Free software · 100% in your browser · no data sent

Swiss construction salary simulator: gross to net and net to gross

Enter an hourly or monthly salary: the breakdown details each deduction (AVS, AC, LAA-NP, IJM, LPP, FAR, joint fund, withholding tax) along with its formula. Rates you do not enter are never assumed.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

From gross to net in construction: how a payslip is structured

On a Swiss construction site, moving from gross salary to the amount transferred to the bank account follows a precise mechanism. Whether you are a site supervisor, works manager, quantity surveyor or owner of a general contractor, a payslip cannot be improvised. It begins with basic pay for the work performed, to which contractual components such as meal allowances or the 13th-month salary are added, before applying all social insurance contributions and withholding tax.

In our free online tool, operation relies entirely on your web browser. You do not need to create an account or complete any registration. The information you enter remains on your workstation: nothing is transmitted externally and nothing is kept in memory after closing your page. If you refresh your browser or close the tab, your data is erased immediately. It is therefore advisable to make a paper printout or an export before leaving the calculation page.

This simulator never claims to deliver an official document. It uses no absolute formulas and does not replace a fiduciary. It displays a result calculated to the cent using the rates you have entered. To start, you choose your sector: structural work, finishing work or building services. The proposed collective agreement classes, for example CE, Q, A, B or C, serve solely as reference benchmarks to structure your lines. No automated scale enforces a salary floor: you enter the figures agreed upon in the employment contract or set in your industry agreements yourself.

Employee deductions: AVS, unemployment insurance, LAA-NP, IJM, LPP, FAR and joint funds

The net calculation deducts all social contributions taken from the employee's share from the qualifying gross salary. In the tool, each deduction forms a distinct line, detailing the formula applied to the values you specified.

Only two statutory rates and one ceiling are pre-filled by default according to data from the Federal Social Insurance Office recorded on 17 November 2026:

  • The AVS (Swiss old-age and survivors' insurance)/AI/APG contribution set at 5.3% for the employee share (as of 1 January 2026).
  • Unemployment insurance set at 1.1% for the employee share, subject to the statutory annual ceiling of 148200 in insured earnings.

All other deductions are initially blank. You must enter your own percentages or fixed amounts:

  • Non-occupational accident insurance (LAA-NP), applied here to the qualifying gross for AVS according to the rate shown on your company's insurance policy.
  • Daily sickness benefits (IJM), calculated according to the collective contract taken out with your insurance company.
  • Occupational pensions (LPP), which you can enter as a percentage or, preferably, as the periodic amount read on the pension certificate from your pension fund. The simulator applies no automated age-bracket scale or coordination deduction.
  • The FAR early retirement scheme, whose 2.25% rate (effective from 1 April 2025) and 0.7% joint fund are suggested when you select structural work, based on trade union data from the national collective agreement for the main construction trade 2026-2031, to be cross-checked with your fund. The monthly ceiling used corresponds to the maximum annual LAA earnings divided by twelve. For other trades, such as finishing work, you enter your joint fund's percentage directly.

A table summarises each parameter: its unit, its value, its reference year, its source and its status (read from source, verified by you or to be verified). As soon as you alter a read value, the status automatically reverts to to be verified.

Hourly or monthly salary, overtime, 13th-month salary and holiday pay

Remuneration for a worker or construction site manager can be set hourly or monthly. The simulator handles both options rigorously according to the selected settings.

If you opt for an hourly wage, the basic gross amount is obtained by multiplying the hourly rate by the normal hours worked for the month. Overtime hours can then be added. A 25% surcharge is suggested as an indicative reference; you remain free to adjust it according to the terms agreed in your contract or joint agreements. Conversely, if you work on the basis of a fixed monthly salary, automated overtime calculation is not possible as no hourly rate is defined in the tool. Any supplements must then be entered in the box for additional earnings subject to social security contributions.

Processing the 13th-month salary offers three alternatives suited to administrative reality:

  • Not paid during the period.
  • Included each month as a percentage: the indicative value of 8.33% is suggested with the label to be verified, and you have an option to determine whether this percentage also applies to holiday pay.
  • Paid in a single instalment during the year-end settlement.

For hourly-paid staff, holiday pay integrated into ongoing gross salary offers three adjustable tiers: 8.33% for four weeks of annual leave, 10.64% for five weeks, and 13.04% for six weeks of rest. These figures remain suggestions to be verified against the individual contract or applicable collective agreement.

Meal and mileage allowances: expense reimbursements, outside AVS in this simulator

On site, daily travel between workshop, yard and construction sites generates business expenses. In our simulator, these payments are handled as actual expense reimbursements, not subject to AVS/AI/APG social security contribution deductions.

Dedicated lines are available to adjust these essential construction items:

  • Meal allowances on the construction site, determined by the number of days worked multiplied by a daily allowance. Baseline amounts from the national collective agreement for the main construction trade 2026-2031 are offered as an indicative starting point, citing their consultation date.
  • Mileage allowances for using a vehicle, calculated by multiplying the distance travelled by the agreed mileage allowance.
  • Free-text fields for other reimbursements exempt from social contributions, alongside specific areas for possible exceptional earnings subject to AVS or miscellaneous monthly deductions.

The costly mistake on site: provisional payslips often mix lunch basket allowances or transport reimbursements directly with productivity bonuses inside the basic gross salary total. The entire figure then improperly incurs deductions for unemployment insurance, LPP and old-age pension, distorting the net calculation and artificially inflating salary charges. The action that avoids this issue consists in isolating business expense reimbursements onto separate lines, outside the AVS contribution base, according to your company's reimbursement scales.

Withholding tax: reading your rate from the cantonal scale (resident or cross-border)

Withholding tax applies to many construction workers and technicians in French-speaking Switzerland, whether resident in their working canton or holding cross-border status. Our studio contains no preloaded cantonal tax scales. You must check the official schedule issued by your region's cantonal tax authority and enter the relevant tax rate yourself.

In the interface, you select the name of your canton from the 26 Swiss cantons. You also indicate whether the employee holds resident or cross-border status. This selection serves as an explanatory guidance label: collection procedures and reporting rules vary substantially between cantons. For instance, specific tax arrangements deriving from an agreement concluded in 1983 only apply to certain specific cantons.

The tax rate entered by you applies, within this simplified calculation, to the qualifying gross amount used for AVS. It is your responsibility to check with the competent cantonal tax authority whether certain allowances or supplements must be included or excluded from the taxable base according to family status and the taxpayer's tax scale (A, B, C or H).

From net to gross: determining the salary yielding the targeted net

During job interviews or discussions on construction sites, negotiations often revolve around a net amount received at the end of the month. However, drawing up an employment contract requires entering a gross salary, whether monthly or hourly. Our tool therefore includes a reverse function: net-to-gross calculation.

In this mode, you enter the targeted monthly net pay. The system runs an iterative mathematical search to determine the exact gross amount that, once all previously configured social and tax deductions are removed, yields this net. If you work with an hourly wage, the system computes the hourly rate with four-decimal accuracy. When this hourly figure is rounded to the nearest standard cent to print the line, a tiny variation of a few cents may appear on the final net amount; the simulator transparently shows this rounding discrepancy.

As long as essential data is missing, the tool declines to produce an incomplete result. An empty field is never arbitrarily treated as zero. If information is lacking, the status remains flagged as incomplete and the To enter or correct panel lists each missing item with a direct shortcut to the relevant field. If certain deductions do not apply to your situation, you can manually enable the option to treat blank fields as zero.

Comparing two scenarios and reviewing the full year, including 13th-month salary

To prepare a labour budget or evaluate the impact of an insurance rate adjustment, the simulator provides a dynamic comparison between two assumptions, designated Scenario A and Scenario B. A dedicated button allows you to duplicate all parameters from Scenario A to Scenario B instantly, so you only need to adjust a single variable, such as applying a different sickness benefit rate or an increase in a pension fund contribution. The variance table immediately displays line-by-line differences.

The interface also offers a twelve-month projection. This annual view relies on a simple model: it takes twelve monthly payments identical to the one you have just configured as a baseline. When a 13th-month salary is set to be paid in December, it is incorporated at twelve times its monthly component. It is then subjected to standard social contribution deductions, while statutory annual ceilings for unemployment insurance, FAR early retirement and joint funds are strictly applied over the annual total.

This annual projection remains a theoretical model. It does not accommodate intra-year salary adjustments, absences due to illness or accidents compensated by third parties, or unpaid leave. Two final rounding modes can be selected: standard rounding to the nearest cent or commercial rounding to five cents.

What the free version does not cover, and next steps: Jobs and ERP

This in-browser calculator serves as a technical aid without legal claims. The tool does not automatically integrate collective agreements and carries out no regulatory arbitration. Upon generation, the printed document displays our brand watermark, CSV spreadsheet exports note the free version of the art-construction.ch website, and PDF exports include a text label indicating the free version. The PDF generation engine relies on standardised fonts: certain specific characters from regional languages (notably in Albanian, Croatian or Turkish) are automatically converted to their base Latin letters.

For works managers and business owners seeking long-term administration, our paid solution is the ERP (HR / Employees module). This module enables you to manage the employee register, store contracts and keep a comprehensive record of pay periods across construction sites. No data entered into this free simulator is transferred automatically to the ERP: you retain complete ownership of your information.

At the bottom of the page, simple pathways also enable you to post a vacancy on our Jobs service or create a professional profile to apply anonymously. Only the selected canton, qualification class and salary type are placed in the URL fragment after the hash symbol (#), which technically prevents the browser from sending these pieces of data to the server. You can also explore our tools for your tenders and prepare cost estimates for an offer for your future construction sites.

Frequently asked questions

Is my salary data sent to or stored on a server?

No. Calculations run entirely inside your web browser. No entered information is sent to a remote server or kept in your browser's local storage. As soon as you close the window or refresh the page, all numbers are permanently deleted. Be sure to export or print your figures before leaving.

Why are health insurance or LPP rates not pre-filled?

Every construction firm is affiliated with its own pension fund and arranges its daily sickness or accident benefit policies with different insurers. There is no single industry-wide rate. You must enter the exact rates or amounts specified in your employment contract, insurance policy or pension institution regulations.

How do I determine my withholding tax deduction rate?

The simulator stores no cantonal tax schedules. You must consult the official tax scale published by the relevant cantonal tax administration, matching your family circumstances (single, married, with or without children). Then enter the corresponding percentage into the appropriate form field.

What is the difference between hourly and monthly pay in the simulator?

Hourly pay determines the monthly base by multiplying the hourly wage by total normal hours, allowing an increased rate for overtime. Monthly pay applies a fixed lump sum: without a known hourly base, overtime cannot be calculated automatically and must be entered as a manual lump-sum amount.

Why does the calculation indicate that the result is incomplete?

In this simulator, an unfilled box is never treated as zero. To prevent estimation mistakes, the tool withholds partial results as long as mandatory fields are empty. You can use the Go to field button to provide the missing information or click the dedicated option to explicitly treat blank fields as zero.

Does the printed payslip have official legal status with authorities?

No. The generated document is a technical and arithmetic estimation aid. It does not serve as an official payslip for compensation offices, cantonal tax authorities or joint commissions. Only payslips issued by your employer or fiduciary, together with contractual affiliation documents, carry legal authority.

How does net-to-gross resolution work for hourly wages?

The algorithm determines the theoretical gross amount required to reach the targeted net salary using four-decimal precision on the hourly rate. When printing the final result, this hourly rate is rounded to the nearest cent, which can cause a marginal discrepancy of a few cents on the reconstructed net salary.