3D check of a timber frame or steel structure in an IFC file before prefabrication

Before starting the joinery or the cutting, compare the IFC model of the frame with the drawings: spacings, spans and openings can be taken in 3D.

Open the free studio →

Free, no account: your files stay in your browser.

In timber framing as in steel construction, the mistake is paid for in the workshop: a truss cut at the wrong spacing or an opening badly placed in a steel section is hard to put right on site. The carpenter or the steel fabricator increasingly receives the engineer's IFC model in addition to the drawings.

The BIM-IFC 3D viewer and inspector studio opens the model in the browser and provides the tools for a visual check: isolate the frame (IfcBeam beams, IfcColumn columns), switch to X-ray, place the section box on a joint and use 3D dimensioning, with snapping to vertices and edges, to take spacings, spans and openings. The inspector displays the section, material and weight of a member where the author has filled them in.

Worked example: 3D check of a timber roof frame before cutting

A carpenter is preparing the gable roof of a villa in French-speaking Switzerland: 12.00 m long, 4 trusses, purlins and rafters. He receives the timber engineer's IFC model and the drawings. Before cutting, he takes six values with 3D dimensioning and compares them with the drawings.

Timber frame: values from the drawings and values taken in the IFC model
Element checkedValue on the drawingValue taken in 3DDifference
Rafter spacing0.60 m0.60 m0.00 m
Length of a rafter5.85 m5.85 m0.00 m
Purlin span4.20 m4.20 m0.00 m
Truss spacing3.60 m3.65 m+0.05 m
Section of the ridge purlin140 × 280 mm140 × 280 mm0 mm
Chimney opening0.50 × 0.50 m0.45 × 0.50 m−0.05 m

Four values out of six agree. With 4 trusses, there are 3 intervals. According to the drawings, 3 × 3.60 = 10.80 m between the first and the last truss; with two overhangs of 0.60 m, you get 10.80 + 2 × 0.60 = 12.00 m. According to the model, 3 × 3.65 = 10.95 m, that is 0.15 m more. The chimney opening measures 0.45 m in one direction instead of 0.50 m: 0.05 m is missing for the flue.

The matching values are used for the cutting list: 12.00 / 0.60 = 20 intervals, so 21 rafters per slope and 42 for the two slopes, that is 42 × 5.85 = 245.70 m of rafters. The two differences go to the engineer as a written question before any cutting: the project documents say which document prevails; it is not for the workshop to decide.

The 3D check validates 4 values out of 6, gives 42 rafters for 245.70 m and brings up two differences of 0.05 m, one of which moves the last truss by 0.15 m.

3 common mistakes when checking a frame in an IFC file

Dimensioning the gap between two members instead of the spacing

3D dimensioning snaps to vertices and edges. A centre-to-centre spacing is measured from the same side of each member. Measuring the gap removes one thickness and distorts the number of members.

Taking a length in top view for a true length

A sloping member, rafter or principal rafter, looks shorter in plan. Take its length by snapping to its two ends in the 3D view.

Assuming that all the joints of the frame are modelled

Many models show the main members without the connectors, bolts, plates or drill holes. An opening absent from the file is not an unnecessary opening. Cut through the joint and refer to the detail drawings for the rest.

How to check an IFC frame in 3 steps

  1. Open the model and isolate the frame
    Open the .ifc or .ifczip file in the studio. In the explorer, go down to the storey of the roof or the hall and isolate the beams and columns.
  2. Take the spacings, spans and openings
    Choose the appropriate view and dimension by snapping to vertices or edges: spacings of repeated members, spans between supports, dimensions of openings. Place the section box on a joint to see how the members cross.
  3. Compare with the drawings and note the differences
    Set each value taken against the one on the drawing. Read the section and the material in the inspector if they have been filled in, add a note to each difference and export the quantities by category as CSV.

Open the free studio →

What the free 3D check of an IFC frame does not do

The studio is a reading tool: it produces no cutting list, no file for a joinery or cutting machine, and no workshop drawing. It verifies no structural design and does not detect clashes between members: the check remains visual. The section box has no cap, so the members appear hollow.

Plans Pro (2D/3D) saves the annotated views of the frame with their versions, keeps the model in the site's private storage and opens up teamwork between the technical office and the workshop. The Portail chantier turns each difference into a snag ticket, with the viewpoint and the members concerned.

Frequently asked questions

Can a timber frame be checked in an IFC file without timber-frame software?

Yes, for a reading check: the studio isolates the frame and lets you dimension spacings, spans and openings. It does not replace timber-frame software for producing the cutting data or the workshop drawings.

Is the studio also suitable for a steel structure?

Yes. The steel sections appear as beams and columns, with their designation and weight where the author has filled them in. Plates, bolts and welds are visible only if they have been modelled.

What accuracy can be expected from 3D dimensioning?

The dimension read is that of the geometry in the file. Its accuracy depends on the model and on the point picked: cross-check a known dimension from the drawing before relying on the other readings.

What should be done when the IFC model and the drawing do not say the same thing?

Do not settle it in the workshop. Note the difference with both values, then put the question in writing to the project author before prefabrication.