Renovated room shown in 3D with walls, openings and ceiling: background image for the Plans Pro page

Plans Pro · Preliminary design

3D view of a renovation preliminary design: show the client the project before the quotation is signed

A building owner (client) who sees the 3D model, its sections and its elevations understands what the quotation describes better than by reading lines of text alone.

A renovation quotation describes work; it does not show the result. Faced with a list of items, the building owner struggles to picture the new layout, the heights or the position of an opening, and ends up comparing mainly the prices. Plans Pro makes it possible to present the preliminary design differently: a 3D view of the model, sections and elevations, then the model shared read-only with the client in the Portail. The quantities, for their part, go to an ERP quotation. This page describes the approach, its limits and what the software does not produce.

Art Construction Plans Pro2D/3D plans in the browser
14-day trial
  • 3D view of the model, sections and elevations
  • Model shared read-only in the Portail
  • Take-offs on PDF plans linked to ACIP items
  • Quantities sent in one click into an ERP quotation
Start the 14-day trial See the demonstration

From CHF 59 per month, excl. VAT. No card required.

Why a text-only quotation comes down to price

A purely text quotation forces the building owner to imagine. They read “demolition of the partition, creation of an opening, new screed” and compare three tenders on the total line alone. The differences in scope or layout, which explain a price gap, go unnoticed.

When people talk about “3D renders”, many clients imagine heavily worked architect’s visuals, with materials, light and atmosphere. Plans Pro does not offer that: the 3D view of the model, the sections and the elevations show volumes, heights and openings.

From the 3D view to the quotation: what Plans Pro links

Plans Pro is used in the browser; projects are stored in Switzerland. It links four moments of the sales file.

Show: the 3D view of the model

The walls, slabs, doors and windows drawn in 3D form a model that you present in 3D view, in sections and in elevations: the client sees the volumes before reading the prices.

Share: the read-only model

The model can be shared read-only with the client in the Art Construction Portail: they consult it without being able to modify it.

Measure: the take-offs

Once the scale is set, take-off on a PDF plan covers lengths, areas, volumes and walls, as well as special shapes such as gables, vaults or reveals. The measurements are linked to ACIP items.

Price: quantities to the ERP

One click is enough to send the quantities into a quotation in the Art Construction ERP; the prices, discounts and margin remain your decision.

The SIA 416 area schedule, calculated from the model, and the BIM viewer for IFC models received from another office complete the whole.

Three steps, from the model to the quotation presented to the client

Order matters: the client must see the project before reading the price, and the price must match what they have seen.

Step 1: draw the preliminary design model

Build walls, slabs, doors and windows, then produce the sections and elevations that explain the sensitive points: heights, openings, levels.

Step 2: share it with the client

Share the model read-only in the Portail, with the useful PDF plans. The client looks at it at their own pace; you gather their comments and adapt the preliminary design.

Step 3: price from the same plans

Measure the quantities on your PDF plans, link them to ACIP items, then send them in one click into an ERP quotation. The quotation thus starts from the same plans the client has seen.

Quotation alone, quotation with plans, quotation with model: what the client sees

This is not about comparing software, but ways of presenting a tender. For a small site, a well-written quotation may be enough; the model becomes useful when the project changes the layout or the openings.

Three ways of presenting a renovation tender
What the client receivesText quotation aloneQuotation with PDF plansQuotation with Plans Pro model
Understanding of the projectRelies on the client’s imaginationReading plans, sometimes hard for non-professionals3D view of the model, sections and elevations
Link between quantities and drawingQuantities stated with no visual supportQuantities taken over by handTake-offs linked to ACIP items, quantities sent to the ERP quotation
Consultation by the clientPDF or paper documentPDF or paper documentModel shared read-only in the Portail
Limit to know aboutPrice gap hard to explainPlans to be produced or obtainedNo atmosphere visuals (materials, light)

Non-exhaustive comparison of ways of presenting a tender. The Plans Pro column reflects the functions of the offer in service; check them in the demonstration.

14-day trial, prices and limits for your presentations

To prepare a presentation, you can start with the free limited version, with no time limit: it is for drawing the model, but exports and imports are reserved for subscribers. The full trial then lasts 14 days, with no card required; at the end, nothing is charged.

The Solo plan starts at CHF 59 per month for 1 user; Office (CHF 149, up to 3 users) and Team (CHF 399, up to 10 users) are for teams. “Plans Pro only” is charged at CHF 59 per user per month, CHF 45 with the Portail and CHF 39 with ERP Business. Prices in CHF, excl. VAT. Before presenting a model, check that:

Frequently asked questions

Does Plans Pro produce heavily worked atmosphere visuals?

No. Plans Pro shows the model you draw: 3D view, plans, sections and elevations. It does not produce retouched visuals with materials and lighting. For a renovation preliminary design, the 3D view helps to show volumes, heights and openings; if the client expects an architect’s visual, another provider is needed.

How does the client see the model?

The model is shared read-only with the client in the Art Construction Portail, which is used in the browser, including on a phone. The client consults it without being able to modify it. The Portail is separate software, from CHF 29 per month: check on its page what your plan includes.

Should I show the model before or after pricing?

Before, preferably: the client reacts to the project, you adapt it, then you price the version chosen. The quantities are then measured on the PDF plans of that version and go into an ERP quotation. If the project changes after the quotation is sent, rework the model and the quotation together, so that they describe the same work.

Can the client sign the quotation on the model?

The shared model is read-only: it is for showing the project, not for signing it. Signing the quotation follows your usual procedure. The Portail does, however, let you put variations or choices of materials to the client for approval, which keeps a record of the decisions taken during the site.

Going further

Software pages, tools to try and guides linked to this subject.

Sources and limits. Functions described according to the Plans Pro and Portail offers in service on 26 November 2026. Indicative: only the signed contract and quotation are authoritative. Prices in CHF, excl. VAT; the offer page is authoritative.