In an invitation to tender in SIA 451 format, the contractor does more than fill in prices. It sometimes proposes a contractor's alternative, that is, another way of carrying out a piece of work, it grants a discount, and it states a cash discount for prompt payment. The works contract often declares the SIA 118 standard applicable: what it allows for alternatives, discounts and cash discount is to be read in the tender documents. This page gives no legal advice.
The studio takes care of the calculation and the presentation. It flags items of the “alternative” type in the tree, applies the chapter discount and then the overall discount as a percentage, calculates VAT at 8.1% by default and displays the total including VAT. The cash discount and the site pro rata charge are shown for information only, outside the total including VAT.
Worked example: base tender and contractor's alternative, with 3% discount and 2% cash discount
A facade contractor responds to an invitation to tender for a residential building. It prices the base tender, then a contractor's alternative that replaces an item of CHF 9’200.00 with a different execution at CHF 6’500.00. All amounts are example amounts and entirely fictitious. The cash discount is calculated here on the total including VAT, by way of illustration.
| Summary line | Base tender | With the alternative |
|---|---|---|
| Total of items | 84’000.00 | 81’300.00 |
| Overall discount of 3 % | 2’520.00 | 2’439.00 |
| Net excluding VAT | 81’480.00 | 78’861.00 |
| VAT 8.1 % | 6’599.88 | 6’387.74 |
| Total including VAT | 88’079.88 | 85’248.74 |
| Cash discount of 2 % (indicative, outside the total) | 1’761.60 | 1’704.97 |
Base tender: the overall discount of 3% applies to the total of items, 84’000.00 × 3% = CHF 2’520.00, hence a net amount excluding VAT of CHF 81’480.00. VAT is 81’480.00 × 8.1% = CHF 6’599.88 and the total including VAT CHF 88’079.88. With the alternative, the total of items becomes 84’000.00 − 9’200.00 + 6’500.00 = CHF 81’300.00. The discount is then CHF 2’439.00, the net CHF 78’861.00, VAT CHF 6’387.74 and the total including VAT CHF 85’248.74.
The alternative lowers the items by CHF 2’700.00, but the difference between the two totals including VAT is CHF 2’831.14: the discount and then VAT apply to a different amount. The 2% cash discount stays separate: CHF 1’761.60 on the base tender, CHF 1’704.97 with the alternative. The studio does not deduct it from the total.
Key point: the base tender comes to CHF 88’079.88 including VAT, the tender with the alternative to CHF 85’248.74, and the 2% cash discount appears beside the total without changing it.
3 common mistakes with alternatives, discounts and cash discount
Adding the contractor's alternative to the base tender
A contractor's alternative replaces a piece of work; it is not added to it. If both are counted, the total is inflated. The studio flags items of the “alternative” type: check in the summary which lines go into the total you submit.
Deducting the cash discount from the tender price
A cash discount rewards payment within an agreed period: it is conditional. Show it on a separate line, with its rate and its period, without subtracting it from the total including VAT.
Applying the discount after VAT
The discount reduces the amount excluding VAT, and VAT is calculated on the net. If you reverse the order, the intermediate lines become wrong and no longer match the tender document.
How to handle alternative, discount and cash discount in 3 steps
- Spot the items of the “alternative” type
Open the tender file and go through the tree: items of the “alternative” type are flagged there. For each one, note the base item it relates to, according to the original document. - Price the base tender, then the alternative
Enter your unit prices and note the total of the base tender. The studio calculates one total at a time: to compare, then price the alternative in place of the base item and note the second total. Print a summary for each version. - Set the discount, cash discount and pro rata
Enter the chapter discount and the overall discount as a percentage. Fill in the cash discount and the site pro rata charge: they are shown for information only, outside the total including VAT. The anomaly detector flags a percentage outside 0 to 100%.
What the free studio does not do for a contractor's alternative
The studio does not hold two versions of a tender side by side and saves nothing: the comparison between the base tender and the contractor's alternative is done in two passes, with two printouts. It does not say whether an alternative is admissible. The summary carries a watermark.
The Soumissions software saves the file per construction site, exports the return file with your prices (to be validated with your trade software before sending) and produces tender documents without a watermark.
Frequently asked questions
What is a contractor's alternative?
It is a proposal by the contractor that departs from the solution described: another material, another method or another breakdown. The conditions under which it is admitted are set out in the tender documents.
What is the difference between a discount and a cash discount?
A discount reduces the tender price, whenever payment is made. A cash discount is a reduction granted if the invoice is paid within an agreed period: it does not change the tender total.
On which amount does the studio calculate the overall discount?
On the total of items, after deduction of the chapter discounts. The result is the net amount excluding VAT, to which VAT is added, 8.1% by default.
Does the SIA 118 standard apply to my tender?
Only if the contract or the tender documents declare it applicable. For the interpretation of the contract, consult a lawyer or your trade association.