Skip to content
Sign in Sign up
Categories
Power tools DrillsScrewdriversGrindersSaws Measure Laser levels Protection Protective equipment Site Ladders and stepladdersHand tools
Support
Change language: French
Tool and user guide

Diamond Blade Compatibility Matrix: Choosing Between Soft and Hard Bonds Based on the Material Cut

Optimise your on-site cuts in Switzerland with our diamond blade compatibility matrix. Choose the right bond for every material (EN 13236).

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: An unsuitable bond leads to premature diamond blade wear, causing consumable cost overruns of around 40 % and reduced output, in breach of the works contract (CO).
  2. Legal / Joint Body / SUVA: A blade that does not comply with standard EN 13236 Safety requirements for superabrasives exposes workers to flying debris. The employer must plan the work so that the risk of accidents is as low as possible (art. 3 OTConst).
  3. Administrative / Acceptance: Imprecise cuts cause aesthetic defects. The client may demand rectification under standard SIA 118, delaying joint inspection and handover of the works.

Selecting a diamond blade on a Swiss construction site relies on one fundamental principle: opposing hardness. To ensure an effective cut, a hard material (reinforced concrete, granite) requires a soft bond. This bond wears away steadily, continuously exposing fresh, sharp diamonds. Conversely, an abrasive material (asphalt, brick) demands a hard bond to hold the diamonds firmly and prevent premature wear of the cutting rim. Overlooking this compatibility matrix undermines sawing profitability and puts extra mechanical strain on power cutters.

Operator safety and compliance with standard EN 13236 Safety requirements for superabrasives depend on getting this match right. Inappropriate tooling produces excessive vibration, hazardous overheating, and increased dust emissions. The Swiss Construction Works Ordinance (OTConst) requires site management and employers to plan operations rigorously to minimise health hazards. The configuration tool below instantly determines the appropriate bond type for your substrate, keeping your operating costs in CHF under control while complying with prevention guidelines.

Algorithms and normative criteria of the selection matrix

The configurateur relies on an algorithm that matches the abrasiveness index of the material to be cut with the resistance index of the blade's metallic bond. The objective is to maintain constant sharpening. The tool integrates the requirements of standard EN 13236 Safety requirements for superabrasives to ensure the cutting rim's mechanical strength under friction loads. In addition, according to the guidelines in the SUVA Cut-Off Saws publication, selecting the right blade cuts vibration and kickback risks. Legally, the employer must take protective arrangements and measures that meet the provisions of the ordinance, other applicable occupational safety regulations, and recognised safety and occupational medicine rules (art. 3 OPA). The algorithm uses an abrasiveness rating from 1 (dense, hard material) to 10 (highly granular material). The bond is rated on an inverse hardness scale. The matching formula targets an optimal wear ratio where the metal matrix releases the diamond at the exact moment it becomes dull.

Comparative performance table based on opposing hardness

This table details estimated performance based on pairing substrate and consumable. Values are indicative and depend on machine power.

Material to cut (construction site) Recommended bond type Estimated cutting speed (cm²/min) Average service life (m²) Estimated unit cost (CHF excl. VAT)
Heavily vibrated reinforced concrete Soft bond 350 120 185.00
Granite and hard natural stone Very soft bond 280 90 210.00
Asphalt and bituminous surfacing Hard bond with protective segments 500 250 160.00
Sand-lime brick Medium-hard bond 450 200 145.00
Green concrete or concrete blocks Hard bond 480 220 155.00

Full financial optimisation calculation example

The impact of a poor technical choice immediately translates into a financial loss. Take the example of a firm needing to cut 250 square metres of asphalt for a utility trench. If site management mistakenly approves using a soft-bond blade (designed for concrete), the extreme abrasiveness of the asphalt will strip the metallic matrix in just a few hours. The blade will be ruined after cutting only 50 square metres.

Calculation with the wrong blade (soft bond):
Total requirement: 5 blades (250 m² / 50 m²).
Unit cost: 185.00 CHF excl. VAT.
Total tool cost: 925.00 CHF excl. VAT.

Calculation with the blade recommended by the tool (hard bond):
Total requirement: 1 blade (service life of 250 m²).
Unit cost: 160.00 CHF excl. VAT.
Total tool cost: 160.00 CHF excl. VAT.

Invoicing breakdown for the optimal solution:
Total consumables excl. VAT: 160.00 CHF
Swiss VAT (8,1 %): 12.96 CHF
Total incl. VAT: 172.96 CHF

Savings achieved on a single section amount to 765.00 CHF excl. VAT, without factoring in time saved by avoiding blade changes and reduced operator fatigue.

Illustrative practical cases (typical scenarios on Swiss construction sites)

These figures and scenarios are illustrative examples developed to show how the matrix works, not actual construction sites.

Scenario 1: Cutting reinforced concrete slabs (Canton of Vaud)

Context: A masonry firm is working on the refurbishment of a viaduct. Four masons are deployed on site. The substrate to cut is aged concrete, extremely hard and heavily reinforced.
Choice selected by the configurator: Soft-bond blade with a high concentration of premium diamonds.
Technical and legal rationale: Hard concrete polishes the diamonds. If the bond were too tough, the segments would glaze over, and the blade would overheat and stop cutting. The soft bond wears away against the concrete, continuously exposing fresh cutting edges. This choice ensures compliance with the SUVA Cut-Off Saws publication by preventing blade glazing—a phenomenon that often forces the operator to push too hard, dramatically raising the risk of fatal kickback or steel core failure.

Scenario 2: Trench opening in asphalt (Canton of Fribourg)

Context: Resurfacing of a municipal road requiring a long trench opening. The crew comprises three road workers. The bituminous surfacing is particularly coarse and abrasive.
Choice selected by the configurator: Hard-bond blade fitted with dedicated protective segments against undercutting.
Technical and legal rationale: Asphalt acts like sandpaper on the metal matrix. A soft bond would wear away immediately. The hard bond retains the diamonds for as long as possible. The deeper protective segments prevent abrasive slurry from scouring the steel core beneath the diamond segment. This setup stops segments from tearing off at full speed, ensuring strict compliance with standard EN 13236 Safety requirements for superabrasives and protecting workers from flying fragments.

00:00 - 00:15 AI Avatar: "Blades wearing out too fast or glazing over? The wrong bond is the culprit."
00:15 - 01:10 Screen and Diagrams: "Matrix demonstration. Selecting reinforced concrete. The tool recommends a soft bond. Visual explanation of diamond release based on bond hardness and standard EN 13236 Safety requirements for superabrasives."
01:10 - 01:30 AI Avatar: "Use our free configurator below and train your crews on our Academy."

Free construction site calculators

Thirty-five trade calculators: site installations, waste, concrete, screeds, insulation, scaffolding. No sign-up required.

View trade calculators

Frequently asked questions

Which bond should you choose for very hard reinforced concrete?

For hard materials, choose a soft bond. It exposes new diamonds quickly, preventing overheating and ensuring safety under standard EN 13236 Safety requirements for superabrasives.

Why does my blade wear down so fast on asphalt?

Asphalt is abrasive. Using a soft bond causes rapid wear. A hard bond holds the diamonds longer, optimising your illustrative costs estimated at 150 CHF per blade.

What does the Construction Works Ordinance say about dust?

Art. 33 OTConst requires hazardous substances to be extracted, filtered or ventilated. Using water suppression or vacuum units is required to maintain air quality at the workstation.

How can you prevent an unsuitable blade from bursting?

Employers must supply suitable equipment under art. 82 LAA. Comply with maximum operating speeds and the recommendations in the SUVA Cut-Off Saws publication to avoid any risk of blade failure.

Can you use a universal blade for all materials?

This is not recommended for heavy-duty use. While cost-effective, a universal blade cuts output and raises risks. Choose a specific matrix to meet standard trade practices.

What protective gear is mandatory when using a petrol cut-off saw?

Art. 36 OTConst mandates hearing protection. Safety goggles, a respirator and safety gloves are also required by safety guidelines.

Optimise your cutting operations

Choosing between a soft and hard bond ensures both profitability and safety. The wrong choice causes premature wear or glazing. Use our interactive tool to identify the exact configuration for your Swiss construction site.

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.