Loading...
About this tool
What an IFC Viewer is Used For and Who Uses It
On construction sites in Switzerland, the digital model is playing an increasingly important role during the execution and tender phases. Architects and engineers regularly send files in IFC format. For a general contractor, a site manager or a quantity surveyor, acquiring a license for heavy modeling software does not always make sense. The goal in the field remains simple: visualize the building, understand the general geometry, check a technical duct routing or verify volumes before responding to a call for tenders.
An IFC viewer serves precisely as a reading and query tool. It provides access to geometric content and technical data without modifying the original file. Tradespeople, whether masons, electricians or plasterers, use it to prepare their work without having to request PDF exports for every unclear detail. Technical offices also use it to check structural elements and cross-reference information with project specifications.
Direct access to technical information avoids unnecessary email exchanges for detailed points. The tool adapts to practical needs: navigating from the outside to the inside, locating a specific structure, checking a height under slab or identifying the composition of a wall. Having a BIM inspector accessible from a browser close at hand simplifies work in both the site office and the workshop.
Open an IFC Model Without Installing Anything
To open an IFC file with our online tool, no installation is necessary on your workstation. The tool works directly in your web browser, whether you are using a site laptop or a technical office desktop station. You do not need to create an account or enter an email address to start your analysis.
The system supports IFC2x3 and IFC4 file formats, as well as compressed archives in .ifczip format. When you drag your document into the reading area, the file is processed locally by your own browser. The 3D rendering engine is loaded on demand, allowing the home page to remain lightweight during your first visit.
Upon opening, several standard views are offered to immediately orient the model: top, front, side or isometric view. If you select a specific structure in the scene, a framing command allows you to immediately center the camera on that precise element. You can also place visual notes directly on the model to identify a work area. The fluidity of loading depends on the size of your file and your machine's RAM.
Browse the Structure: Floors, Categories, Elements
A digital model is not limited to a three-dimensional block of geometry. It contains a precise hierarchical organization established according to construction logic. Our inspector integrates a spatial explorer that faithfully reproduces this tree structure in the form of a drop-down menu.
You will find the project level, the site, the building, and then the breakdown by floors from the foundation slab to the roof. Inside each level, objects are grouped by standard trade categories:
- Slabs, strip footings and foundation slabs
- Load-bearing walls, lightweight partitions and facade walls
- Columns, beams and metal or concrete structural elements
- Windows, exterior and interior doors
- Technical ducts and blockouts
This classification allows for methodical reading. By clicking on a precise level, you instantly target all the elements associated with it. This allows the quantity surveyor to separately analyze the structures of a basement or a typical floor without suffering the visual clutter of upper floors. The site manager can thus prepare their phasing step by step.
Hide, Isolate, X-Ray: Reading a Loaded Model
On a collective building project or industrial hall, the density of graphic information often makes navigation confusing. Finishing work elements or exterior walls prevent viewing the central core or technical paths. To analyze intervention areas, several visualization modes are accessible with a single click.
The hide function temporarily removes selected elements from the visual field. If you are working on masonry, you can hide joinery or furniture in bulk to clean up the scene. Conversely, the isolate function turns off the entire model except for the chosen object or category. You can thus display only the load-bearing structure or isolate slab blockouts.
Transparency mode, often called X-ray vision, applies a semi-transparent texture to all exterior volumetry. This mode proves particularly useful for spotting embedded elements, checking the continuity of a poured concrete wall, or locating technical networks hidden behind a duct without losing the overall perception of the building's volumes.
Section Box and Laser Dimensioning
Superficial observation of a 3D model is not enough to settle execution details. To inspect the insides of a construction, our tool integrates a dynamic section box adjustable along the three X, Y and Z axes. You can move each cutting plane independently to slice through the building, open a section view on a slab, or observe the interior of a complex technical duct.
In addition to sectioning, the 3D laser dimensioning function allows you to take dimensions directly from the geometry. The tool features a magnetic snap system that locks onto the vertices and edges of modeled solids. This makes it possible to measure with exactitude:
- Clear height under slab or false ceiling
- Width of a passageway opening or distribution corridor
- Thickness of a masonry wall or perimeter insulation
- Layout distance between two structural columns
These dimension surveys avoid approximations during coordination meetings. You obtain your dimensions directly from the geometry injected by the model authors, without intermediate calculations.
Reading Properties and Quantities of an Element
One of the major roles of the IFC format lies in the non-graphic data attached to objects. By selecting a component in the viewer, the property inspector displays the parameters integrated by the modeler. You can consult property sets (PropertySets), indicated materials as well as identification data of the structure.
When the file has been populated during its export, the quantities associated with each element appear in the inspection panel. You will find formwork or painting surfaces, concrete volumes for slabs and walls, as well as any lengths or weights. The tool offers a CSV export function for quantities by category. This tabular file can be opened directly in your spreadsheet software to be used when preparing your offers or monitoring your takeoffs.
It should be noted that the viewer extracts the data written in the IFC file. It does not invent any information. If the modeler did not include quantity sets when exporting their model, these fields will remain empty in the inspector.
The Costly Mistake in the Field
On the construction site, the typical mistake consists in considering the quantities extracted from an IFC file as an absolute contractual truth without prior verification. We often see quantity surveyors or site managers taking the concrete volumes or wall surfaces indicated in the tree structure to order their supplies or set their unit price, without checking the modeling method used by the author of the file.
Some modelers do not deduct door and window openings from wall volumes, while others integrate concrete volumes without deducting the footprint of slabs at intersections. Similarly, stair voids or technical shafts are sometimes modeled as solids. If you rely blindly on the raw sum displayed without cross-referencing the data with the project description and formwork plans, you risk ordering too much or not enough material, leading to immediate financial losses or delivery delays.
The action that avoids this disappointment is systematic: before validating a global quantity, isolate two or three representative elements in the model, use laser dimensioning to manually recalculate the base geometric volume, and compare this result with the volume property declared in the IFC file. In case of discrepancy, rely on the limitation periods agreed upon with the client.
Your Models Stay With You: Confidentiality and nDSG
Project data confidentiality is a central concern for construction companies in Switzerland. A digital model contains all of a client's plans, the technical details of a building and sometimes sensitive information on site security. Under the nDSG (nLPD), the processing of digital documents requires strict vigilance regarding data localization.
With our free viewer, 100% of operations take place directly in your web browser. No IFC file, no compressed archive and no plan data are sent to an external server. Loading, graphic triangulation and spatial data extraction take place on the processor and RAM of your own computer.
The application has no remote memory. Nothing is saved on our servers. As soon as you close or refresh your browser tab, the workspace is reset and all loaded data disappears from the session. If you have taken measurements or extracted a CSV quantity file, you must save it to your local disk before leaving the page.
What the Free Version Does Not Do
Our free tool was designed to offer fast and autonomous reading, but it has clear technical limits that should be known before working on large-scale projects.
Display performance depends entirely on the power and memory of your workstation. On very large models, initial opening may freeze the page for a few seconds. When the file exceeds a threshold of around 150 MB, the studio displays a warning message to signal the load on your browser. On the other hand, the tool manages only one model at a time in the active session. Rare or very advanced modeling cases, such as complex curves, IFC4x3 infrastructure alignments or certain non-polygonal volumes, are not all covered. In case of visual doubt, we invite you to compare the display with your usual modeling software.
On the geometric level, room volumes (IfcSpace) are hidden by default upon opening to avoid masking the interior of the building with transparent blocks. In addition, 3D sections do not generate cap surfaces: when a section plane crosses a wall or a slab, you observe the hollow interior of the geometric solids. Finally, the free version does not integrate any pricing or cost data: for your financial calculations, you must apply your own figures to your estimation documents or your tenders.
Switch to Plans Pro or the Portal
For teams that need to organize execution monitoring over several months, simple consultation without saving quickly shows its limits. When you need to keep annotations made on site or share observations with colleagues, a connected solution becomes necessary.
Our Plans Pro solution allows you to deposit the IFC model in the site's private storage. It offers the possibility to save your annotated views, section viewpoints and dimension measurements without reloading the model at each intervention, with a complete history of successive project versions. You also benefit from a teamwork mode to collaborate on the same technical files, the export of your reports without watermark with your company colors, as well as direct integration of the ACIP price database to price your services without manual reentry.
For defect management and site coordination, coupled use with our Portal makes it possible to generate punch list tickets directly linked to a 3D viewpoint and the concerned IFC elements. This facilitates dialogue between site management and tradespeople until final sign-off.
Frequently asked questions
Are my IFC files sent to a remote server?
No. All graphic processing and property analysis takes place locally in your web browser. No model files are transferred or stored on an external server during the use of the free tool.
Can I retrieve surfaces and volumes for my takeoff?
Yes, if these values were entered by the model author in the IFC property sets. You can view values per element and generate a CSV format export by category.
What happens if I refresh the browser page?
The free application does not retain any memory of your work. If you refresh or close the tab, the display resets completely. Remember to export your quantity CSV file before leaving.
What BIM model formats are accepted by the tool?
The viewer supports .ifc files based on IFC2x3 and IFC4 schemas, as well as compressed files in .ifczip format. It does not read proprietary formats from drawing editors.
Why do certain rooms seem to hide the entire interior of the model?
This phenomenon occurs when space volumes (IfcSpace) are activated. To facilitate visibility of finishing work and structure, our viewer automatically hides these volumes during initial loading.
Does the free viewer include a price database for estimating?
No. The free version does not include any price database or preconfigured rates. You work solely with geometry, file properties and your own figures for your takeoffs.
Why does a warning appear on certain bulky files?
3D calculation relies entirely on your workstation's memory. Beyond about 150 MB, the browser may slow down for a few moments during model decompression, hence the display of a preventive message.