with the wrong hand based on an approved working drawing, refabrication costs fall on the architectural firm. Under art. 368 CO (client's rights in the event of defects: rejection, price reduction, rectification, damages), the client can demand rectification at the responsible party's expense. Extra costs to alter masonry and fix an incorrectly dimensioned sill represent a direct financial loss (in the range of several thousand Swiss francs on a residential building). Furthermore, an unnoted low sill on drawings prevents masonry contractors from planning adequate edge protection, violating safety regulations.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and situations below are illustrative examples intended to demonstrate how graphic conventions apply in practice.
Scenario 1: Inverted Opening Swing in a Care Home (Canton of Vaud)
During construction of a medicalized care home, 1:50 working drawings fail to show the opening swing of medical bedroom doors using the mandatory arc. The joinery firm, employing twelve installers, interprets the straight line as a left-hand pull swing, whereas the specifications required a right-hand push to facilitate gurney access. The defect is discovered when installing the door frames. Remanufacturing forty doors generates an illustrative extra cost of around 35 000 CHF. The architectural firm must absorb this financial loss because its drawings failed to comply with SIA 400.
Scenario 2: Omitted Dashed Line for a Lintel (Canton of Fribourg)
During the erection of an office building, the draftsperson forgets to show the ground-floor window lintels with dashed lines. The masonry contractor builds brick walls without leaving room for reinforced concrete padstones and lintels. The error is spotted by site management before roof framing begins. The masonry must be shored, bricks saw-cut, and lintels cast in place underneath. This emergency remedial work causes a two-week delay and estimated extra costs of 12 000 CHF, demonstrating why following drafting conventions for elements outside the main cut plane is so vital.
Surfaces, standards and permits: free tools
SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.
Frequently asked questions
How do you show a door's opening swing (SIA 400)?
The SIA 400 standard specifies a triangle pointing toward the hinge. A solid line shows the door opening toward the viewer of the working drawing, eliminating confusion.
How is a window sill drawn on Swiss plans?
The sill is drawn with a thin solid line. Its height above finished floor level is written above the dimension line, in accordance with SIA 400 guidelines.
Should lintels be dimensioned differently on a working drawing?
Yes, the lintel height is noted below the dimension line. This precision prevents illustrative extra costs of around 500 CHF per window modified on the construction site.
How do you distinguish a sliding door from a hinged door?
A sliding door is represented by a straight arrow running along the wall. SIA 400 requires this distinct marking to ensure unambiguous interpretation by the contractor.
Do fire doors require a specific symbol on the drawing?
Yes. In addition to the opening swing, the plan shows the fire resistance rating in text beside the symbol, meeting cantonal fire protection guideline requirements.
How should a tilt-and-turn window be drawn to prevent errors?
The drawing combines both opening operations using intersecting lines. Clear dimensioning avoids joinery mistakes valued at roughly 1200 CHF per unit.
Additional resources:
- Standard SIA 400: Complete Guide to Architectural and Execution Drawings in Switzerland
- Scales 1:100 vs 1:50 Under Standard SIA 400: Graphic Level of Detail Expected in Switzerland
- Swiss Colour Code on Renovation Plans (Grey Existing, Red New, Yellow Demolition - SIA 400)
- Cumulative Dimensions and Levels (±0.00 and m a.s.l. Pierre du Niton): SIA 400 Dimensioning Rules