A .01s file is an exchange file in the SIA 451 format: a text file structured in fixed-width records, which the author of the specification exports from their software to send to contractors. Without the software that produced it, it looks like a series of barely readable lines. As not every workstation has tendering software, many small firms price from the PDF and copy the quantities by hand.
The studio reads the .01s file in the browser. Nothing is uploaded. The reader recognises older encodings, displays the tree (chapters, groups, items, sub-items) with quantities, units and descriptive texts, then tells you whether the reading is structured or heuristic. You type in your unit prices, set the discounts and the VAT, and the anomaly detector flags the items left without a price.
Worked example: a .01s file with three chapters, discounts and 8.1% VAT
A masonry contractor receives the tender documents for a villa conversion somewhere in French-speaking Switzerland: a .01s file with three chapters and about forty items. The amounts below are example amounts and entirely fictitious: they show the order of the calculation, not a price level.
| Chapter | Total of items | Chapter discount | Chapter net |
|---|---|---|---|
| Chapter A: site installations | 4’200.00 | 0 % | 4’200.00 |
| Chapter B: masonry | 38’650.00 | 2 % (773.00) | 37’877.00 |
| Chapter C: rendering | 12’480.00 | 0 % | 12’480.00 |
| Total | 55’330.00 | 773.00 | 54’557.00 |
The studio first adds up the items of each chapter: CHF 4’200.00, 38’650.00 and 12’480.00, which makes CHF 55’330.00. The 2% discount granted on chapter B applies to that chapter alone: 38’650.00 × 2% = CHF 773.00, which brings the chapter down to CHF 37’877.00 and the total to CHF 54’557.00. The overall discount of 3% comes next, on this already reduced amount: 54’557.00 × 3% = CHF 1’636.71. The net amount excluding VAT is therefore CHF 52’920.29.
VAT at 8.1% is calculated on the net: 52’920.29 × 8.1% = CHF 4’286.54, giving a total including VAT of CHF 57’206.83. The cash discount and the site pro rata charge, if you fill them in, are shown for information only, outside this total.
Key point: CHF 55’330.00 of items give CHF 52’920.29 net excluding VAT and CHF 57’206.83 including VAT, because the overall discount applies after the chapter discount.
3 common mistakes when pricing a .01s file
Leaving items at zero before submission
Among several dozen items, one line without a price goes unnoticed: the total looks plausible and a service is given away. The anomaly detector lists items without a price, missing quantities and unknown units: read it through before printing.
Pricing the parent item instead of the sub-items
When an item contains sub-items, each sub-item carries its own quantity and is priced separately. Expand the tree and check at which level the quantities sit.
Adding discounts together instead of chaining them
A chapter discount of 2% and an overall discount of 3% do not make 5% on the whole. The first reduces one chapter only, the second applies to the total already reduced. Check the “net excluding VAT” line.
How to price a .01s file in 3 steps
- Open the .01s file
Drag the file into the studio, on a Mac or a PC. The tree appears with the chapters, items, quantities and units. Look at the reliability indication, then compare two or three items with the original document. - Enter the unit prices with the keyboard
Type your prices item by item: Tab and Enter move to the next line, the arrow keys let you go back, and you can paste a column of prices from a spreadsheet. Then set the chapter discount, the overall discount and the VAT rate, 8.1% by default. - Check, then print the summary
Open the list of anomalies and deal with each flagged line. Then print the tender summary, chapter by chapter. The browser's print function lets you save it as a PDF.
What the free reading of a .01s file does not do
The reading is tolerant, but it has not been validated on every file produced by every software package: compare the result with the original document before relying on it. The free studio produces no return file and no CSV or Excel export, and the printed summary carries an Art Construction watermark.
The Soumissions software takes over when the file has to last: export of the return file (the original file with your prices, to be validated with your trade software before sending), a file saved per construction site, price suggestions item by item that you accept or not, and tender documents without a watermark.
Frequently asked questions
Can a .01s file be opened on a Mac?
Yes. The studio runs in the browser, on Mac and PC alike, with no software to install. The .01s file is read on your computer and is not sent to a server.
Does the reader change the text of the specification?
No. The text of the items belongs to the author of the specification and stays as it is. You only add your unit prices, your discounts and your calculation settings.
How do I know whether the .01s file was read correctly?
The studio indicates whether the reading is structured or heuristic. In both cases, compare a few items, their quantities and their units with the PDF or the original document before pricing the whole tender.
Can I send back the .01s file with my prices?
Not from the free studio, which prints a tender summary. Export of the return file is part of the Soumissions software, and that file should be checked with your trade software before sending.