HVAC and plumbing coordination: checking the openings in 3D in an IFC model

A duct that does not fit through its opening is too often discovered after the concrete is poured: look at it first in 3D, in the IFC model.

Open the free studio →

Free, no account: your files stay in your browser.

The coordination of building services comes down to a few centimetres. An insulated ventilation duct, a waste water stack or a cable tray must pass through the slabs and walls at the planned location, with the necessary clearance. The HVAC or plumbing contractor, like the mason who sets the openings, has every interest in checking these penetrations before the pour.

The BIM-IFC 3D viewer and inspector studio opens the model in the browser and allows a visual check of the openings. It does not detect clashes automatically: you are the one who looks. You isolate the services, put the structure in X-ray, place the section box on a penetration and use 3D dimensioning to take the diameter of a duct, the size of the opening and the remaining clearance.

Worked example: five HVAC and plumbing openings checked in 3D

On a small residential building in German-speaking Switzerland, the services contractor receives the IFC model that combines the structure and the services. Before the openings of the slab above the ground floor are set, he checks five penetrations. Assumption of the example: 10 mm of clearance on each side, 20 mm in total, a value to be confirmed with the project and the manufacturers.

Slab penetrations: overall size of the services and openings taken in the IFC model
ServiceOverall size with insulationOpening takenRemaining clearance
Ventilation duct Ø 250 mm, insulation 30 mm310 mm350 × 350 mm40 mm
Waste water stack Ø 110 mm, insulation 13 mm136 mmØ 160 mm24 mm
Heating flow pipe Ø 42 mm, insulation 30 mm102 mmØ 125 mm23 mm
Extract duct Ø 315 mm, insulation 30 mm375 mm350 × 350 mm−25 mm
Cable tray 300 × 60 mm300 mm400 × 150 mm100 mm

The overall size adds twice the insulation to the diameter: 250 + 2 × 30 = 310 mm, 110 + 2 × 13 = 136 mm, 42 + 2 × 30 = 102 mm and 315 + 2 × 30 = 375 mm. The remaining clearance is the difference with the opening: 350 − 310 = 40 mm, 160 − 136 = 24 mm, 125 − 102 = 23 mm, 350 − 375 = −25 mm, and 400 − 300 = 100 mm in width for the cable tray.

With 20 mm of total clearance, four penetrations fit. The extract duct exceeds its opening by 25 mm: it does not fit with its insulation. To keep the chosen clearance, the opening would have to measure at least 375 + 20 = 395 mm per side. This point goes to the site management as a question before the pour.

Of 5 openings checked in 3D, 4 leave between 23 and 100 mm of clearance and 1 is too small by 25 mm: at least 395 mm per side would be needed.

3 common mistakes when checking HVAC and plumbing openings

Forgetting the insulation and the clamps

Many models show the bare duct or pipe. The dimensioned diameter is then smaller than the real overall size. Add the insulation, the fire collars and the clamps before comparing: in the example, 315 mm becomes 375 mm.

Looking at the services model without the structure

The studio opens only one model at a time. If the services and the structural shell are in two files, you will not see the penetrations. Ask the author for an IFC export that combines the structure and the services.

Mistaking a visual check for clash detection

The studio flags no conflict by itself: what you have not looked at has not been checked. Work zone by zone and note the penetrations verified.

How to check the openings in 3D in 3 steps

  1. Open the model and isolate the services
    Open the .ifc or .ifczip file in the studio. In the explorer, choose the storey, isolate the ducts, pipes and cable trays, then show the slabs and walls again in X-ray to see the penetrations.
  2. Cut through the penetration and dimension the opening
    Set the section box on X, Y or Z to slice the slab or the wall at the penetration. Dimension the diameter of the service and the opening by snapping to vertices and edges.
  3. Calculate the clearance and note the conflicts
    Add the insulation to the diameter, subtract the result from the opening and compare the clearance with the value agreed for the project. Add a note to each penetration that is too tight.

Open the free studio →

What the free check of openings does not do

The studio has no automatic clash detection and does not combine several models: it displays one IFC file at a time and leaves you to judge by eye. It calculates neither pressure losses nor drainage gradients, and it does not know the insulation if it is not modelled. Notes are not kept after the tab is closed.

Plans Pro (2D/3D) keeps the model in the site's private storage and saves your annotated views with their versions, so that coordination can be resumed as a team. The Portail chantier turns each conflict into a snag ticket, with the viewpoint and the elements concerned, tracked until it is closed.

Frequently asked questions

Does the studio detect clashes between ducts and structure?

No, there is no automatic detection. The check of the openings is visual: isolate, cut, dimension.

Can the HVAC model and the structural model be loaded together?

The studio opens one model at a time. To see the services pass through the slabs and walls, you need an IFC file that combines both, to be requested from the project author.

How do you measure the clearance between a duct and its opening?

Dimension the duct and the opening, add twice the insulation to the diameter, then take the difference. In the worked example, a 250 mm duct insulated with 30 mm takes up 310 mm and leaves 40 mm in 350 mm.

What clearance should be allowed around a duct or a pipe?

It depends on the service, the insulation, the fire protection and the acoustic requirements. The 10 mm per side used here is an example assumption: use the value set by the project and the manufacturers.