The 3 Major Site Risks
- Financial / Margin: Undue tying-up of cash flow or abusive call on the bank guarantor of up to 5% to 10% of the total cost of the work under norm SIA 118, freezing the contractor's operating credit lines with Swiss financial institutions under the guarantee contract governed by art. 492 CO.
- Legal / Joint / SUVA: Formal loss of legal remedies for the client due to failure to give proper notice of defects or forfeiture of the guarantee, with divergent interpretations between the defects notification period under art. 367 CO and the derogation regime agreed under norm SIA 118.
- Administrative / Acceptance: Withholding the return of the guarantee deed at the end of the two-year warranty period due to the lack of a joint inspection report drawn up by the site management, preventing closure of the final account under norm SIA 118 and art. 371 CO.
On construction sites governed by Swiss rules, the financial performance guarantee is a decisive contractual cornerstone for site management, the client and successful contractors. In Swiss contracting practice, the retention on advance payments is very frequently converted, upon the provisional or final account, into a joint and several guarantee issued by a bank or insurance institution subject to Swiss financial supervision. Governed by norm SIA 118 and the rules of the Code of Obligations (CO), this mechanism protects the client against defects without excessively constraining the operational liquidity needed to carry out the works.
Setting a standard rate between 5% and 10% of the total remuneration demands absolute rigor in document management for release deadlines. From formal acceptance to the expiry of the two-year complaint period, and then throughout the five-year liability period for hidden defects under art. 371 CO, each stage requires joint inspections formalized by the site management. This technical guide outlines the rules for calculating the security, the legal review of bank guarantee deeds under art. 492 CO, and the strict protocols governing the full release of the instrument or its enforcement.
Determining the joint and several guarantee amount and calculation basis
The joint and several guarantee provided for by norm SIA 118 serves to secure performance of the work and cover any defects identified. In accordance with established practice in works contracts and standard contract documents, the financial guarantee amount ranges between 5% and 10% of the total remuneration for the work. Swiss practice generally adjusts this rate depending on the nature of the works and the financial scale of the package.
For structural work packages (CFC 211) or complex building services packages, a 10% rate is routinely required when the total amount does not exceed a predefined contractual threshold, whereas a 5% rate frequently applies to higher amounts or architectural finishes packages. The calculation is based on the final account approved by the site management, including approved change orders and settled daywork, inclusive of Swiss VAT at 8,1%.
Contractually, this mechanism constitutes a security governed by art. 492 CO. Through this deed, the banking institution or Swiss financial protection insurance company commits jointly and severally to the client to settle sums due up to the guaranteed amount should the contractor default. The guarantee replaces the advance payment retention that the client deducts from interim payment claims under norm SIA 118, releasing operating cash flow back to the contractor.
Period of validity and timeline structuring of the guarantee
The validity of the joint and several performance guarantee is directly tied to the defects regime defined in the works contract. Under norm SIA 118, formal acceptance marks the start of the 2-year defects notification period. During this initial 2-year period, the client can report defects at any time without having to observe a short notice window. The guarantee secures the contractor's obligation to remedy identified imperfections at its own expense.
When this initial 2-year phase expires, a joint final inspection is held. If all notified defects have been remedied and recorded in the joint inspection report, the joint and several guarantee reaches its standard expiry. However, the works contract remains subject to the statutory five-year limitation period for defects in immovable structures applicable to the contractor, architect, or engineer under art. 371 CO. In certain major contracts, the parties stipulate that a reduced guarantee, for instance between 2% and 5%, be maintained from the third to the fifth year to cover hidden defects.
Under the revised Code of Obligations, art. 367 CO provides that for an immovable work, the client has 60 days to report defects after discovering them, any contractual clause stipulating a shorter period being null and void. The site management must therefore ensure that the guarantee deed issued by the guarantor contains an expiry date consistent with these timing rules, lest the security lapse before the formal clearance of all notices of defects.
Substantive and formal conditions for releasing the guarantee
Releasing the guarantee deed cannot be done unilaterally. It requires a formal declaration issued by the client or by the site management authorized under agency rules pursuant to art. 32 CO. Three cumulative conditions must be satisfied before returning the guarantee deed or sending the discharge notice to the guarantor:
- Full completion of the contractual works and drafting of the final account approved by both parties, in accordance with the meeting of minds governed by art. 1 CO.
- Conducting the 2-year end-of-warranty inspection under norm SIA 118, documented in a joint inspection report signed by the client, the local site management and the contractor.
- Effective remediation of all defects listed in the punch list, verified on the completed work.
Where defects remain and the contractor fails to carry out the required rectifications, the client may set a reasonable time limit to perform in a bilateral contract under art. 107 CO. If this time limit lapses without result, the client is entitled to have the repairs executed by a third party at the defaulting contractor's expense and call on the bank guarantee to cover the resulting costs.
Comparison table: financial guarantee arrangements on Swiss construction sites
| Type of security | Contractual basis | Cash flow impact | Release procedure | Main risk |
|---|---|---|---|---|
| Retention on advance payments (10%) | Standard SIA 118 | Direct deduction from contractor's monthly payment claims | Approved final account or replacement by guarantee deed | Dispute over the final balance due under art. 372 CO |
| Joint and several bank guarantee (5% to 10%) | Norm SIA 118 and art. 492 CO | Bank credit line encumbered by periodic commissions | Written release certificate issued by the client | Calendar expiry of the instrument before the 2-year inspection |
| Specialized insurance surety bond | Norm SIA 118 and art. 492 CO | Preservation of the company's operating credit lines | Formal discharge or return of the original policy | Denial of coverage due to non-compliant bond wording |
| Blocked deposit in escrow account | Agreement of the parties and art. 1 CO | Tying up net liquid assets in Swiss francs (CHF) | Joint release instruction signed by both contracting parties | Prolonged freeze in the event of an unresolved technical dispute |
| Extended reduced guarantee (years 2 to 5) | Special conditions and art. 371 CO | Moderate financial burden to cover hidden defects | Expiry of the five-year limitation period for immovable structures | Unjustified retention of security without any reported defect |
Recurring management mistakes and quantified financial impacts
Site supervision experience highlights recurrent administrative and contractual mistakes surrounding joint and several guarantees. A frequent site management error is accepting a bank guarantee deed with an automatic expiry clause set to a fixed date, such as 24 calendar months after the theoretical completion date. If the construction site is delayed or the end-of-warranty inspection is postponed, the guarantee lapses automatically without the client being able to call on the guarantor. On a 1 200 000 CHF masonry package, the outright loss of a 10% guarantee represents 120 000 CHF that cannot be recovered from the insurer in the event of the contractor's subsequent bankruptcy.
A second issue involves improperly holding onto the guarantee instrument after all punch list items from the 2-year inspection have been fully resolved. If the client delays release without legitimate grounds, the contractor incurs unnecessary quarterly bank commission fees and restricted bonding capacity. The debtor placed in default by a formal notice from the creditor under art. 102 CO can claim damages caused by this contractual non-performance under art. 97 CO, triggering cross financial claims.
A third shortcoming lies in failing to verify signatory powers on the deed issued by the financial institution. Omitting to check representation authority under art. 32 CO may render the guarantor's commitment void. Finally, confusing the performance guarantee with the warranty period guarantee sometimes leads to mistakenly returning the good performance bond as soon as the building is occupied, leaving the client without liquid security throughout the first 2 years of operation.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The amounts and situations presented below are illustrative examples designed to clarify how the contractual rules apply.
Scenario 1: Residential building in the Canton of Vaud (Nyon District)
On a project involving the construction of three multi-family residential buildings totaling 36 condominium units (art. 712a CC), the structural work package (CFC 211) is awarded to a general contractor from Vaud for a contract sum of 4 800 000 CHF excluding taxes. The works contract incorporates norm SIA 118. The company deploys an average workforce of 18 workers on site.
The contract specifies a 10% retention on each monthly advance payment until acceptance of the work, replaceable upon the final account by a 5% joint and several bank guarantee, amounting to 259 440 CHF including Swiss VAT at 8,1%. Acceptance takes place with notes of hairline cracks on balcony slabs and isolated waterproofing defects at door thresholds. During the joint 2-year inspection, two residual water leaks in the underground parking garage are detected. The site management refuses to release the guarantee until the resin injections have been formally inspected and accepted. The contractor completes the work within three weeks. A punch list clearance report is drawn up, enabling the client to issue the formal letter releasing the guarantee in full to the guaranteeing cantonal bank.
Scenario 2: Major refurbishment of an administrative building in the canton of Geneva
As part of the refurbishment of an office building in central Geneva, the ventilation and air conditioning installation package (CFC 244) is awarded to a building services firm for a total lump sum of 850 000 CHF. The team consists of 6 specialist fitters. The applicable KBOB contract stipulates a 10% performance guarantee, representing 91 885 CHF including VAT, issued by a recognized Swiss insurance company.
At the end of the 2-year operating period, the technical inspection reveals airflow balancing non-conformities resulting in acoustic levels exceeding permitted tolerances. Site management sends written notification to the installer and serves a copy of the notice of defects on the guarantor insurer to eliminate any risk of forfeiture. As the installer fails to take action within the set 30-day period, the client brings in a third-party contractor for a remediation cost of 28 500 CHF. The insurer pays this amount to the client upon simple presentation of the substitute invoices certified as compliant by site management, and the balance of the joint and several guarantee is then released to the original firm once the dispute is closed.
Contracts and SIA 118: free tools
Advance payments and retentions, surety bonds, price escalations, daywork reports, subcontractor monitoring.
Frequently asked questions
What rate applies to the joint and several guarantee under standard SIA 118?
Standard SIA 118 specifies a customary indicative rate of 10% for amounts under 300 000 CHF, and 5% beyond that threshold. The deed is based on the guarantee defined in art. 492 CO. Site management ensures that the guarantee covers the works until the final account.
What is the exact period of validity of a performance bond?
The certificate covers the execution phase and then the two-year defect notification period following acceptance. For immovable works, the limitation period under art. 371 CO is five years, leading practitioners to align the expiry date of the bank certificate with these milestones.
Can a cash retention replace a guarantor's certificate?
Yes. The client may withhold the amount from advance payments under the works contract (art. 363 CO). As soon as the contractor provides a bank or insurance bond compliant with art. 492 CO, site management orders the release of the withheld funds, for example 25 000 CHF on a work package.
At what precise moment must the client release the deed of guarantee?
Release takes place after the expiry of the two-year defect notification period and the clearance of reported reservations. If the client asserts rights under art. 368 CO (remediation or price reduction), the guarantee remains bound for the residual value of the disputed work estimated by quote.
Does the bankruptcy of the contractor allow direct claims against the guarantor?
Absolutely. Under art. 492 CO governing guarantees, the formal insolvency of the debtor entitles the creditor to claim payment of the collateral from the financial institution. Local site management then submits the inventory of uncorrected defects and the account of remediation costs incurred through third parties.
Can the guaranteed amount be reduced before the final two-year term expires?
The parties may agree on a partial reduction following the joint acceptance inspection, for example by lowering the guarantee from 50 000 CHF to 25 000 CHF. This contract amendment (art. 1 CO) remains optional and requires the formal agreement of the client and their guarantor.
Rigorous management of financial guarantees and notification deadlines forms the cornerstone of asset protection for any client in Switzerland. To explore acceptance protocols, defect tracking and the contractual structure of liabilities in greater depth, consult the specialized resources on the portal:
- Warranty Site Management in Switzerland: 2-Year / 5-Year Deadlines, Surety Bonds and Latent Defects (SIA 118 / CO 2026)
- 2-Year Defect Notification Period (SIA 118) vs 60-Day Notice Period in Revised CO 2026: Burden of Proof
- Joint Inspection Prior to the 2-Year Warranty Expiry: Full Protocol to Safeguard the Client's Rights
- Hidden Defects Between Years 2 and 5 (SIA 118 / CO 2026): Rules for Valid Notice