Free software · 100% in your browser · no data sent

From the SIA 451 bill of quantities to the spreadsheet and the tender PDF: what each tool does

From the SIA 451 bill of quantities to the price table and the tender PDF: here is what the free studio produces, and what belongs to the Soumissions software.

Open the free studio →

Free, no account: your files stay in your browser.

Many contractors price in a spreadsheet. They receive a bill of quantities in SIA 451 format, calculate their prices in their own sheet, then have to hand in a readable tender: a summary by chapter, discounts, VAT, a total. The risk lies at both ends: a quantity miscopied on the way in, a different order of calculation on the way out.

The free studio reads the SIA 451 bill of quantities, lets you type or paste your unit prices from a spreadsheet, checks the totals and prints a tender summary that the browser's print function can save as a PDF, with an Art Construction watermark. It exports no CSV, no Excel file and no return file. The spreadsheet, the return file and the tender document without a watermark are part of the Soumissions software.

Worked example: a four-chapter SIA 451 bill of quantities checked against the contractor's spreadsheet

A plastering and painting contractor prices a four-chapter SIA 451 bill of quantities for the renovation of a school. It calculated its tender in its spreadsheet, then pastes its prices into the studio to check the total. The amounts are example amounts and entirely fictitious.

Summary by chapter of the SIA 451 bill of quantities (example amounts, in CHF)
ChapterTotal of itemsChapter discountChapter net
Chapter 1: preparatory work6’400.000 %6’400.00
Chapter 2: partitions and ceilings21’750.004 % (870.00)20’880.00
Chapter 3: plastering9’300.000 %9’300.00
Chapter 4: painting3’150.000 %3’150.00
Total40’600.00870.0039’730.00

The studio follows its order of calculation: total of items, CHF 40’600.00; discount on chapter 2, 21’750.00 × 4% = CHF 870.00, leaving CHF 39’730.00; overall discount of 2% on that amount, 39’730.00 × 2% = CHF 794.60. The net amount excluding VAT is CHF 38’935.40. VAT at 8.1% is 38’935.40 × 8.1% = CHF 3’153.77, and the total including VAT CHF 42’089.17.

The contractor's spreadsheet showed CHF 42’070.36. The cause: the sheet applied the overall discount of 2% to the gross total (40’600.00 × 2% = CHF 812.00), then took off the CHF 870.00 of chapter 2, which gave a net of CHF 38’918.00 and, with CHF 3’152.36 of VAT, a total of CHF 42’070.36. The difference is CHF 18.81: only the order of the discounts differs.

Key point: the bill of quantities gives CHF 42’089.17 including VAT in the studio against CHF 42’070.36 in the spreadsheet, a difference of CHF 18.81 due solely to the order in which the discounts are applied.

3 common mistakes between the SIA 451 bill of quantities, the spreadsheet and the PDF

Copying the quantities of the bill by hand

Retyping the quantities of a SIA 451 bill of quantities creates discrepancies: a shifted decimal point, a skipped line, a confused unit. Read the file in the studio instead and paste your column of prices into it.

Pasting a column of prices shifted by one line

Pasting from a spreadsheet follows the order of the lines. If your sheet contains a heading line or one item more than the bill, all the following prices slip by one row. Check the last price pasted and the total of each chapter.

Expecting a spreadsheet export from the free version

The free studio produces no CSV or Excel file and no return file: its output is a printable summary, with a watermark. If the invitation to tender requires an exchange file in return, plan for the Soumissions software well before the eve of the deadline.

How to go from the SIA 451 bill of quantities to the tender PDF in 3 steps

  1. Read the SIA 451 bill of quantities
    Drop the .01s, XML or .crbx file into the studio. Check the reliability indication of the reading and compare a few quantities with the original document.
  2. Paste the prices from your spreadsheet
    Copy the column of unit prices from your sheet and paste it onto the first item of the bill. Complete the remaining lines with the keyboard, sub-item by sub-item. Enter the chapter discount, the overall discount and the VAT rate.
  3. Check the total and save the PDF
    Compare the net excluding VAT and the total including VAT with those of your spreadsheet. Deal with the anomalies, then print the summary and choose to save as PDF in the browser's print dialog.

Open the free studio →

SIA 451 bill of quantities: what the free version does not do

The free version is a tool for reading, entering and checking. It creates no CSV or Excel file, writes no return file and does not save your work. The printed summary carries a watermark. The reading remains tolerant and should be compared with the original document.

The Soumissions software covers the rest: spreadsheet and tender documents, export without a watermark, a file saved per construction site, price suggestions item by item and export of the return file, that is, the original file completed with your prices, to be validated with your trade software before sending.

Frequently asked questions

Can a SIA 451 bill of quantities be converted to an Excel or CSV file for free?

Not with the free studio, which exports no spreadsheet file. It reads the bill, calculates the totals and prints a summary. The spreadsheet is part of the Soumissions software.

How do I get a PDF of my tender?

Print the tender summary and choose to save as PDF in the browser's print dialog. This PDF carries an Art Construction watermark.

Can I paste my prices from a spreadsheet into the SIA 451 bill of quantities?

Yes. Copy your column of unit prices and paste it into the studio: the prices are distributed in the order of the lines. Then check the total of each chapter.

Why do my spreadsheet and the studio not give the same total?

Often because of the order of the discounts. The studio applies the chapter discount, then the overall discount, then VAT on the net excluding VAT. Compare the intermediate lines.