Digital site minutes, daily report and clearing of reservations under the SIA 118 standard

From the daily diary to the signed acceptance minutes, then tracking defects and warranties: evidence kept in one place.

An end-of-site dispute is rarely decided on the day of acceptance: it is decided on what was noted before, namely the daily report, the meeting minutes and the list of defects. The Art Construction Portail links these three levels: a works diary with site photos, meeting minutes that the client can contest, then an acceptance report with reservations (the snagging list) and signed acceptance minutes. Together they help to keep evidence, with no legal promise.

Art Construction PortailMinutes, diary and site acceptance
14-day trial
  • Works diary and site photos shared
  • Meeting minutes that the client can contest
  • Acceptance report with reservations, then signed minutes that cannot be edited
  • Defects assigned to subcontractors, list sent by email
Start the 14-day trial See the demonstration

From CHF 29 per month, excl. VAT. Trial with no card required.

Why reservations are still being discussed months after acceptance

As a general rule, the SIA 118 standard organises the passage from site to completed work: the work is inspected jointly, acceptance is recorded, the defects found are noted as reservations, the company corrects them, the reservation is cleared when the correction is confirmed, and a warranty period runs from acceptance. The exact terms depend on your contract.

Each step rests on facts: who noted what, when, with which photos, and to which company the defect was assigned. When these facts live in notebooks, messaging apps and emails, reconstructing them is slow and leaves room for doubt. No software settles the substance of a disagreement; a clear, shared record shortens it.

From the daily report to warranty tracking: what the Portail covers

Each function below exists in every plan and follows on in the order of the site. The guides cited detail the practice.

Works diary

The diary gathers progress and site photos, shared with clients. Method: daily site diary.

Meeting minutes

Meetings produce minutes and tasks. The client can contest the meeting minutes. Practice: site meetings and minutes.

Acceptance and reservations

The acceptance report lists the reservations. The acceptance minutes are signed and then can no longer be edited. Framework: acceptance of the work and defects.

Defects and warranties

Defects are assigned to subcontractors, who receive the list by email. After acceptance, warranty tracking is offered: warranties after acceptance.

What “signed, then no longer editable” means

After signature, the acceptance minutes remain as they were signed: a reference version, evidence kept. Their legal weight depends on your contract and on the SIA 118 standard, not on the Portail. As an option, AI can write the minutes; the site manager rereads the text before circulating it.

Three steps, from the site day to clearing the reservations

The chain is built as the site progresses, not on the day of acceptance. Here is the order in which the team fills in the Portail.

Step 1: keep the diary every day

The site manager or foreman completes the diary from the phone browser: progress, events, site photos. This diary is the basis for everything that follows.

Step 2: record every meeting

After the site meeting, the minutes and tasks are recorded. If the client contests meeting minutes, it is better to settle the point before the next meeting.

Step 3: record acceptance and follow the reservations

At acceptance, note the reservations, assign each defect to the subcontractor concerned, then have the minutes signed. Whether the defect has been corrected is then checked on site, with the people concerned.

Paper notebook, spreadsheet or digital minutes: what each method keeps

A site notebook and a spreadsheet are proven methods, often enough for small projects. The table compares what you need to be able to find again, without naming any product.

What each method lets you find again
What you need to find againPaper notebookSpreadsheet and emailsArt Construction Portail
Daily reportHandwritten, to be scanned to shareFile to be kept up to date by each personWorks diary shared with clients
Site photosIn everyone’s phone galleryAttached to emails, hard to find againSite photos in the diary
Meeting minutesSignature on paper, copies to distributeMultiple versions by emailMinutes recorded, contestable by the client
Reservations at acceptanceList on paperDefect table to send to each companyReport with reservations; defects assigned to subcontractors
Acceptance minutesSigned copy to fileFile that can be edited afterwardsSigned, then no longer editable
Warranties after acceptanceDates noted in a diaryReminders to create yourselfWarranty tracking after acceptance

Non-exhaustive comparison of methods. The Portail helps to keep evidence; the legal weight of a document is for a specialist to assess, according to your contract and the SIA 118 standard.

14-day trial, AI minutes option and limits

The Portail can be tried for 14 days with no card required; nothing is charged at the end. To test the chain, open a site in progress and run a real meeting in it. The Portail starts at CHF 29 per month (Starter, 3 active sites, excl. VAT); Pro costs CHF 59 (15 active sites), Unlimited CHF 99. All functions are in every plan.

The option of minutes written by AI is charged at CHF 49 per person per month, up to 100 hours, or CHF 4.90 per recorded hour, at your choice.

Frequently asked questions

What does the Portail keep of acceptance minutes?

The acceptance minutes are signed, then can no longer be edited: you keep a reference version. Treat it as evidence kept, and not as a document whose legal value is guaranteed. Its weight depends on your contract and the SIA 118 standard; if in doubt, consult a lawyer.

How do I follow up the defects noted at acceptance?

The acceptance report lists the reservations. Each defect is assigned to a subcontractor, who receives the list by email. After acceptance, the Portail offers warranty tracking; the periods depend on your contract and the SIA 118 standard. The correction itself is checked on site.

What is the difference between the daily report, the meeting minutes and the acceptance minutes?

The daily report, or works diary, tells the story of the day on site. The meeting minutes record the decisions and tasks from a meeting, and the client can contest them. The acceptance minutes record the state of the work and its reservations; they are signed and then not editable. Three documents, three moments.

Can AI write my minutes, and at what price?

Yes, as an option: CHF 49 per person per month (up to 100 hours) or CHF 4.90 per recorded hour. Always reread the text before circulating it: the AI proposes, the site manager corrects. The voice site minutes tool lets you test the idea with no registration.

Going further

Plans, tools that need no registration, a related page and guides on the diary, minutes and acceptance.

Sources and limits. Functions described according to the Support guides and the Portail modules in service on 26 November 2026. General reminders on the SIA 118 standard: the contract and a lawyer are authoritative. Prices in CHF, excl. VAT; the plans page is authoritative.