Skip to content
Practical guide

Standardised A4 Folding and Mandatory Details for Swiss Plan Title Blocks

Master standard A4 folding and mandatory title block details under norm SIA 400. Avoid plan rejections by Swiss municipal authorities.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Title block rejected by site management leading to reprints (estimated loss of around 500 CHF per set), in breach of norm SIA 400.
  2. Legal / Joint Body / SUVA: Dossier rejected by the competent authority under the LAT due to missing mandatory signatures, halting the building permit.
  3. Administrative / Acceptance: Non-compliant folding preventing filing in standard Swiss lever-arch binders, misplacing revision indexes before acceptance under norm SIA 118.

In Switzerland, document management on a construction project demands absolute rigor. Norm SIA 400 defines drafting rules, including standardised folding to A4 format and title block structuring. For architects and draughtspersons, these standards guarantee immediate legibility of critical information (scale, coordinates, revision indexes) for all parties, from site management to trade contractors on the construction site.

An incomplete title block or incorrect folding exposes the consultant to administrative delays, particularly during building permit applications. Municipalities require structured dossiers for archiving. This guide details the mandatory mentions of the title block and the A4 folding technique, ensuring flawless plan traceability.

Standard A4 Folding Rules According to Norm SIA 400

Norm SIA 400 imposes a strict method for folding architectural and engineering drawings. The main objective is to reduce any original format (A3, A2, A1, A0 or elongated formats) to a final A4 size (210 x 297 mm) allowing direct archiving in standard Swiss lever-arch binders. The fundamental principle relies on accordion folding. The title block must appear on the front page, fully visible without having to unfold the document.

For drawings intended to be bound or punched, a 20 mm filing margin must be left clear along the left edge of the final A4 format. Folding is performed first across the width using vertical folds, then along the height using horizontal folds. The manual or automated folding process requires millimetre precision. A poorly folded plan protruding from the A4 format risks being dog-eared or damaged when inserted into a sleeve or ring binder, compromising the document's longevity. This standardisation ensures that site management, contractors and municipal authorities can handle and consult dossiers without risk of tearing. Compliance with these dimensions is imperative for exchanges with specialist engineers who integrate their own data onto architectural background drawings.

Structuring and Mandatory Details of the Title Block

The title block, systematically placed in the bottom right corner of the drawing, serves as the document's identity card. According to Swiss drafting directives, it gathers legal, technical and administrative information. The standardised title block generally features a maximum width of 185 mm to 190 mm, allowing it to fit perfectly within the visible width of the folded A4 format.

Essential elements include the identification of the client, the consultant and the contractor if applicable. The drawing title must be unambiguous. Technical data requires an accurate statement of the scale, original sheet size, creation date and draughtsperson's name. In addition, geographic coordinates, benchmark elevations and orientation must appear in the immediate vicinity of the title block or inside it to ensure accurate setting out of the building on site. Managing revision indexes is critical: each modification must carry a new index with the date and a brief description. When submitting for a building permit under the Federal Act on Spatial Planning, dedicated boxes must be provided for the handwritten signatures of the client and the author of the plans.

Comparative Table: Compliant Practices vs Common Errors

Drawing Element Compliant Practice (Norm SIA 400) Common Error Consequence and Financial Risk
Title block position Bottom right corner, visible after A4 folding Title block centered or placed on the left Rejection by the municipality, complete reprint (around 300 CHF)
Filing margin 20 mm strip cleared on the left of the folded sheet Edge-to-edge folding without margin Holes punched through the drawing, loss of crucial technical data
Revision indexes Clear revision table (letter, date, signature, reason) Overwriting the file without updating the index Execution of an obsolete version on the construction site (additional costs around 5000 CHF)
Scale and format Explicit mention, e.g.: "Scale 1:50 on A1 format" Scale stated without specifying original sheet size Scale ruler reading errors after A3 reduction (material ordering mistakes)
Signatures (Public notice procedure) Dedicated signature boxes for client and consultant Omission of signature boxes Dossier blocked by the building inspection department, project delay

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and scenarios presented below are illustrative examples intended to demonstrate the application of drafting standards.

Scenario 1: Public inquiry for a residential building (Canton of Vaud)
An architectural firm prepares a plan dossier for the construction of a small apartment building. When submitted to the municipality, the dossier is rejected. The draughtsperson omitted the 20 mm filing margin and folded the sheets inconsistently, concealing the title blocks. Furthermore, the signature boxes required for the building permit were missing.
Consequence: The dossier cannot be published for the public notice procedure. The firm must reprint all 15 sets of drawings (estimated cost around 800 CHF) and loses three weeks on the original schedule, delaying the start of works.

Scenario 2: Reinforced concrete execution drawing (Canton of Geneva)
On a renovation construction site, the civil engineer sends an updated reinforcement drawing to the site management. The title block shows the current date, but the revision index (changing from B to C) was not highlighted in the revision table. The foreman, reading the drawing on the construction site, does not notice the index change and uses the previous version for the reinforcement.
Consequence: The reinforcement is carried out according to revision B. During the inspection prior to pouring, the site management detects the error. The masonry company has to dismantle and redo the rebar, resulting in additional costs of around 3500 CHF and a one-day delay in pouring the slab. Rigorous management of the title block would have immediately alerted the site manager to the exact nature of the modification.

Surfaces, standards and permits: free tools

SIA 416 floor areas and volumes, cantonal zoning ratios, U-values and dew points, acoustics, planning enquiry requirements.

View engineering tools

Frequently asked questions

What dimensions does norm SIA 400 require for the title block?

Norm SIA 400 prescribes a title block with a maximum width of 170 mm, placed in the bottom right corner so it remains visible after folding to A4 format.

How do you fold an A0 drawing for a Swiss lever-arch binder?

Folding is done in an accordion pattern to a width of 210 mm and a height of 297 mm. The official title block must appear on the visible front page.

Which details are mandatory for a building permit application?

The official title block must state the client, project author, scale, date, drawing number, and include the signatures required by the relevant municipality.

Must the title block be updated if the scale changes?

Yes, any change in scale or format requires an immediate update of the title block and the technical revision index according to norm SIA 400.

What is the estimated cost of standard A4 folding?

Printing and folding fees by a professional plotting service range for illustrative purposes between 15 CHF and 25 CHF per drawing, depending on total volume.

Must the title block mention the Pierre du Niton elevation?

Yes, for site layout plans, the reference elevation in metres above sea level tied to the Pierre du Niton must be clearly stated in the official title block.

To deepen your knowledge of Swiss drafting standards, explore our dedicated resources:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.