The canton of Schaffhausen shares a national border only with Germany. Under the tax treaty between the two countries, Switzerland may deduct from a cross-border worker who returns home to Germany every day a withholding tax capped at 4.5% of gross pay, provided they hand the employer the Gre-1 residence certificate (then Gre-2) issued by their Finanzamt. Codes L, M, N and P mirror situations A, B, C and H; if the ordinary tax scale gives less than 4.5%, that lower amount is deducted. Germany then taxes the salary and takes the Swiss tax into account. The authority is the Kantonale Steuerverwaltung Schaffhausen, Abteilung Quellensteuer (cantonal tax administration, withholding tax department); Schaffhausen applies the monthly model and the collection commission there is 2% according to the 2026 list of the Swiss Federal Tax Administration (AFC).
The Construction Gross-to-Net Salary studio records Schaffhausen and cross-border commuter as document labels: it loads no tax scale and does not apply the cap by itself. You enter the rate: 4.5% if the ordinary code N scale gives more, otherwise the lower rate read in the 2026 tax scale. The statement can then be read line by line. The Construction Payslip and Construction Work Permits studios cover the employee's payslip and the G permit.
Worked example: gross-to-net pay of a cross-border crane operator in Schaffhausen
Crane operator aged 55 living in Germany, G permit, married, spouse also working (code N), Gre-1 certificate handed in. Structural work, CHF 6,450 per month, no 13th salary. Example rates: LAA-NP 1.3%, IJM 0.9%, LPP CHF 380 per month; withholding tax at the 4.5% cap.
| Line | Basis | Rate | Amount CHF |
|---|---|---|---|
| Gross AVS | monthly salary | no 13th | 6,450.00 |
| AVS/AI/APG and AC | 6,450.00 | 5.3% + 1.1% | −412.80 |
| LAA-NP and IJM | 6,450.00 | 1.3% + 0.9% (example) | −141.90 |
| LPP | monthly amount | example, 18% (age 55-65) | −380.00 |
| FAR and parity fund | 6,450.00 | 2.25% + 0.7% | −190.28 |
| Withholding tax N | 6,450.00 | 4.5% (Gre-1 cap) | −290.25 |
| Net pay | 6,450.00 − 1,415.23 | 5,034.77 |
On CHF 6,450, AVS/AI/APG deducts CHF 341.85, AC CHF 70.95, LAA-NP CHF 83.85, IJM CHF 58.05, FAR CHF 145.13 and the parity fund CHF 45.15. At 55, the retirement credit rises to 18% of the coordinated salary: the example LPP of CHF 380 per month reflects this. It is read on the pension fund certificate, because each set of regulations sets its own split.
Withholding tax is deducted at the 4.5% cap: CHF 290.25. The cap assumes that the ordinary code N scale gives more; if the line in the 2026 tax scale shows a lower rate, that is the one to enter. Total deductions: CHF 1,415.23; net paid: CHF 5,034.77. Schaffhausen also levies a small employee contribution for its social fund (0.04% according to the OFAS table): the compensation fund will say whether it appears on the payslip; the studio handles it with the free-entry deduction.
With the Gre-1 handed in, the cross-border crane operator receives CHF 5,034.77 net on CHF 6,450 gross, including CHF 290.25 of withholding tax at the 4.5% cap.
3 common mistakes with a cross-border worker's gross-to-net pay in Schaffhausen
Deducting 4.5% without a Gre-1 certificate
The cap only exists once the residence certificate has been handed to the employer. Without it, the cross-border worker is taxed under the ordinary scale, often much higher, and the error comes to light when the statement is checked.
Coding M instead of N for a dual-income couple
Code N mirrors situation C, married with two incomes; code M mirrors situation B, spouse not working. If the spouse takes up a job in Germany again, the code changes: ask the employee to report every change.
Deducting 4.5% when the scale gives less
The cap is a limit, not a fixed rate. For a modest income or an employee with several children, the ordinary scale can stay below 4.5%: the lower rate is then the one deducted.
How to use it in 3 steps for a German cross-border worker in Schaffhausen
- Enter the monthly salary
Choose the gross-to-net direction, the monthly salary of CHF 6,450, no 13th salary, and set Schaffhausen and cross-border commuter as labels on the statement. - Enter the rates and the capped tax
Enter LAA-NP, IJM and LPP according to your policies and regulations, keep FAR and the parity fund for structural work, then the withholding tax rate: 4.5%, or the lower code N rate read in the 2026 tax scale. Add a free-entry deduction if needed. - Check and export
Check each formula, compare with a scenario without Gre-1 in comparison mode, then print, save as PDF or export to CSV. The calculation stays in your browser.
What the free gross-to-net simulator does not do in Schaffhausen
The studio loads no Schaffhausen tax scale, does not apply the 4.5% cap by itself and does not check Gre-1 and Gre-2 certificates. It does not produce an official statement, transmits nothing via ELM, does not calculate family allowances and does not deal with taxation in Germany. Your compensation fund and the canton's tax authority have the final word.
ERP Art Construction, with its HR / Employees module, keeps the employee register, their contracts and the history of pay periods, alongside your construction sites; a 14-day trial lets you test it. What this crane operator costs the company is calculated separately, with the CLA Employer Hourly Cost studio.
Frequently asked questions
Who issues the Gre-1 certificate?
The German Finanzamt where the cross-border worker lives, on request. The employee hands it to the Swiss employer; it is then renewed with the Gre-2. Keep it with the payroll records.
Does a cross-border worker who does not go home every evening keep the cap?
Not necessarily: the treaty sets a number of non-return days beyond which cross-border status can be lost. The number of nights allowed and the days counted should be checked with the Steuerverwaltung.
What commission does the employer receive in Schaffhausen?
The 2026 list of the Swiss Federal Tax Administration gives 2% of the tax paid, online or on paper. It may be reduced if the filing obligations are not met.
Are Schaffhausen family allowances paid to cross-border workers?
A cross-border worker may be entitled to them under the coordination rules with Germany. The OFAS table for 2026 gives CHF 230 per child and CHF 290 in education in Schaffhausen; the compensation fund decides each case.