More and more tender packages contain a digital model alongside the PDF drawings. For a building contractor, a site manager or a quantity surveyor, the question is simple: how do you open this IFC file without buying a CAD licence? Yet the model tells you a great deal even before pricing: storeys, element categories, thicknesses, openings.
The BIM-IFC 3D viewer and inspector studio opens, in the browser, on a PC, a Mac or a recent tablet, an .ifc model in the IFC2x3 and IFC4 schemas, or an .ifczip archive. The file stays in your browser's memory: nothing is uploaded. You have standard views, an explorer by storeys and categories, hide, isolate and X-ray functions, a section box, 3D dimensioning, a property inspector and a CSV export of the quantities.
Worked example: the IFC model of a small building with 8 flats
An architects' office sends a general contractor the model of a building with 8 flats on 4 levels, on the Swiss Plateau. The file, in the IFC4 schema, weighs 46 MB. The site manager opens it in the studio and notes in the explorer the number of elements per category.
| Category | IFC class | Number of elements | Share of total |
|---|---|---|---|
| Walls | IfcWall | 212 | 53.0 % |
| Slabs | IfcSlab | 14 | 3.5 % |
| Columns | IfcColumn | 18 | 4.5 % |
| Beams | IfcBeam | 34 | 8.5 % |
| Windows | IfcWindow | 64 | 16.0 % |
| Doors | IfcDoor | 58 | 14.5 % |
| Total | 6 classes | 400 | 100.0 % |
The sum is 212 + 14 + 18 + 34 + 64 + 58 = 400 elements. The load-bearing structure (walls, slabs, columns, beams) has 278 elements, that is 278 / 400 = 69.5% of the model. The openings have 64 + 58 = 122 elements, that is 30.5%. With 64 windows for 8 flats, the average is 8 windows per flat, a figure that is easy to cross-check against the elevations.
This count does not replace the quantity take-off, but it guides the tender. The 14 slabs for 4 levels show that the author has split some floors into several elements: this must be borne in mind when reading the quantities. A difference between the 58 doors and the list in the specification deserves a question to the site management.
Without a CAD licence, the contractor knows that the model contains 400 elements in 6 classes, of which 69.5% is load-bearing structure and 30.5% openings.
3 common mistakes when opening an IFC model
Confusing the IFC2x3 schema with the IFC4 schema
Both schemas open in the IFC viewer, but they do not describe every element in the same way. An expected category may appear under another class. Go through the whole explorer before concluding that a component is missing.
Believing the model is complete because it displays well
A model can be polished in 3D and poor in information. Quantities, materials and property sets appear in the inspector only if the author has filled them in. Select a few elements of each category to check.
Reading a dimension without checking the snap
3D dimensioning snaps to vertices and edges. In a crowded view, the point picked may belong to the neighbouring element. Isolate the element or switch to X-ray before dimensioning, then compare with a known dimension from the drawing.
How to use the IFC viewer in 3 steps
- Open the .ifc or .ifczip file
Drag the model onto the studio page, or choose the file. Only one model opens at a time; with a large file, the page may freeze for a few seconds while it is being read. - Browse the storeys and categories
In the explorer, expand the building and then the storeys. Change the view (top, front, side, isometric), hide what is in the way, isolate a category or switch on X-ray. The section box on X, Y and Z shows the inside of a level. - Check a dimension and export the quantities
Dimension a known element to cross-check the model against the drawings, read its properties in the inspector, add a note if a point remains to be clarified. Then export the quantities by category as CSV for your spreadsheet.
What the free IFC viewer does not do
The studio displays what the model contains: it does not modify the file, does not recalculate volumes and does not detect clashes. It opens only one model at a time, and some rare geometry cases are not all covered. The section box has no cap: you see the hollow inside of the elements. The session lives in working memory: closing the tab erases everything.
To keep the work of a construction site, Plans Pro (2D/3D) places the model in the site's private storage, saves annotated views with their versions and opens up teamwork. The Portail chantier adds snag tickets, each with its viewpoint and the elements concerned.
Frequently asked questions
Do you need a CAD licence to open an IFC file?
No. The IFC viewer runs in the browser, with no installation. It is used to view, measure and inspect a model, not to modify it: to correct the model, you need its author's software.
Which formats and schemas does the viewer read?
Files in .ifc format in the IFC2x3 and IFC4 schemas, as well as .ifczip archives. The native files of modelling software are not IFC files: ask the author for an IFC export.
Is the model sent to a server?
No. The file is read in your browser's memory and does not leave it. In return, nothing is saved: export your quantities as CSV before closing the tab.
Does the viewer work on a tablet?
Yes, on a recent tablet, as on PC and Mac. Smoothness depends on the device's memory and the weight of the model: above about 150 MB, the studio warns you.