Loading...
About this tool
What a SIA 451 tender file is (.01s, XML, CAN / NPK)
On construction sites in Switzerland, architectural firms and clients submit their project files in the form of standardised exchange documents. These files have the .01s extension or are structured as XML files according to the SIA 451 standard. You may also encounter .crbx archives, which are compressed files containing work descriptions. These formats rely on the standard article catalogue (CAN / NPK) and classify works according to the construction cost plan (CFC).
The .01s file is a plain text document. Data is organised into precise lines to transmit complete descriptions, position numbers, quantities and units of measurement. Depending on the age of the software used by the tender author, these documents may be saved with legacy character encodings such as Windows-1252 or CP850. The Art Construction reader handles these various encodings directly within your web browser.
Art Construction is independent of SIA, CRB and Suva. This tool allows you to open a 01s file without having to install heavy management software on your workstation. The goal is to immediately view the contents of the tender bill of quantities, without altering the original texts prepared by the site management. To familiarise yourself with the screen interface without using your own project documents, a fictional example is built into the tool with no prices entered.
Opening and understanding the position tree
To open your tender file, simply load it into the online tool. The program analyses the document and displays the complete project structure as a hierarchical tree. You will find the main CFC chapters, CAN chapters, followed by groups, main positions and any sub-positions.
Each line displays the elements required to evaluate the work: the position number, the descriptive text written by the specifier, the planned quantity and the unit of measurement. Common building units are clearly indicated: square metres (m²), cubic metres (m³), linear metres (m'), pieces (pce) or lump sums (gl). The architect's text is never modified, preserving the integrity of the initial request.
The tool indicates a reliability level for reading your file, whether structured or heuristic, as no official public format has been verified across all market variants. As you browse the tree, you can expand a specific chapter to check details of excavation, masonry work or technical installations. If a position contains sub-positions, it is priced sub-position by sub-position: the application does not automatically add anything between levels until each line is processed.
Entering your bid using the keyboard, just like a spreadsheet
Entering prices to respond to a call for tenders requires speed and precision. The interface offers navigation designed for keyboard work, similar to a spreadsheet. You move from one position to another using the Tab key, Enter key or arrow keys on your keyboard, without having to reach for the mouse on every line.
You enter your unit prices directly opposite each measured quantity. You can also paste a series of numerical values prepared beforehand in an external spreadsheet such as Excel. The total amount for each position is calculated as you type by multiplying the quantity by the entered unit price.
In the free version of the reader, no tariffs or price data from the ACIP database are provided: the user works solely with their own figures and usual costs. If the file sent by the project author already contains amounts or estimates, this data is not automatically retrieved upon loading. An explicit button allows you to decide whether to reuse these existing values in your pricing grid or start with a blank tender.
Discounts, VAT, cash discount and pro rata: the order of calculation
Drawing up a bid for a trade contractor involves several financial calculation steps on the bill of quantities. The tool applies these operations in a clear and methodical sequence to avoid any confusion in summary totals.
Calculations are organised according to the following steps:
- Gross amount per chapter: sum of priced positions within each CFC or CAN chapter.
- Discount per chapter: percentage discount applied locally to a given chapter according to the project description.
- Global discount: percentage reduction applied to the sub-total of the entire project.
- Value Added Tax (VAT): calculation of Swiss VAT, set by default at the rate of 8.1%, but adjustable to your needs.
- Total incl. VAT: final amount of the bid including tax.
Additionally, you can display a cash discount rate for prompt payment or a site pro rata retention. Both of these elements appear for information purposes on the margin of the bid and remain outside the total incl. VAT. The cash discount and pro rata are indicative and do not constitute tax or legal advice; their application depends on agreements made with site management and contractual documents.
Zero positions: the costly mistake before submission
In the field, trade contractors are often seen submitting their tenders with a forgotten position left at zero francs. When bids are compared by the architectural firm, this situation creates a technical dispute: is the price deemed included in another item, or has the company refused to price the service? In many cases, the company is forced to carry out the task without additional remuneration, which degrades the construction site's margin as soon as the contract is signed.
To prevent this recurring problem, the reader includes an entry anomaly detector. This warning system checks the entire bill of quantities before printing or exporting your figures. It highlights in red positions whose unit price has remained at zero, lines where a quantity is missing from the author's text, and unknown units that could not be linked to a standard benchmark.
The professional approach is to review the list of alerts before finalising the file study. If an item is genuinely included in another service, note it clearly according to the project description, but do not inadvertently leave a line blank. This systematic check protects your financial interests before sending your proposal.
Printing the summary
Once the unit prices have been entered and checks performed, you can generate a summary printout directly from your browser. This function prepares a clean document summarising all project chapters, granted discounts, the VAT amount as well as the overall total of your tender.
In the free version, this printed summary features an Art Construction watermark. It provides you with a paper trail or PDF file for your internal review meetings, for consistency checks with your site manager, or for archiving your initial costs in a physical workshop binder.
This printout presents totals by CFC chapter, facilitating line-by-line comparison with the description requests. You can see at a glance the financial breakdown of your response, the amounts of any discounts and the cash discount lines mentioned for information purposes. This forms a practical basis for discussion before any final validation of your tender file.
Your files stay with you: confidentiality and nDSG
Protecting commercial data and construction site measurements is a key issue for any construction company. The Art Construction tool runs 100% in your web browser. This means no files, plans or financial data are sent to a remote server while you work.
All steps involving opening the .01s file, interpreting the XML and calculating amounts are executed locally in your own computer's RAM. No files are kept or analysed by a third-party service. This technical approach aligns with companies' discretion requirements and the framework of the nDSG regarding the processing of private data in Switzerland.
This mode of operation also implies a total absence of memory on our servers. Nothing is saved on our end. If you close your browser or inadvertently refresh the tab, your workspace is immediately reset and unsaved data is lost. You must export or print your results before leaving the page.
What the free version does not do
The free version is freely accessible: it can be used without registration and without creating a user account. However, this open access mode has technical limitations that should be noted before starting complex pricing.
Document reading is tolerant, but the format has not been validated on all architect files circulating on the market: you must always compare the displayed tree with the original document provided by site management. Furthermore, this display studio complements the pricing tools in our range, but it does not replace the Excel converter offered on our website.
The free version does not allow you to save your work online to resume it later, nor load a file stored on a remote server. It contains no integrated price library, which requires entering each value manually. Finally, it does not produce a return computer file in SIA 451 format containing your prices to send back to the architect, and its printouts bear a watermark. For these advanced needs, you can explore our complete tenders solution or discover our workshop management tools on the portal.
Switch to Tenders
For general contractors, quantity surveyors and trade contractors who respond to multiple SIA 451 calls for tenders every week, the paid tenders solution provides superior productivity features.
The Pro version allows you to save all your files directly in a secure cloud construction site. You keep successive versions of your bids, can reopen a saved project at any time and modify your positions in case of a contract addendum. It also allows teamwork so several collaborators can work on the same file.
The software also offers self-pricing thanks to the ACIP price database: the system formulates item-by-item proposals that the user freely validates according to their yields. At the end of the work, you export a return file integrating your prices into the original structure of the architect's file, ready for final validation with your usual business software before sending. For companies that also manage their graphic preliminary measurements, our Pro offer module allows you to directly link quantities measured on plans to your tender lines.
Frequently asked questions
How can I open a .01s call for tenders file without paid software?
You can open a .01s file directly in your web browser using Art Construction's free reader. Simply drag the document into the designated area: the tool decodes plain text, recognises legacy encodings such as Windows-1252 and displays the CFC and CAN chapter structure without sending any data to a server.
Do my pricing data remain confidential in the free tool?
Yes. All technical processing takes place locally in your own internet browser. No files, measurements or financial amounts are transmitted to an external server. As soon as you close or refresh your browser tab, local memory is cleared and no trace is kept.
Does the free tool allow generating the return .02s or XML file?
No. The free version is used to view descriptions, enter indicative prices, check forgotten positions and print a watermarked paper summary. Exporting a structured return file with your prices reinjected into the original format requires using the paid Tenders software.
How are the cash discount and site pro rata calculated?
The tool first applies chapter discounts, the global discount, then Swiss VAT to determine the amount incl. VAT. The financial cash discount and pro rata retention are then calculated and displayed on the margin for information purposes only, without modifying the official total incl. VAT of the bid.
Why don't some prices already present in my file display?
As a security measure for your pricing, amounts possibly entered in the original file are not retrieved by default upon opening. You must click an explicit button to decide to import these existing values into your working grid.
How do I price a position that contains multiple sub-positions?
In this reader, a parent position does not automatically calculate the sum of its sub-positions. You must enter your unit price sub-position by sub-position in order to value each technical task requested by the project author according to the provided description.
Can I paste amounts prepared in an Excel file?
Yes. The entry table allows you to directly paste columns of unit prices copied from your Excel spreadsheet. You can also quickly navigate from position to position using only the Tab key, Enter key and your keyboard arrow keys.