Aller au contenu
Website
SIA 416 · SIA 380/1 Tool 5.1 Online

Areas Calculator (SP, SBP, SN, SRE) & Built Volume according to SIA 416 Standard

Calculate areas (SP, SBP, SN, SRE) and the built volume according to the SIA 416 standard.

Interactive tool

A Your building

m²
m²
levels
levels
m

3 Ratios and prices

%
%
CHF / m³

Areas, index and volume

Floor area (SP)
Net area (SN)
Usable area (SU)
Energy reference area (SRE) per SIA 380/1 (heated levels)
IBUS (determining above-ground floor area / plot)
Built volume SIA 416
Estimated cost of works CFC 2
Hierarchy of areas in standard SIA 416
Aream²
SIA 416 volume compared with the old SIA 116 cube and price per cubic metre
Volumem³Price per m³ (CHF)CFC 2 cost (CHF)

The tool's SRE is footprint × heated above-ground storeys; the exact SRE excludes the thickness of the exterior walls. The IBUS counts the storeys excluding basement, attic space and penthouse. The old SIA 116 cube is estimated with a surcharge of 8 % to 12 % (specification).

Embed this calculator on a website page

Paste this code into the page, or write [outil code="5.1"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Understanding the official hierarchy of areas under the SIA 416 standard (SP, SN, SU, SD, SI)

The SIA 416 standard classifies all the areas of a building in a hierarchy: the floor area (SP) is the sum of the usable areas, the circulation areas, the service areas and the construction area. The difference net area SN and usable area SU SIA 416 is as follows: the net area (SN) is the floor area minus the construction area; it divides into usable area (SU), circulation areas (SD: corridors, stairs, landings) and service areas (SI: technical rooms, shafts, lift machine room). The usable area is the one that serves the use of the building.

SIA 416 hierarchy of areas with the tool's default values
AreaDefinitionExample
SP, floor areaSum of all accessible floor areas, walls included480.00 m² (160 m² × 3 levels)
SC, construction areaWalls, masonry and load-bearing elements (noted "SI" in the tool's specification)72.00 m² (15 % of the SP)
SN, net areaSP − SC: area delimited by the walls408.00 m²
SU, usable areaPart of the SN that serves the use of the building326.40 m² (80 % of the SN)
SD and SI, circulation and service areasThe rest of the SN: circulation, technical rooms, annexes81.60 m² (20 % of the SN)

Why the Floor Area (SP) includes the thickness of walls and façades (SI)

The floor area is measured on the outer outlines of the building: it therefore includes, on each level, the thickness of the walls, façades and load-bearing elements. This part is the construction area, which the standard calls SC and which the tool's specification notes "SI"; in the standard, SI designates the services. With a ratio of 15 %, the walls "consume" 72.00 m² out of 480.00 m² of floor area.

This inclusion explains why the floor area is always larger than the area you can furnish. For a building permit, it is the floor area that is used for the utilisation index; to sell or let, it is the usable or net area that counts. Always check which area is quoted in a contract or an advertisement.

The Energy Reference Area (SRE SIA 380/1): the basis for subsidies and the CECB

The gross floor area SBP SRE SIA 380/1 designates the energy reference area: the floor area of the heated rooms, inside the thermal envelope. It is used to express heat demand per square metre, for the cantonal building energy certificate (CECB) and for subsidy applications. The tool calculates it as the footprint multiplied by the heated above-ground storeys: 320.00 m² for 2 storeys, without the unheated basement. With a heated basement level, it would increase by 160.00 m².

Clarification on the text of the standard. The exact SRE excludes the thickness of the exterior walls and depends on the perimeter actually heated: the tool's value (footprint × storeys) is an upper bound for a preliminary study. Unheated areas, such as the basement, do not count in the SRE although they count in the SIA 416 floor area (480.00 m² against 320.00 m² here).

SIA 416 Volume vs Old SIA 116 Cube: why the price per m3 changes by 8 % to 12 %

The calculation volume SIA 416 vs SIA 116 sets two methods against each other. The SIA 416 volume is calculated on the floor areas and the storey height: SP × height, that is 480.00 m² × 2.85 m = 1'368.00 m³. The old SIA 116 cube counted volumes with rules that increased roofs and basements: according to the tool's specification, by roughly 8 % to 12 %, that is 1'477.44 to 1'532.16 m³ for this building.

The calculation cost per m3 SIA 416 Switzerland depends on this basis: the same cost of 1'203'840 CHF gives 880 CHF/m³ in SIA 416, but 785.71 to 814.81 CHF/m³ in SIA 116 cube. A price per m³ can only be compared using the same calculation method.

Volume and price per cubic metre according to the method
MethodVolumePrice per m³CFC 2 cost
SIA 416 (SP × storey height)1'368.00 m³880.00 CHF1'203'840 CHF
Former SIA 116 cube (+8 %)1'477.44 m³814.81 CHF1'203'840 CHF
Former SIA 116 cube (+12 %)1'532.16 m³785.71 CHF1'203'840 CHF

The surcharge of 8 % to 12 % on the old cube is the value in the specification; it was not verified in the text of the SIA 116 standard. For the complete budget of the project, see the overall budget simulator CFC 0 to 9.

Calculating the IBUS (AIHC) vs the old CUS/COS for your building permit

The intercantonal agreement on the harmonisation of building terminology (AIHC) replaced the old cantonal coefficients, such as the land-use coefficient (CUS) and the site-coverage coefficient (COS), with indices defined in the same way in the signatory cantons. The calculation IBUS relevant floor area divides the sum of the floor areas by the relevant plot area: IBUS = relevant SP / plot. The storeys count excluding the basement, the attic space and the penthouse.

In the example, the relevant above-ground floor area is 320 m² (160 m² × 2 storeys), for a plot of 800 m²: IBUS = 0.40. The basement does not count: without it, the IBUS stays at 0.40. One more storey on the same footprint changes the index as follows:

IBUS according to the number of above-ground storeys on a footprint of 160 m² and a plot of 800 m²
Above-ground levelsAbove-ground floor areaIBUS
2 levels320 m²0,40
3 levels480 m²0,60
4 levels640 m²0,80

The exact definition of the relevant floor area, the relevant plot area and the storeys depends on the text of the AIHC adopted by your canton and on the municipal regulations: check it with the municipality before filing a building permit application.

⚡ Price your project in Soumission

Frequently Asked Questions on SIA 416 Areas, the SRE and the IBUS (FAQ)

1. What is the difference between floor area, net area and usable area under SIA 416?

The floor area (SP) is the sum of all the floor areas of a building, walls included. The construction area (SC: masonry, walls, load-bearing elements) is deducted from it to obtain the net area (SN). The net area divides into usable area (SU), circulation areas (SD: corridors, stairs) and service areas (SI: technical rooms). The tool's example: 160 m² of footprint over 3 storeys give an SP of 480.00 m², an SN of 408.00 m² and a usable area of 326.40 m².

The tool's specification notes the construction area "SI": in the vocabulary of the standard, SI designates the services and the construction is the SC. The ratios (15 % and 20 %) are assumptions to be replaced by those of your project.

2. How do you calculate the IBUS and the SRE of a building for a building permit or the CECB?

The gross land-use index (IBUS) of the AIHC intercantonal agreement is the ratio between the sum of the floor areas and the relevant plot area; the storeys count excluding basement, attic space and penthouse. The tool calculates footprint × above-ground storeys / plot: 320 m² / 800 m² = 0.40. The energy reference area (SRE, SIA 380/1) only takes the heated storeys into account: 320 m² here.

The real SRE excludes the thickness of the exterior walls and depends on the heated perimeter; the definition of the IBUS varies according to the canton that has adopted the AIHC. The tool gives an order of magnitude for a preliminary study, not a permit value.

3. Why does the SIA 416 volume give a different price per m³ from the old SIA 116 cube?

The SIA 416 volume is calculated on the floor areas and the storey height (SP × height: 1'368.00 m³ here). According to the tool's specification, the old SIA 116 cube increased roofs and basements by about 8 to 12 %, that is 1'477.44 to 1'532.16 m³. For the same cost of 1'203'840 CHF, the SIA 116 price per m³ is therefore lower: 785.71 to 814.81 CHF/m³ against 880 CHF/m³ in SIA 416.

Comparing two prices per m³ only makes sense with the same standard: an estimate at 880 CHF/m³ SIA 416 cannot be compared with a SIA 116 price per m³ taken from an old final account. The figure of +8 % to +12 % comes from the specification and was not verified in the text of the standard.

Indicative information based on the SIA 416 standard, the SIA 380/1 standard and the AIHC; it does not replace the text of the standards or the rules of your municipality.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.