Tool and user guide

Swiss Construction Site Vacuum Selector (Class L, M or H / HEPA H14) based on Dust & SUVA VLEP

Select your construction site vacuum (Class L, M, H) based on Swiss VLEP & SUVA factsheets. Avoid quartz and asbestos work stoppages.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Purchasing an unsuitable vacuum cleaner (Class L instead of M) requiring an emergency repurchase of around 1'500 to 3'000 CHF per machine, impacting profitability.
  2. Legal / Joint bodies / SUVA: Work stoppage on the construction site if Swiss VLEP thresholds are exceeded, in breach of art. 33 OTConst (removal of hazardous substances) and art. 82 LAA (mandatory preventive measures).
  3. Administrative / Acceptance: Delivery delay due to suspension of works for non-compliance, jeopardising deadlines under the contract for work and services pursuant to the Code of Obligations (CO).

Choosing a construction site vacuum in Switzerland goes far beyond simple suction power. With the risks of inhaling fine dust (quartz, wood, asbestos), requirements have tightened. Companies must select systems certified under standard EN 60335-2-69. The division into three categories (Class L for low risk, Class M for medium risk, Class H with HEPA H14 filter for high risk) determines the compliance of your work. Inappropriate equipment exposes workers to respiratory damage and puts the employer in breach of federal occupational health and safety legislation. Controlling these emissions at the source is an absolute priority on modern Swiss construction sites.

To protect workers' health, art. 33 OTConst requires hazardous substances to be effectively removed or filtered. Inspectors routinely verify that the dust generated matches the vacuum class, in line with Swiss VLEP. This interactive selector instantly determines the mandatory extraction class by cross-referencing your materials with the SUVA Quartz and Asbestos factsheets. By identifying the right equipment during work preparation, you secure your processes and avoid costly disruptions during unannounced inspections. Using a suitable extraction system also ensures a cleaner working environment, thereby reducing final cleaning time before handover of the works to the client.

Transparency of Swiss algorithms and standard criteria

The calculation engine of our selector strictly complies with the requirements of standard EN 60335-2-69 and the prevention guidelines issued by the SUVA Quartz and Asbestos factsheets. The algorithm cross-references the nature of the processed materials with Workplace Exposure Limits (Swiss VLEP) to determine the mandatory filtration class. Pursuant to art. 33 OTConst, ambient air at workstations must not exceed limit values for hazardous substances; these must be evacuated to the open air, filtered, or diluted. The tool assesses the volume of dust generated per hour and applies a dispersion coefficient specific to power tools (angle grinders, saws, wall chasers).

To guarantee compliance with art. 3 OPA, which requires employers to take protection measures and precautions that meet recognised technical standards, the selector includes an automatic alert as soon as the theoretical concentration of respirable quartz dust approaches the Swiss VLEP. The system then immediately recommends switching to a Class M vacuum cleaner, fitted with an automatic airflow monitoring system ensuring a minimum extraction speed inside the hose.

Comparison table of dust extraction classes (EN 60335-2-69)

The technical classification determines the unit's capacity to retain fine particles before exhausting air back into the working environment.

Dust extraction class Required filtration efficiency Corresponding Swiss VLEP Typical dust types Specific technical requirements
Class L (Low) > 99 % > 1 mg/m³ Plaster, soil, domestic dust Standard filter, straightforward disposal
Class M (Medium) > 99,9 % > 0,1 mg/m³ Wood, concrete, cement, quartz, brick Low airflow alarm (20 m/s)
Class H (High) > 99,995 % (HEPA H14) < 0,1 mg/m³ Asbestos, lead, mould, mineral fibres HEPA H14 filter, sealed safety filter bag
Minimum air velocity Not applicable (L) 20 m/s (M and H) All harmful dusts Mandatory electronic monitoring
Waste disposal Paper or non-woven fleece bag Low-dust plastic disposal bag Safety filter bag with outer transport bag Disposal procedure without dispersion

Financial modelling: Investment calculation example

Purchasing compliant equipment represents an initial outlay that prevents construction site stoppages and protects workers' health. Here is a financial model for equipping a masonry team requiring Class M extraction for concrete chasing and surfacing.

  • Purchase of 3 certified Class M vacuum cleaners: 3 x 850,00 CHF = 2'550,00 CHF excl. VAT
  • Consumables package (disposal bags and spare filters for 6 months): 450,00 CHF excl. VAT
  • Investment subtotal: 3'000,00 CHF excl. VAT
  • Application of Swiss standard VAT rate (8,1 %): 3'000,00 CHF x 0,081 = 243,00 CHF
  • Total investment cost: 3'243,00 CHF incl. VAT

This calculation shows that achieving compliance remains financially manageable, especially when set against the costs of a work stoppage ordered by inspection authorities for failure to implement prevention measures.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and situations below are illustrative examples designed to demonstrate the application of the standards, and under no circumstances represent actual construction sites or existing companies.

Scenario 1: Renovation of concrete surfaces (Canton of Vaud)

A team of 4 workers is sanding concrete slabs in an enclosed space. The material generates a high concentration of quartz dust. The employer must plan the work so that health risks are kept as low as possible. By entering these parameters (sanding, concrete, enclosed space) into the selector, the algorithm flags a potential breach of the Swiss VLEP for quartz. The result mandates a Class M vacuum cleaner. This technical choice satisfies the requirements of the SUVA Quartz factsheets and ensures hazardous substances are filtered properly, preventing harmful dispersion into the ambient air.

Scenario 2: Remediation of plant rooms (Canton of Valais)

During preparations for work on pipework, a team of 3 fitters suspects the presence of asbestos gaskets. Pursuant to art. 32 OTConst, if the presence of substances that are particularly harmful to health, such as asbestos, is suspected, the employer must identify and assess the hazards. The selector tool, set to the asbestos hazard, immediately locks the recommendation to a Class H vacuum cleaner fitted with a HEPA H14 filter. Using a Class L or M unit in this context would expose workers to fatal fibres and constitute a serious breach of occupational health and safety rules. The system also reminds users that work releasing significant amounts of asbestos fibres may only be carried out by recognised asbestos removal contractors.

00:00 - 00:15 (AI Avatar): A Class L vacuum cleaner for concrete? Quartz dust threatens both health and site profitability.

00:15 - 01:10 (Screen and Diagrams): Selector demonstration. Enter the material. The tool cross-references the data against Swiss VLEP and standard EN 60335-2-69. View filtration performance between Classes M and H. The diagram illustrates the air filtration required by the OTConst.

01:10 - 01:30 (AI Avatar): Do not risk work stoppages any longer. Use our free tool to select compliant equipment and protect your teams.

Free construction site calculators

Thirty-five trade calculators: site installations, waste, concrete, screeds, insulation, scaffolding. No sign-up required.

View trade calculators

Frequently asked questions

Is a Class L vacuum cleaner sufficient for sanding plaster on a Swiss construction site?

No, plaster generates fine dust. The employer must filter the air according to the Construction Works Ordinance. SUVA requires Class M. Illustrative cost: 800 CHF.

What should be done if asbestos is suspected during renovation before vacuuming?

Art. 32 OTConst requires identifying hazards if asbestos is suspected. Conventional vacuuming is prohibited. Asbestos removal requires a CNA-recognised specialist firm pursuant to art. 82 OTConst.

What are the penalties for using a vacuum cleaner that does not comply with VLEP?

The employer risks a site shutdown. In the event of intentional endangerment of human life, art. 229 CP provides for a custodial sentence or a monetary penalty.

How do you comply with art. 33 OTConst when sawing concrete indoors?

Art. 33 OTConst requires hazardous substances to be evacuated, filtered or diluted. A Class M vacuum with automatic filter cleaning captures quartz dust in full compliance.

Are HEPA H14 filters mandatory for all wood dust?

No, Class M is sufficient for wood. The employer applies measures dictated by experience under art. 82 LAA. Class H targets highly carcinogenic dusts.

Who is responsible for providing workers with the appropriate construction site vacuum?

Art. 364 CO states that the contractor supplies the necessary tools and equipment. Art. 3 OPA confirms the employer takes measures meeting recognised technical rules.

Secure dust extraction on your Swiss construction sites

Selecting the extraction class—whether L, M, or H—is a strict legal obligation in Switzerland. Proper quartz dust filtration prevents occupational illnesses and penalties. Use our interactive selector to determine the vacuum cleaner that fully complies with SUVA requirements and keep your workers safe.