Practical guide

CFC 23–25 Equipment (MEP: Electrical, HVAC, Plumbing): Rig-Mounted Core Drills and Radial Press Tools

Engineering technical guide for CFC 23–25: selecting rig-mounted core drills and radial press tools per Swiss safety requirements and standards.

Table of contents
The 3 Major Site Risks
  1. Financial / Profit margin: Core drilling executed without a rigid guide or a faulty press connection on plumbing networks exposes you to water damage claims with corrective costs in the range of 15 000 CHF to 50 000 CHF, triggering liability for repairs under art. 368 CO and responsibility for work tools under art. 364 CO.
  2. Legal / Joint bodies / SUVA: Failure to comply with occupational prevention and health protection rules breaches art. 82 LAA and art. 3 OPA, while drilling dust requires air quality management under art. 33 OTConst. In the event of a deliberate disregard of technical rules endangering others, art. 229 CP applies.
  3. Administrative / Acceptance: Concealed pipework that does not follow the recognised rules of the trade or core drillings that weaken the load-bearing structure without the structural engineer's approval result in a formal refusal of the minutes during the acceptance of the work under standard SIA 118, blocking advance payments from the site management.

This technical guide is intended for plumbing, heating, and electrical installers working on Swiss finishing worksites under chapters CFC 23, CFC 24, and CFC 25. Penetrations through reinforced concrete slabs or shear walls as well as pressurised pipe connections require rigorous selection of power tools. The sizing of diamond core drilling on drill rigs and the use of electro-hydraulic radial press tools must satisfy the requirements for structural precision, hydraulic tightness, and safety established by the recognised rules of the trade in Switzerland.

Contractors and installation supervisors must incorporate occupational health constraints right from the site logistics preparation phase. Vacuuming mineral slurry or dust, securing core drill rig stability, and routinely calibrating pressing jaws ensure installation without defects requiring rework. This rigorous approach safeguards the installation firm's profit margins while ensuring exemplary compliance during inspections by local site management and cantonal joint supervisory bodies.

Technical engineering criteria and MEP equipment selection

Sizing the tool inventory for plumbing & sanitary installations, thermal, and electrical works (CFC 23, 24, and 25) addresses physical constraints of mechanical joining and structural penetrations. Procuring a diamond core drill on a rig or an electro-hydraulic radial press tool engages the technical liability of the contractor regarding Swiss recognised trade rules.

Rig-mounted core drills: anchoring, power, and slurry management

Core drilling through reinforced concrete slabs or shear walls for soil stacks and cable looms leaves no room for handheld drilling above diameters intended for small anchor holes. As soon as the drilling diameter exceeds standard discharge pipe dimensions, mounting on a rigid rig becomes mandatory to stabilise the diamond core bit and prevent mechanical jamming.

Three parameters govern the selection of the drill rig and motor unit:

  • Rig anchoring method: Mechanical fastening using drop-in metal anchors remains the benchmark method on rough or uneven concrete surfaces. Vacuum pad fastening with a vacuum pump is suitable exclusively on smooth, flat surfaces free of through-cracks, provided the vacuum pressure gauge is monitored constantly. In case of accidental loss of vacuum, a safety chain or prop must prevent the drill column from tipping.
  • Water flow regulation and slurry collection: Wet diamond core drilling lubricates the segments and binds mineral dust. The equipment must include a slurry collector ring connected to an industrial wet and dry vacuum cleaner. This recovery protects reinforcing rebar and prevents slurry seepage to lower storeys. Indeed, art. 17 OTConst mandates safety measures at workstations and passageways to ensure falling materials or components do not endanger workers.
  • Mechanical clutch and thermal overload protection: A core bit jamming against dense rebar generates severe rotational torque. The motor unit must integrate a mechanical friction slip clutch and electronic cut-out triggered in milliseconds to protect the drive train and the operator.

Radial press tools: axial thrust, jaws, and digital traceability

Cold radial pressing technology has superseded brazing and autogenous gas welding across potable water distribution and hydronic heating systems. Water-tightness relies on the combined plastic deformation of the metal press fitting sleeve and the core pipe structure, whether synthetic, multilayer, or copper.

Engineering criteria for electro-hydraulic press tools include:

  • Constant thrust force: Professional tools deliver a calibrated linear axial thrust (typically 19 kN for compact tools intended for small diameters, and 32 kN for larger commercial diameters). The tool must feature a piezoelectric pressure sensor that prevents piston retraction until the final target pressure is reached.
  • Press jaw compatibility and geometry: Using a pressing jaw with an unsuitable profile for the fitting compromises long-term tightness. The installer must verify the exact match between the die profile and the fitting manufacturer's technical specifications. Art. 365 CO notes that the contractor is liable for the sound quality of materials supplied and must immediately notify the client of any factor compromising the proper performance of the work.
  • Electronic cycle recording: Modern press tools record every press cycle in a time-stamped internal memory. This digital log certifies that the complete stroke was executed without interruption, providing hard evidence during technical acceptance procedures.

Comparison table of MEP drilling and joining equipment

Equipment or variantTechnical or safety referenceTypical use on the construction siteMandatory inspection checkpoints
3 000 W rig-mounted diamond core drillart. 82 LAA (prevention measures per the state of the art)Vertical penetrations for CFC 250 soil stacks (diameter 110 to 200 mm)Rig base anchoring, laser centring, water cooling flow rate, slurry collection ring
Handheld dry core drill with soft impactart. 33 OTConst (air quality and dust extraction)Horizontal masonry penetrations for CFC 232 electrical conduitsContinuous industrial vacuum extraction, diamond segment integrity, safety slip clutch
32 kN electro-hydraulic radial press toolart. 364 CO (provision of required tools and recognised rules of the trade)Domestic hot/cold water distribution and heating risersComplete cycle indicator, jaw profile compliance, drive roller wear inspection
19 kN compact cordless press toolart. 22 OLT 3 (constructive measures against vibration)Terminal connections in tight utility shafts and floor-level sanitary distributionTool weight, battery charge level, mechanical locking of the jaw retaining pin
Slurry collection and recycling systemart. 17 OTConst (protection against falling materials)Drilling works in occupied premises or on rough upper floor slabsDiaphragm seal condition, vacuum unit suction power, collection tank tightness

Common operational mistakes and financial impacts

Failing to follow tool setup procedures on technical installation construction sites leads to operational cost overruns and major contractual disputes. Rigorous enforcement of the Swiss Code of Obligations (CO) governs these failures.

Three recurring defects illustrate these operational failures:

  • Large-diameter handheld drilling without a guide rig: Attempting to core a concrete wall by hand beyond recommended diameters exposes the operator to severe kickback if the core bit binds. This practice produces an out-of-round hole and premature diamond segment failure. If load-bearing rebar is severed accidentally without prior approval from the structural engineer, structural repair costs using bonded carbon fibre strips run between 4 500 CHF and 12 000 CHF. Art. 364 CO requires the contractor to carry out the work with care and supply the appropriate tools.
  • Mismatch between jaw profile and press fitting: Using a pressing jaw profile with a different geometric contour on a dedicated fitting compresses the O-ring asymmetrically. Although an immediate cold-water pressure test may appear successful, thermal expansion under hot water service causes micro-leaks after several months of operation. Art. 367 CO grants the client a 60-day period to give notice of defects in an immovable work upon discovery. Opening utility shafts, technical drying, and full repairs commonly cost between 15 000 CHF and 35 000 CHF.
  • Neglected lubrication and defective slurry extraction: Core drilling without efficient suction clogs motors and spreads alkaline slurry across lower levels. Beyond accelerated equipment wear, restoring soiled surfaces generates backcharges and cleaning penalties between 1 200 CHF and 3 000 CHF. Furthermore, under art. 366 CO, if contractor delays jeopardise timely completion, the client may exercise contractual remedies without waiting for the scheduled deadline.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following situations are illustrative examples designed to analyse equipment choices on Swiss construction sites.

Typical Scenario 1: Major refurbishment of a commercial complex in Lausanne (Vaud)

In a 1970s office building, a plumbing installation contractor (CFC 250) must route new vertical soil stacks through four reinforced concrete slabs, each 28 cm thick. The allocated site crew consists of three installers.

The technical supervisor rules out handheld drilling in favour of a 3 000 W diamond core drill mounted on a rigid rig. The column base is anchored using through-bolts with threaded rods and clamping plates, eliminating any deflection under rotational torque. To comply with cleanliness requirements and protect the premises below, the team installs a water collector ring connected to an industrial wet vacuum. The 160 mm openings are drilled without axial deviation, allowing direct installation of certified firestop collars without patching work.

Typical Scenario 2: Minergie multi-family housing development in Fribourg

An HVAC and plumbing contractor is installing underfloor heating distribution and multilayer pipe risers across a 24-unit housing scheme. The team consists of four installers deployed across two building blocks.

To guarantee the durability of connections embedded within floor screeds, the firm standardises its fleet on 32 kN radial press tools fitted with an automatic cycle lock and data logger. Every installer receives a set of jaws inspected annually and calibrated to the selected fitting profile. Electronic traceability built into the machines provides certified proof that every one of the site's 1 400 press joints was executed correctly during pressure testing coordinated with the site management, eliminating any risk of subsequent remedial work under art. 368 CO.

Free construction site calculators

Thirty-five trade calculators: site installations, waste, concrete, screeds, insulation, scaffolding. No sign-up required.

View trade calculators

Frequently asked questions

What is the contractual status of unplanned core drillings in concrete slabs?

Under standard SIA 118, an unforeseen opening constitutes a change order. The contractor applies art. 365 CO by notifying the client if the rebar compromises execution. In the event of a financial dispute without prior agreement, remuneration is calculated according to art. 374 CO, allowing for costs in the region of 350 CHF per additional penetration.

How should radial press fitting tool maintenance be logged under Swiss law?

To comply with art. 82 LAA and the OMach, RS 819.14, the installer maintains a technical logbook for the pressing jaws. If an unpressed fitting leaks after acceptance, the client is entitled to demand repair under art. 368 CO. The five-year contractual liability for an immovable work stems from art. 371 CO.

What safety requirements apply to core drilling near a floor opening?

To prevent falls from height, the contractor applies art. 25 OTConst regarding openings in floors. If it is technically impossible to install a load-bearing cover, art. 29 OTConst requires equivalent measures determined by a specialist. Art. 229 CP penalises endangering life and limb through violation of the recognised rules of the trade.

Who is responsible for organising protection against mineral dust and drilling slurry?

The employer ensures ambient air quality pursuant to art. 33 OTConst by removing or filtering dust. Art. 18 OLT 3 addresses air pollution at the workstation. Art. 364 CO requires the installer to provide capture equipment, including an industrial wet vacuum cleaner estimated for illustrative purposes at around 1'400 CHF.

How should noise and vibrations from MEP equipment be managed on the construction site?

Art. 22 OLT 3 addresses the prevention of noise and vibrations. If noise exposure exceeds the limit value, hearing protection is required under art. 36 OTConst. Art. 27 OLT 3 governs personal protective equipment. The employer applies art. 3 OPA to adopt recognised safety rules.

What qualifications must the site management have regarding core drilling safety?

Art. 5 OTConst requires the designation on each construction site of a competent safety officer who is authorised to issue directives and remove anyone posing a danger. If an anchoring failure knowingly endangers the life of others, criminal penalties apply under art. 229 CP for deliberate breach of the recognised rules of the trade.

Engineering summary and technical resources for building services sites

Installing technical building services requires rigorous coordination between heavy core drilling and pressed fittings in compliance with Swiss standards. Anticipating pull-out risks, filtering particulate matter, and conducting regular metrological monitoring protect the firm's margins against works contract requirements. To consolidate your skills, assess your equipment fleets, and refine your safety plans, consult our specialised guides: