Home › Tools › Studio Devis Suisse
Enter your items, paste or dictate your site notes: the tool calculates the quotation (discount, shared site costs, 8,1 % VAT), compares the total with your cost price including your canton's social charges, adds useful clauses and prints the QR bill for the down payment. Free, no account needed: the quotation stays in your browser.
Live software screen recording: company retrieved from the federal register, real line items from the ACIP list (14 045 prices), prices adjusted to the site's canton and municipality, margin, discount, shared site costs, SIA 118 standard, followed by the A4 quotation with its QR-bill for down payment.
Muted video, 42 seconds. The PDF quotation is from the demonstration: sample issuing company, genuine ACIP prices.
Type your company name: the list of registered companies appears, and a single click fills in the address and UID number. Add the phone number, email address, and optionally your logo (PNG, JPG, SVG, or WebP): it is resized directly in your browser, stays there, and is printed in the top left corner of the quotation. For the client, select «Private individual» or «Company / Property management / Subcontracting», then enter their name and address. The quotation number, date, validity period, and quotation language can be set below the addresses. The IBAN is only used for the down payment QR-bill.
Each line item contains a CFC code, a description, a quantity, a unit (m², m³, ml, pce, h, fft, kg), and a unit price. «Quick entry» converts raw text into lines: one line per item, with quantity and unit at the end, for example «271 Plasterboard partition EI30 45 m2». The «Dictate» button uses your browser's speech recognition. Prices remain to be entered: a price at 0.00 is highlighted so nothing is sent unpriced.
The «Quotation / Option» button excludes a line item from the total: when printed, options are grouped into an «Options at the client's choice (to be ticked)» box, outside the binding total, right before signatures. «Print / PDF» outputs the quotation alone in A4 format, excluding internal calculation panels. The quotation is automatically saved in this browser; «Export project (.json)» generates a file that «Import (.json)» can reopen later or on another device.
The interface follows the website language. The printed quotation and its QR-bill can be selected separately under «Quotation language (PDF)»: French, German, Italian, Romansh or English. Headings, totals, clauses and the payment slip will switch to that language; your item descriptions remain exactly as you entered them.
The «Profitability» panel calculates the cost of one productive hour for your worker: monthly salary including the 13th month, canton-specific employer contributions, monthly expenses, divided by the actual productive hours. Combined with your overhead rate (18% by default, adjustable to your business), scheduled hours and material purchases, it calculates the site's cost price compared to the net total excluding VAT of the quotation. Default values are from the labour cost and daywork rate simulator; replace them with your own.
An accepted quotation is not cash in the bank. Discounts and shared site costs reduce the total quotation amount; prompt payment cash discounts and retention reduce what reaches your account within 30 days. The «Cascade of deductions» panel highlights the difference in Swiss francs. The retention is returned later or replaced by a bank guarantee: it impacts cash flow, not the price.
A private individual is not listed in the commercial register: with «Private individual», the tool searches nothing and transmits nothing. With «Company / Property management / Subcontracting», enter the client's name: matching companies are listed below the field (name, legal form, address, UID number, status), with active companies shown first; clicking one auto-fills all fields. The tool queries the federal business register (UID) and flags in red if the client is struck off, in liquidation, or in bankruptcy. The register searches by whole words: type at least one full word of the name. This check does not provide information on pending debt enforcement proceedings: contact the debt collection office for this.
The pricing mode distinguishes unit prices with final settlement based on measured quantities (Art. 374 of the Swiss Code of Obligations) and lump-sum fixed prices (Art. 373). A checkbox includes standard SIA 118 as a contractual basis, supplementing the Swiss Code of Obligations. Three standard clauses can be added with a single click: material price increases based on KBOB indices, asbestos and other hazardous pollutants uncovered during works, and daywork rate schedules for additional ordered works. These are drafting aids, not legal advice.
Once your company’s IBAN, registered company name, postcode and city are entered, the Studio generates the down payment slip (receipt and payment part, 210 × 105 mm) with the amount and quotation reference. Upon printing, it is positioned at the bottom of the last page, never split across pages. It uses the engine of the Swiss QR-bill generator and validator, which complies with SIX guidelines. With a QR-IBAN, a QR reference is derived from the quotation number.
The Studio opens already set to your trade or to the canton of your site. Each page presents the reference values used (employer contributions, daywork rate, productive hours, SIA 118 reservations, deposit by QR-bill) and opens the pre-filled tool.
No. The quotation, calculations, logo, and QR-bill stay in your browser: no address of this website receives your line items, prices, or IBAN. Only one thing is sent: the text entered into your company name, and into the name of a «Company» client, to query the federal business register. For a «Private individual» client, nothing is sent. Voice dictation relies on your browser’s built-in speech service.
From the ACIP 2026 database published on this site (worker cost simulator, 26 cantons, three collective labour agreements: structural work, French-speaking Switzerland finishing trades, building services). These are averages: your actual rates appear on your compensation fund statements and your actual wages in your contracts. All fields are editable.
The tool starts from the monthly wage including the 13th month, adds the canton-specific employer contributions and monthly expenses, then divides by the actual productive monthly hours: this gives the productive hourly cost. It then adds your overheads, multiplies by the planned hours (adjusted for site pace) and adds material purchases. The margin is the difference between the net total excluding VAT of the quotation and this cost price.
We cannot say for your specific bank: this payment slip has not been tested with every bank or at a post office counter. It is built by the same engine as the website’s QR-bill generator, complying with SIX guidelines (structured address, IBAN checksum validation), and printed at the bottom of the final page in 210 × 105 mm format. Before sending it to your clients, make a small test payment via e-banking and check the pre-filled data.
It verifies registration, not creditworthiness. For a «Company» client, the search queries the federal business register (UID) and displays a red alert if the company is struck off, in liquidation or bankrupt. Pending debt enforcement proceedings must be checked with the debt collection office, and the full register entry can be viewed on Zefix (a link is provided).
These are drafting aids: pricing method (Art. 373 or 374 of the Swiss Code of Obligations), SIA 118 standard, quotation validity, price escalation clause, asbestos and pollutants clause, daywork rates. They do not replace your general terms and conditions or legal advice. Have your quotation template reviewed once, then reuse it.
Studio is a free tool for one quotation at a time, no account required, with a read-only public sample of 13 line items from the ACIP price list. Soumissions Pro is designed for pricing with the full database (14 045 prices with site descriptions) and responding to tenders. ERP Art Construction (Suite Pro) manages the entire business: quotations, invoicing, site tracking, payroll and HR. The trial lasts 14 days; the complete ACIP database requires a paid subscription.