Clear pricing: the Full Pack or one piece of software à la carte
The Full Pack brings together all the software in the Suite Pro Art Construction, all the modules built into the Suite Pro and the ACIP price database, for the whole team. Do you prefer a single piece of software? Each one has its own, lower price.
Prices in CHF, excl. VATAnnual: 10 months paid out of 12Free 14-day trialHosted in Switzerland
Full Pack — Suite Pro Art Construction
ERP, Portail, Soumissions “Professional tools”, Plans Pro, AI estimate from photos, Academy “Free Boss” and all the modules built into the Suite Pro, including those to come. The complete ACIP price database is included.
14-day trial
To test before you commit
14 days
Free 14-day trial · no bank card
ERP: 14 days, sign-up with no bank card
Portail: 14-day trial, no credit card required
Plans Pro, Soumissions, Academy: 14-day full trial, with no bank card
ACIP price database: demonstration list (fictitious prices) for trial accounts
More than 30 people: custom offer We analyse your needs: the number of people, storage and artificial intelligence adapted to your company. No price is displayed. In your message, state: the number of people, the software you are interested in, the estimated volume of files (in GB) and the planned use of artificial intelligence. Reply within 48 business hours.
Each piece of software has its own price, independent of the others. Choose one from the menu: its plans appear without reloading the page.
Soumissions
Tenders and quote requests: publish, receive and compare offers.
Free 14-day trial Try the professional tools for 14 days with no bank card. The marketplace stays free; without a paid subscription, the ACIP price database shows a demonstration list (fictitious prices).
More than 18 users: custom offer In your message, state: the number of people, the software you are interested in, the estimated volume of files (in GB) and the planned use of artificial intelligence. Reply within 48 business hours.
ERP Pro + Soumissions + Plans Pro Solo cost 258 CHF per month à la carte, compared with 249 CHF for the Full Pack (1 to 5 people): from 3 combined pieces of software, the Pack costs less, and it adds all the modules built into the Suite Pro and the complete ACIP price database.
Tick at least one piece of software to compare.
Total à la carte
Full Pack Suite Pro
What you gain on top with the Full Pack
All the other software in the Suite Pro included
All Express Modules connected to the Cloud
Complete ACIP price database included
Public prices of each piece of software, at the plan matching the size chosen: ERP Pro for 1 to 5 people, ERP Business beyond that (Portail included); Plans Pro at the per-user price with ERP Business; Academy in 12 monthly payments.
Frequently asked questions
How does activating an offer and payment work?
The Full Pack is paid online on its own page: credit card, PayPal or bank transfer. Once payment is confirmed, access opens in each software using your Art Construction account address. For a-la-carte software, open its page in the "A la carte" section.
What are the reasonable use rules (storage of large files and AI)?
Reasonable use: large files and artificial intelligence functions have monthly limits included, designed for normal use. Beyond that, we offer you an option or a custom offer.
Which modules are included in which software?
The free version of the Art Construction Express Modules stays open to everyone. The paid version (saving per site with versions, export in the company’s colours, ACIP price suggestions, sending to the quote) is included in the ticked software.
Module
Soumissions
ERP Pro and Business
Portail
Plans Pro
Take-Off and measurement on PDF plans
✓
–
–
✓
SIA 451 tender reader and editor
✓
–
–
–
3D BIM-IFC viewer and inspector
–
–
✓
✓
Geo-Scanner for land parcels
–
✓
✓
–
2D site installation plan
–
–
✓
–
Gantt schedule (OTConst, SUVA)
–
–
✓
–
Hourly cost simulator
–
✓
–
–
Wall section (U-value, Glaser)
✓
✓
–
–
Insulation (thermal, moisture, acoustic, fire)
✓
✓
–
–
Site plan, crane and scaffolding
✓
–
–
–
Cutting optimisation and layout planning Paid only
–
✓
–
–
Site statics
coming soon
coming soon
coming soon
–
2D thermal bridges
coming soon
coming soon
coming soon
–
Excavations, slopes and retaining structures
coming soon
coming soon
coming soon
–
Heat pump, neighbourhood noise, solar
coming soon
coming soon
coming soon
–
In the Full Pack, all these modules are open, including those to come.
What happens if my company changes tier during the year?
The Full Pack is paid for a fixed period, one month or one year. To upgrade to a higher tier, write to us: the Pack’s prorata rules are not yet fixed. A la carte: the Portal can be changed at any time from the dashboard (cancellation takes effect at the end of the paid period), as can Plans Pro, on a prorata basis. Tenders is paid for 1 month or 1 year, without automatic renewal.
Can I switch from a single piece of software to the Full Pack?
Yes, write to us before paying for the Pack: we will inform you of the price and conditions. If your subscription to a software runs longer than the Pack, it remains active; the credit rule for the period already paid is not yet fixed.
Can I import my existing data?
Soumissions reads specifications in the SIA 451 format; Plans Pro opens IFC models and exports to PDF, DXF and Excel; the Portail allows a full export of your data. To bring data from another management software into the ERP, write to us before you subscribe.
Where is my data hosted, and is it protected?
The data is hosted in Switzerland. Connections are encrypted (HTTPS). The Portail keeps a 90-day recycle bin and allows a full export.
All prices are in Swiss francs, excl. VAT. VAT is added if it becomes applicable.
“Per year” means 10 months paid out of 12.
The complete ACIP price database is open only to paid subscriptions. Accounts on a free trial have a demonstration list with fictitious prices, clearly marked.